| 1 | Description |
| 2 | Excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A- 1/259) |
| 3 | Refilling the trenches with availableexcavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete. |
| 4 | Providing and laying in situ Cement Concrete of trap/ granite / quartzite / gneiss metal for RCC work in foundation like raft, grillage, strip foundation and footing of RCC columns and steel stanchions including normal dewatering, form work, compaction, finishing and curing, etc. complete. (By weigh batching and mix design for M250 and M-300 only. Use of L&T, A.C.C., Ambuja, Birla Gold, Manikgad, Rajashree, etc. cement is permitted.) (Excluding M.S. or Tor reinforcement) |
| 5 | Providing and fixing in position steel bar reinforcement of various diameters for RCC piles, caps, footings, foundations, slabs, beams, columns, canopies, staircases, newels, chajjas, lintels, pardies, copings, fins, arches, etc. as per detailed designs, drawings and schedules; including cutting, bending, hooking the bars, binding with wires or tack welding and supporting as required, etc. complete (including cost of binding wire). (Bd-F 17/306). |
| 6 | Dewatering the excavated trenches andpools of water in the building trenches /pipeline trenches, well works by using pumpsand other devices including disposing offwater to safe distance as directed byEngineer-in-charge (including cost ofmachinery, labour, fuel), etc. complete. (Bd-A 9/261) |
| 7 | Manufacturing, providing and supplying spirally welded / ERW/ SAW / fabricated M. S. pipes (Commercial Quality) including procurements of plates, gas cutting to requried size rolling, tack welding assembling in suitable lengths to form pipes, welding on automatic welding machine and forming ‘V’ edge on both ends of pipes including railway freight, insurance, unloading from railway wagon, loading into truck, transport to stores, unloading, stacking excluding GST levied by GOI & GOM in all respect, etc, complete as per IS - 3589 and IS-5504 as applicable as per specifications (No negative tolerance in thickness is permissible). |
| 8 | Lowering, laying in position to correct line and level including M. S. specials with / without any outcoating such as distance pieces, straps, bends, tapers, etc. on pedestals or chairs upon formation. The rate to include loading, unloading, hoisting, marginal cutting wherever required, assembling and tack welding, and transportation upto 500M etc.complete. |
| 9 | Hydraulic testing of M.S. pipeline to specified pressure including cost of all materials and labour and water for testing for the length upto 1km., using reciprocating type pumps which should be able to provide specified test pressure gauges and other necessary equipments, labour, operation charges, etc. required for testing. The rate under this item shall also include cost of retesting,if necessary |
| 10 | Rebate for dismental pipe including conveyance of dismental pipe etc. Complete. |
| 11 | Valve chamber with precast steel fibre reinforced concrete frame and covers (S.F.R.C. frame and covers) Providing and constructing B.B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCCbedding, excluding excavation, B.B. masonry in CM 1:5 proportion precast S.F.R.C. frame and cover, etc. complete as directed by Engineer-in-charge. |
| 12 | Engaging machinary as per site conditions including transportation fuel operator etc. |
| 13 | Engaging machinary as per site conditions including transportation fuel operator etc. |