Tender For Procurement Of Pressure Regulating Skid-Design And Procurement Ofpressure Reduction Skid For Ngnletekujaan Terminal Upto Nrl Iggl Pipeline Project
Tender Overview
Project Description
Tender For Procurement Of Pressure Regulating Skid-DESIGN AND PROCUREMENT OFPRESSURE REDUCTION SKID FOR NGNLETEKUJAAN TERMINAL UPTO NRL IGGL PIPELINE PROJECT, Vendor Shall Be Completely Responsible To Supply Below Mentioned Materials And Services For Satisfying The Functional / Operational Requirements Stated In This Material Requisition And Its Attachments: Pressure Regulating Skid (Prs): Inlet Pressure Of 42 Barg, Outlet Pressure Of 38.50-35 Barg And Flow Capacity Of 0.5 Mmscmd (Please Follow Attached Datasheet) Prs Shall Consist Of Dual Stream Regulation Skid, With Electronic Volume Correction Device Designed As Per Pngrb Regulations With Below Scope Of Supplies. Pressure Regulation (1W+1S) Configuration, Pressure Regulation Shall Be Automatic Change-Over Provision , Along With Necessary Instrumentation Such As Gauges (Pg, Pit, Tg, ), Pressure & Temperature Sensors, Valves ( Slam Shut-Off Valve), Pipe, Drain And Vent Lines, Tubes And Fittings And Accessories Like Expander, Reducer,Battery, Supply Of Hardwired Cable And Cabling, Junction Box, And Also Including Skid Canopy, P&Id, Data Sheets, Specifications Etc.,
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 10-Jun-2025 | Corrigendum 10 | Date | 17-Jun-2025 |
| 2 | 27-Mar-2025 | Corrigendum 1 | Date | 10-Apr-2025 |
| 3 | 10-Apr-2025 | Corrigendum 2 | Date | 18-Apr-2025 |
| 4 | 18-Apr-2025 | Corrigendum 7 | Date | 28-Apr-2025 |
| 5 | 28-Apr-2025 | Corrigendum 4 | Date | 05-May-2025 |
| 6 | 05-May-2025 | Corrigendum 5 | Date | 13-May-2025 |
| 7 | 05-May-2025 | REPLIES TO BIDDERS PRE BID QUERIES | Other | 13-May-2025 |
| 8 | 13-May-2025 | Corrigednum 6 | Date | 20-May-2025 |
| 9 | 20-May-2025 | Extension 7 | Date | 27-May-2025 |
| 10 | 22-May-2025 | REPLIES TO BIDDERS PRE BID QUERIES 2 | Other | 27-May-2025 |
| 11 | 27-May-2025 | Corrigendum 8 | Date | 03-Jun-2025 |
| 12 | 03-Jun-2025 | Date Extension | Date | 10-Jun-2025 |
| 13 | 04-Jun-2025 | REPLIES TO BIDDERS PRE BID QUERIES 3 | Other | 10-Jun-2025 |
BOQ
| Sl. No. | Item Description |
| 1 | SUPPLY, INSTALLATION, TESTING, COMMISSIONING OF FOLLOWING ITEMS |
| 2 | Vendor shall be completely responsible to supply below mentioned materials and services for satisfying the functional / operational requirements stated in this Material Requisition and its Attachments: Pressure Regulating Skid (PRS): Inlet pressure of 42 Barg, Outlet pressure of 38.50-35 Barg and flow capacity of 0.5 MMSCMD (Please follow attached datasheet)PRS shall consist of dual stream Regulation Skid, with Electronic Volume Correction device designed as per PNGRB regulations with below scope of supplies.Pressure Regulation (1W+1S) configuration, Pressure Regulation shall be automatic change-over provision , along with necessary Instrumentation such as gauges (PG, PIT, TG, ), Pressure & Temperature Sensors, valves ( Slam shut-off valve), Pipe, drain and vent lines, Tubes and fittings and accessories like Expander, Reducer,battery, supply of hardwired cable and cabling, junction box, and also including skid canopy, P&ID, Data sheets, Specifications etc., |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-6 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-7 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-8 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-9 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-10 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-11 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-12 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-13 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender