Steel Government Departments Closing in 0 days TDR #48150942

Tender For 2000164741-Overhauling Of Air Compressor_Asu-2

Issued by Government Departments · Hazira, Gujarat
Tender Value
Ref. Documents
Estimated cost
Bid Submission
13 Mar 2025
0 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Offline

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Hazira → Gujarat
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For 2000164741-Overhauling Of Air Compressor_Asu-2 2000164741 10 10 10 COMPLETE OVERHAULING OF AIR COMPRESSOR 1 NO Email : [email protected] Contact : Name : Sudhir Mistry Item Details : Technical Contact Person Mr. Sudhir Mistry , Mob No: 9879101927 Scope of Work- Vendor: A. Scope of Work for Overhauling of Air Compressor (Model: VK-50S) of ASU-2. Phase- 01: Dismantling Activities: Dismantling of Air Compressor, viz.: 1. Coupling guard, Gear coupling & drive shaft. 2. Inlet Guide Vane (IGV). 3. Interconnecting piping/ Casing. 4. Lubrication oil piping. 5. Top cover. 6. All volute casings. 7. Back plates. 8. Rotors and Bull gear. 9. Bearings of Rotors and Bull gear. Note: Bearing Clearance to be checked before dismantling for reference. 10. Gas Seals, Mouth Ring Seals & Oil Seals. 11. MOP & auxiliaries. Note: AMNS will make necessary arrangement for low-speed balancing work of rotors and bull gear set. Approximate time: 3 Weeks. Phase: 02: Assembly of Air Compressor: Maintenance of Lubrication Oil System of Air Compressor: a. Emptying out lubrication oil tank, internal cleaning and refilling of lubrication oil tank. b. Dismantling, Cleaning & refixing of oil Filters. c. Cleaning of oil lines. Assembly of Air Compressor viz. 1. Cleaning and Inspection of removed all parts and NDT of necessary parts to be done. 2. Shifting of necessary new spare part from plant store and restore worn out spares. 3. Cleaning and Inspection (NDT of necessary parts to be done) of new spare parts for necessary replacement. 4. Overhauling of Inlet Guide Vane (IGV). 5. Assembly of all dismantled/new parts with checking and adjusting of clearances as per OEM requirement Viz. Bearing clearance, seals clearance, Gear Backless, Blue matching etc. 6. Fixing of suction & discharge volute casings. 7. Trial run of lubrication system and rectification of any abnormalities. 8. Couple with drive (Motor) and alignment as per OEM norms. 9. Fixing of gear coupling top and bottom cover of drive shaft. 10. Trail run of Air compressor within desired operating parameters. 11. If any deviation observed in operational parameters during trail Page 2 of 2 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000130041 Date 06.03.2025 Submission Date 13.03.2025 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ null Shail Kumari Yadav Contact Email [email protected] MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details run, then same needs to be rectified and successful run to be completed. 12. Submission of detailed overhauling report (Soft copy and Hard copy) with all necessary data. 13. Overhauling Team includes, Mechanical Technicians/Fitters, Crane Operator, Engineers, Experts, Supervisors & Safety officers. 14. General tools & tackles, Special Tools Viz. Alignment Kit (If required) and precision measuring Tools required to carried out entire job. 15. Maintain safe and clean workplace during entire job execution. 16. Detailed job schedule to be submitted before starting the job and entire job should be executed round the clock (24 Hours) & completed within 6 days. 17. Job should be completed as per approved specifications, Drawings or as per direction and satisfaction of AM/NS supervisor/Area In charge. 18. Job completion certificate must be submitted and after approval of concern authority, invoice to be raised and upload in the invoice portal of AM/NS. 19. Follow AM/NS Security Access system called SCRUM at Hazira site for processing the Gate Pass (Gate pass formalities as per gate pass policy will take approx. 3 days.) 20. Lodging, boarding & transportation of Man & Material (To & Fro as well as Local Transportation includes inside plant premises). B. HSE Norms to be followed by Vendor: 1. Provide all general PPEs as per AM/NS HSE norms. 2. Comply with HSE policy as laid by AM/NS. 3. Ensure the safety of your personnel and follow all safety measures prescribed. 4. All your personnel will have to undergo HSE training. 5. Workers who perform W@H jobs have to undergo Work at Height Training to get work at height pass. 6. All your personnel will have to undergo a Medical Fitness check at our Care Nursing Home and obtain a fitness certificate. 7. All portable electrical/pneumatic tools used by vendor must be certified by an authorized engineer of AM/NS and certification must be duly valid at any point of time. 8. All the Tools & tackles and equipment used by vendor must be certified by competent authority for use in the factory. Such a certificate must be duly valid at any point of time. 9. Ensure all your personnel must be aware of the 5S process and clean the workplace at the end of a particular shift or completion of a job. 10. The movement of persons inside the plant by foot/bicycle/two wheelers is strictly prohibited, hence ensure availability of sufficient buses/vehicles for safe transportation of their associates from their place of residence to respective work location in the plant and back. C. Penalty Clause for Vendor: 1. Specific penalty of non-performance by vendor/associates and must be cardinally measured as follows: a) Non-conformity of Work. b) Noncompliance to HSE norms to be followed by Vendor (As described above). c) Violating any of the terms and conditions. Scope of Work- AMNSIL: 1. Providing necessary power, drinking water and Instrument Air. 2. Provide all necessary spares, Consumables for maintenance job. 3. Scaffolding if required. 4. Wok Permit Procedure.

AI Tender Summary

OUR REF NO 48150942
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 13-03-2025
Authority
Authority Name Arcelor Mittal Nippon Steel India Limited
Work Description Tender For 2000164741-Overhauling Of Air Compressor_Asu-2 2000164741 10 10 10 COMPLETE OVERHAULING OF AIR COMPRESSOR 1 NO Email : [email protected] Contact : Name : Sudhir Mistry Item Details : Technical Contact Person Mr. Sudhir Mistry , Mob No: 9879101927 Scope of Work- Vendor: A. Scope of Work for Overhauling of Air Compressor (Model: VK-50S) of ASU-2. Phase- 01: Dismantling Activities: Dismantling of Air Compressor, viz.: 1. Coupling guard, Gear coupling & drive shaft. 2. Inlet Guide Vane (IGV). 3. Interconnecting piping/ Casing. 4. Lubrication oil piping. 5. Top cover. 6. All volute casings. 7. Back plates. 8. Rotors and Bull gear. 9. Bearings of Rotors and Bull gear. Note: Bearing Clearance to be checked before dismantling for reference. 10. Gas Seals, Mouth Ring Seals & Oil Seals. 11. MOP & auxiliaries. Note: AMNS will make necessary arrangement for low-speed balancing work of rotors and bull gear set. Approximate time: 3 Weeks. Phase: 02: Assembly of Air Compressor: Maintenance of Lubrication Oil System of Air Compressor: a. Emptying out lubrication oil tank, internal cleaning and refilling of lubrication oil tank. b. Dismantling, Cleaning & refixing of oil Filters. c. Cleaning of oil lines. Assembly of Air Compressor viz. 1. Cleaning and Inspection of removed all parts and NDT of necessary parts to be done. 2. Shifting of necessary new spare part from plant store and restore worn out spares. 3. Cleaning and Inspection (NDT of necessary parts to be done) of new spare parts for necessary replacement. 4. Overhauling of Inlet Guide Vane (IGV). 5. Assembly of all dismantled/new parts with checking and adjusting of clearances as per OEM requirement Viz. Bearing clearance, seals clearance, Gear Backless, Blue matching etc. 6. Fixing of suction & discharge volute casings. 7. Trial run of lubrication system and rectification of any abnormalities. 8. Couple with drive (Motor) and alignment as per OEM norms. 9. Fixing of gear coupling top and bottom cover of drive shaft. 10. Trail run of Air compressor within desired operating parameters. 11. If any deviation observed in operational parameters during trail Page 2 of 2 ArcelorMittal Nippon Steel India Limited AM/NS HAZIRA PLANT 27th KM, Surat-Hazira Road,,HAZIRA,394270,Gujarat,India GSTIN 24AAACE1741P1ZN PAN AAACE1741P CIN U27100GJ1976FLC013787 Request for Quotation Number 6000130041 Date 06.03.2025 Submission Date 13.03.2025 Coll Req No AMNS deals with OEMs directly. We are very well equipped in every way to import / buy our goods directly from OEMs from any part of the world in a professional manner. We also use the vast global networks of our parent companies where necessary. We do not welcome any contact from intermediaries or Indian Agents of vendors. We assure all OEMs that you do not need to engage anyone to manage your transactions with us.Kindly respond to our RFQs and deal with our officials directly without involving any agents or intermediaries. Offers of vendors who insist on involving intermediaries in dealings with us could be disqualified. Contact for this RFQ null Shail Kumari Yadav Contact Email [email protected] MATERIALS / SERVICES Please acknowledge receipt of the RFQ And provide your best quote for below given RFQ details. SR. No PR No. PR Item RFQ Item Services for line Item Quantity UOM Technical Details Other Details run, then same needs to be rectified and successful run to be completed. 12. Submission of detailed overhauling report (Soft copy and Hard copy) with all necessary data. 13. Overhauling Team includes, Mechanical Technicians/Fitters, Crane Operator, Engineers, Experts, Supervisors & Safety officers. 14. General tools & tackles, Special Tools Viz. Alignment Kit (If required) and precision measuring Tools required to carried out entire job. 15. Maintain safe and clean workplace during entire job execution. 16. Detailed job schedule to be submitted before starting the job and entire job should be executed round the clock (24 Hours) & completed within 6 days. 17. Job should be completed as per approved specifications, Drawings or as per direction and satisfaction of AM/NS supervisor/Area In charge. 18. Job completion certificate must be submitted and after approval of concern authority, invoice to be raised and upload in the invoice portal of AM/NS. 19. Follow AM/NS Security Access system called SCRUM at Hazira site for processing the Gate Pass (Gate pass formalities as per gate pass policy will take approx. 3 days.) 20. Lodging, boarding & transportation of Man & Material (To & Fro as well as Local Transportation includes inside plant premises). B. HSE Norms to be followed by Vendor: 1. Provide all general PPEs as per AM/NS HSE norms. 2. Comply with HSE policy as laid by AM/NS. 3. Ensure the safety of your personnel and follow all safety measures prescribed. 4. All your personnel will have to undergo HSE training. 5. Workers who perform W@H jobs have to undergo Work at Height Training to get work at height pass. 6. All your personnel will have to undergo a Medical Fitness check at our Care Nursing Home and obtain a fitness certificate. 7. All portable electrical/pneumatic tools used by vendor must be certified by an authorized engineer of AM/NS and certification must be duly valid at any point of time. 8. All the Tools & tackles and equipment used by vendor must be certified by competent authority for use in the factory. Such a certificate must be duly valid at any point of time. 9. Ensure all your personnel must be aware of the 5S process and clean the workplace at the end of a particular shift or completion of a job. 10. The movement of persons inside the plant by foot/bicycle/two wheelers is strictly prohibited, hence ensure availability of sufficient buses/vehicles for safe transportation of their associates from their place of residence to respective work location in the plant and back. C. Penalty Clause for Vendor: 1. Specific penalty of non-performance by vendor/associates and must be cardinally measured as follows: a) Non-conformity of Work. b) Noncompliance to HSE norms to be followed by Vendor (As described above). c) Violating any of the terms and conditions. Scope of Work- AMNSIL: 1. Providing necessary power, drinking water and Instrument Air. 2. Provide all necessary spares, Consumables for maintenance job. 3. Scaffolding if required. 4. Wok Permit Procedure.
Basic Detail
Tender No AMNS/HAZ/720-SCC/0325-02/280730
Bidding Type Tender
Location
City Hazira
State Gujarat
Key Dates
Publish Date 07 Mar 2025
Submission Date 13 Mar 2025
Open Date 01 Jan 0001
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
30d6891f-9837-432a-a35c-a8fc456f2483.rar

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Mar 07, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Mar 13, 2025
17:00 IST

Bid Submission Deadline

Offline submission at the designated office.

Completed

Tender Documents

Download All (ZIP) ↓
rar

30d6891f-9837-432a-a35c-a8fc456f2483.rar

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender