| 1 | [20.114.1]Supplying erection, testing of fully automatic electric control panel board for T/Wells in Pump Chamber consisting of MS sheet of thickness 14 gauge duly painted box type floor mounted made of angle Frame containing 1 no. fullyautomatic air brake starter suitable for Motor of the following capacity, Min switch of suitable range with HRC fuse, 1no. volt meter (0 to 500 volts), 1 No. Amp. Meter of 0 to 100 amp. 3 sets of indicating lamp capacitor of suitablecapacity and 1 no. single phase preventers with the timer switch including wiring in panel board and suitable electric energy meter wiring in Electric Control Panel Board complete in all respect as per specification given in Schedule No. II,Including MCB, suitable, Capacitor, Wooden Box etc as per site requirement complete in all respect. 1. 10 HP Motor [Through Rate] |
| 2 | [23.22.5.1]MCCB ,DISTRIBUTION BOARDS, MCB`s, RCCB`s, CHANGE OVER etc. 5.1. Supply and erection of miniature circuit Breaker240/415 V in the existing distribution board including making necessary connections:- 6 amp. to 32 amp Single Pole [Through Rate] |
| 3 | [24.1.1]EARTHING AND LIGHTENING ARRESTOR 1. Earthing with GL earth pipe 4.5 m long and 40 mm dia with masonry enclosures on the top etc. (but without charcoal or coke and salt) as required. [Through Rate] |
| 4 | [24.1.2]EARTHING AND LIGHTENING ARRESTOR 2. Extra for using salt and char coal/coke for pipe earth electrode as required. [Through Rate] |
| 5 | [24.13.32]LT CABLES (Aluminium Conductor, Armoured and Unarmoured) PROVIDING& ERECTION/ LAYING OF PVC/ XLPE INSULATED UNDERGROUND ALUMINIUM CONDUCTOR UNDERGROUND CABLE LOOSE IN EXISTING PIPE OR TRENCHES COMPLETE IN ALL RESPECT WITH NECESSARY CONNECTION UPTO THE ENTIRE SATISFACTION OF ENGINEER IN CHARGE OF THE WORK 32.25 Sq mm 4 core (Arm.) [Through Rate] |
| 6 | [24.13.40]LT CABLES (Aluminium Conductor, Armoured and Unarmoured) PROVIDING& ERECTION/ LAYING OF PVC/ XLPE INSULATED UNDERGROUND ALUMINIUM CONDUCTOR UNDERGROUND CABLE LOOSE IN EXISTING PIPE OR TRENCHES COMPLETE IN ALL RESPECT WITH NECESSARY CONNECTION UPTO THE ENTIRE SATISFACTION OF ENGINEER IN CHARGE OF THE WORK 40.35 Sq mm 4 core (Arm.) [Through Rate] |
| 7 | [24.2.8.5]LT CABLE 8.5. Supply and erection of aluminium lugs heavy duty including crimping etc. up to the entire satisfaction of the Engineer-in-charge of the work. 25 sqmm [Through Rate] |
| 8 | [24.4.15.1]STREET LIGHT 15.1. B.S.E.N. 10025 High Masts\"Supply, installation, testing and commissioning of 12.5 mtr. long High Mast manufactured from B.S.E.N. 10025 or equivalent grade material in, 2 (two) section hot dip, galvanized inside and outside in single dip, suitable for wind velocity as per IS 875 Part-3 suitable for 6 nos. luminaire loading fully motorized (power tool) with starter & cable complete along with standard accessories supplied by the manufacturer with 3 nos. steel wire rope double drum system and twin dome aviation light with LED without foundation but including cost of set of foundation nut and bolts, installation at site complete in all respect upto entire satisfaction of Engineer -in-ChargeThickness of Top and Bottom Section = 3 mm (minimum)Top Dia = 150 mm and Bottom Dia = 360mmThickness of Galvanization - Top = 65 micron (minimum) andBottom = 85 micron (minimum)\" [Through Rate] |
| 9 | [24.5.2.3]MISCELLANEOUS ITEMS 2.3. S/E mark double walled corrugated (DWC) HDPE, pipe 10 Kg/Cm2 ,laid 0.75 Metre below ground level including digging and refilling of earth including cost of suitable size socket/coupler for HDPE pipe including the cost of labour and material required to complete the job in all respect up to the entire satisfaction of Engineer in charge of the work.DWC/HDPE pipe 63/50 mm outer dia/inner dia [Through Rate] |
| 10 | [24.9.1]RCC FOUNDATIONS FOR HIGH MAST OCTAGONAL POLES 1. Providing RCC foundation of M25 grade (1 Cement:1 Stone aggregate: 2 Coarse sand) i/c excavation, steel reinforcement (Fe 500) @ 75 kg/cum of concrete contents, concrete cover 50mm, anchor bolts etc. over a bed of PCC 1:5:10 of required dimensions for high mast octagonal poles of various heights as per following specifications complete in all respects and as per directions of Engineer-in-charge 12.5 m high mast pole [Through Rate] |