Bids Are Invited For Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C423 and ICGS Rajveer; H093 Following defect to be rectified on ships RIB aAir leakage observed from two in no air filling chamber Air chamber to be repaired and pr.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C423 and ICGS Rajveer; H094 cloth covers of wheel house captains chair seat cover worn out Same to be renewed as per sampleSize 250 cm X 70 cm approx; Service Provi.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C423 and ICGS Rajveer; H095 Following equipment cover has been worn out Same to be renewed as per sample Material white canvas Equipment .. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C423 and ICGS Rajveer; H096 03 nos fire extinguisher wooden base broken same to be renewed as per sample; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C423 and ICGS Rajveer; H097 04 nos hinges of petrol locker at quarter deck uprooted Locking arrangement of petrol locker to be repaired 02 nos hinges of each door o.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C423 and ICGS Rajveer; H098 Sun mica of DC locker dining area cupboard uprooted and cracked Same to be renewed Area 4 sqMtr; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C423 and ICGS Rajveer; H099 01 in no wind socks deteriorated Same to be renewed as per sample Mat SS; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C423 and ICGS Rajveer; H100 01 in no BA controller board deteriorated perished and cracked Same to fabricated as per sample Job includes stickering work as per s.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C423 and ICGS Rajveer; H101 Stickers of ships RIB and 08 no lifebuoy indicating C423 and Indian Coast Guard worn out Same to be renewed as per sample; Service Pro.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C423 and ICGS Rajveer; H102 EPs bath room fitting are defective Same to be repairedrenewed as per sample In way jobs includes 02 in nos bath room shower and 03 in n.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C423 and ICGS Rajveer; H103 Ships washing machine fully automatic is not working view its drum unbalanced from base and abnormal sound observed from drum motor Defe.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C423 and ICGS Rajveer; H104 Ship RO plant not working All filter and membrane chocked RO plant needs to be overhauled for satisfactory operaion Make Kent RO water p.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C423 and ICGS Rajveer; H105 Ships equipment and watertight risk marking is faded during the super structure painting same to be marked; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C423 and ICGS RAJVEER; H106 PVC flooring of dining area including alleyway 9 rating Jr Sls mess including front area perished Same to be renewed as per sample Area5.. , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C423 and ICGS RAJVEER; H006 CRN91 race ring cover continuously get rusted Race ring cover to be fabricated Mat SS length 3m Width inch; Service Provider , Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - ICGS C423 and ICGS RAJVEER; H005 01 in no Gemini aluminum keel bent and inflatable body tears from 34 places during boarding operation at sea Same to be repaired renewed REPAIRING OF ICGS C-423 & ICGS RAJVEER Total Quantity :