| 1 | WATER SUPPLY SCHEME |
| 2 | Grease |
| 3 | Gland rope |
| 4 | Cut out fuse 200A |
| 5 | Fuse wire |
| 6 | Deo wire |
| 7 | Supplying & erecting crimping type aluminium lugs of for cable of 70 sq.mm complete |
| 8 | Supplying & erecting crimping type aluminium lugs of for cable of 95 sq.mm complete |
| 9 | Supplying & erecting crimping type aluminium lugs of for cable of 120 sq.mm complete |
| 10 | Supplying & erecting crimping type aluminium lugs of for cable of 185 sq.mm complete |
| 11 | Supplying & erecting crimping type aluminium lugs of for cable of 240 sq.mm complete |
| 12 | Supplying & erecting crimping type aluminium lugs of for cable of 300 sq.mm complete |
| 13 | Supplying , erecting & terminating 4 x 70 sq. mm. aluminium 11 kV(E), XLPE armoured cable on wall/ceiling or laid in provided trench / pipe |
| 14 | Supplying , erecting & terminating 4 x 95 sq. mm. aluminium 11 kV(E), XLPE armoured cable on wall/ceiling or laid in provided trench / pipe |
| 15 | Supplying , erecting & terminating 4 x 120 sq. mm. aluminium 11 kV(E), XLPE armoured cable on wall/ceiling or laid in provided trench / pipe |
| 16 | Supplying , erecting & terminating 4 x 185 sq. mm. aluminium 11 kV(E), XLPE armoured cable on wall/ceiling or laid in provided trench / pipe |
| 17 | Supplying , erecting & terminating 4 x 240 sq. mm. aluminium 11 kV(E), XLPE armoured cable on wall/ceiling or laid in provided trench / pipe |
| 18 | Supplying , erecting & terminating 4 x 300 sq. mm. aluminium 11 kV(E), XLPE armoured cable on wall/ceiling or laid in provided trench / pipe |
| 19 | Rewinding of electric motor of 3 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year(The dismantled material shall be retained by the contractor.) |
| 20 | Rewinding of electric motor of 5 H.P three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year (The dismantled material shall be retained by the contractor.) |
| 21 | Rewinding of electric motor of 10 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year (The dismantled material shall be retained by the contractor.) |
| 22 | Rewinding of electric motor of 15 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year (The dismantled material shall be retained by the contractor.) |
| 23 | Rewinding of electric motor of 30 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year (The dismantled material shall be retained by the contractor.) |
| 24 | Rewinding of electric motor of 50 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year (The dismantled material shall be retained by the contractor.) |
| 25 | Rewinding of electric motor of VT 100 H.P. three phase upto 1400 RPM of all types and makes with copper wire, overhauling with minor repairs, lubricating of ball bearings & bush bearing, and replacing screws etc. testing for the original speed and no load consumption with guarantee for one year (The dismantled material shall be retained by the contractor.) |
| 26 | Servicing ,varnishing and greasing of 3 H.P. motor |
| 27 | Servicing ,varnishing and greasing of 5 H.P. motor |
| 28 | Servicing ,varnishing and greasing of 10 H.P. motor |
| 29 | Servicing ,varnishing and greasing of 15 H.P. motor |
| 30 | Servicing ,varnishing and greasing of 30 H.P. motor |
| 31 | Servicing ,varnishing and greasing of 50 H.P. motor |
| 32 | Servicing ,varnishing and greasing of VT 100 H.P. motor |
| 33 | Servicing, oiling, greasing of 3 H.P. Pump |
| 34 | Servicing oiling, greasing of 5 H.P. Pump |
| 35 | Servicing oiling, greasing of 10 H.P. Pump |
| 36 | Servicing oiling, greasing of 15 H.P. Pump |
| 37 | Servicing oiling, greasing of 30 H.P. Pump |
| 38 | Servicing oiling, greasing of 50 H.P. Pump |
| 39 | Servicing oiling, greasing of VT 100 H.P. Pump |
| 40 | Servicing oiling, greasing of all gear box |
| 41 | Replacing the existing bearing of approved make for electric motor of 3 H.P. of all types with due alignment of the shaft and tested. |
| 42 | Replacing the existing bearing of approved make for electric motor of 5 H.P. of all types with due alignment of the shaft and tested. |
| 43 | Replacing the existing bearing of approved make for electric motor of 10 H.P. of all types with due alignment of the shaft and tested. |
| 44 | Replacing the existing bearing of approved make for electric motor of 15 H.P. of all types with due alignment of the shaft and tested. |
| 45 | Replacing the existing bearing of approved make for electric motor of 30 H.P. of all types with due alignment of the shaft and tested. |
| 46 | Replacing the existing bearing of approved make for electric motor of 50 H.P. of all types with due alignment of the shaft and tested. |
| 47 | Replacing the existing bearing of approved make for electric motor of VT 100 H.P. of all types with due alignment of the shaft and tested. |
| 48 | Replacing the existing bearing of approved make for pump of 3 H.P. of all types with due alignment of the shaft and tested. |
| 49 | Replacing the existing bearing of approved make for pump of 5 H.P. of all types with due alignment of the shaft and tested. |
| 50 | Replacing the existing bearing of approved make for pump of 10 H.P. of all types with due alignment of the shaft and tested. |
| 51 | Replacing the existing bearing of approved make for pump of 15 H.P. of all types with due alignment of the shaft and tested. |
| 52 | Replacing the existing bearing of approved make for pump of 30 H.P. of all types with due alignment of the shaft and tested. |
| 53 | Replacing the existing bearing of approved make for pump of 50 H.P. of all types with due alignment of the shaft and tested. |
| 54 | Replacing the existing bearing of approved make for pump of VT 100 H.P. of all types with due alignment of the shaft and tested. |
| 55 | Supplying and erecting DOL Starter for 3 H.P motor |
| 56 | Supplying and erecting DOL Starter for 5 H.P motor |
| 57 | Supplying & erecting contactor for Star Delta motor starter of 10 H.P. |
| 58 | Supplying & erecting contactor for Star Delta motor starter of 15 H.P. |
| 59 | Supplying & erecting contactor for Star Delta motor starter of 30 H.P. |
| 60 | Supplying & erecting contactor for Star Delta motor starter of 50 H.P. |
| 61 | Supplying & erecting contactor for Star Delta motor starter of VT 100 H.P. |
| 62 | Supplying, erecting & marking MCCB of 3 H.P. starter |
| 63 | Supplying, erecting & marking MCCB of 5 H.P. starter |
| 64 | Supplying, erecting & marking MCCB of 10 H.P. starter |
| 65 | Supplying, erecting & marking MCCB of 15 H.P. starter |
| 66 | Supplying, erecting & marking MCCB of 30 H.P. starter |
| 67 | Supplying, erecting & marking MCCB of 50 H.P. starter |
| 68 | Supplying, erecting & marking MCCB of VT 100 H.P. starter |
| 69 | Supplying, erecting & marking MCCB of 40 A |
| 70 | Supplying, erecting & marking MCCB of 100 A |
| 71 | Supplying, erecting & marking MCCB of 160 A |
| 72 | Supplying, erecting & marking MCCB of 200 A |
| 73 | Supplying, erecting & marking MCCB of 300 A |
| 74 | Supplying & erecting relay for Star Delta motor starter of 10 H.P |
| 75 | Supplying & erecting relay for Star Delta motor starter of 15 H.P |
| 76 | Supplying & erecting relay for Star Delta motor starter of 30 H.P |
| 77 | Supplying & erecting relay for Star Delta motor starter of 50 H.P |
| 78 | Supplying & erecting relay for Star Delta motor starter of VT 100 H.P |
| 79 | Supplying & erecting timer for Star Delta motor starterof 10 H.P. |
| 80 | Supplying & erecting timer for Star Delta motor starterof 15 H.P. |
| 81 | Supplying & erecting timer for Star Delta motor starterof 30 H.P. |
| 82 | Supplying & erecting timer for Star Delta motor starterof 50 H.P. |
| 83 | Supplying & erecting timer for Star Delta motor starterof VT 100 H.P. |
| 84 | Supplying and erecting of any size electrolyte copper patti or bar inbus bar chamber in panel or any other purpose, 500 V with require capacity with 99.9% copper purity with fixing arrangement (like lug or bottle type lug) to both the end with high grade polyolefin insulation sleeve. |
| 85 | Supplying and erecting of any size electrolyte aluminium Patti or bar inbus bar chamber in panel or any other purpose, 500 V with require capacity with 99.9% copper purity with fixing arrangement (like lug or bottle type lug) to both the end with high grade polyolefin insulation sleeve. |
| 86 | Supplying and erecting current transformer coil with insulation |
| 87 | Supplying and erectingof digital voltmeter of all type starter |
| 88 | Supplying and erectingof digital ammeter of all type starter |
| 89 | Providing, erecting pressure gauge of required range complete with siphon tube, isolating dock suitable for 12 mm dia G.Z pipe. |
| 90 | Rewinding of 30 Hp starter auto transformer |
| 91 | Rewinding of 50 Hp starter auto transformer |
| 92 | Rewinding of 100 Hp starter auto transformer |
| 93 | Servicing and greasing ofAB switch |
| 94 | Supplying and erecting 200 Amp change over switch |
| 95 | Supplying and erecting 400 Amp change over switch |
| 96 | Supplying and erecting 63 Amp main switch |
| 97 | Supplying and erecting 200 Amp main switch |
| 98 | Supplying and erecting 250 Amp main switch |
| 99 | Supplying and erecting 400 Amp main switch |
| 100 | Supplying and erecting of contactor kit of all starter |
| 101 | Supplying and erecting of no volt coil |
| 102 | Supplying and erecting of OCB |
| 103 | Supplying and erecting of OCB coil |
| 104 | Supplying and erecting of moving tip contact assembly |
| 105 | Supplying and erecting of moving tip contactor |
| 106 | Supplying and topping up filtered transformer oil of approved make with test certificate. |
| 107 | Filtration of Transformer oil on site till satisfactory test results. |
| 108 | Supplying and erecting of transformer packing |
| 109 | Supplying and erecting of HT/LT stud |
| 110 | Supplying and erecting of air breather |
| 111 | Supplying and erecting bank of all polyprolstene capacitors. |
| 112 | Supplying , erecting and giving test and trial of 10 H.P. stuffing box |
| 113 | Supplying , erecting and giving test and trial of 15 H.P. stuffing box |
| 114 | Supplying , erecting and giving test and trial of 30 H.P. stuffing box |
| 115 | Supplying , erecting and giving test and trial of 50 H.P. stuffing box |
| 116 | Supplying , erecting and giving test and trial of VT 100 H.P. stuffing box |
| 117 | Supplying , erecting and giving test and trial of 3 H.P. gland bush |
| 118 | Supplying , erecting and giving test and trial of 5 H.P. gland bush |
| 119 | Supplying , erecting and giving test and trial of 10 H.P. gland bush |
| 120 | Supplying , erecting and giving test and trial of 15 H.P. gland bush |
| 121 | Supplying , erecting and giving test and trial of 30 H.P. gland bush |
| 122 | Supplying , erecting and giving test and trial of 50 H.P. gland bush |
| 123 | Supplying , erecting and giving test and trial of VT 100 H.P. gland bush |
| 124 | Supplying , erecting and giving test and trial of 3 H.P. shaft |
| 125 | Supplying , erecting and giving test and trial of 5 H.P. shaft |
| 126 | Supplying , erecting and giving test and trial of 10 H.P. shaft |
| 127 | Supplying , erecting and giving test and trial of 15 H.P. shaft |
| 128 | Supplying , erecting and giving test and trial of 30 H.P. shaft |
| 129 | Supplying , erecting and giving test and trial of 50 H.P. shaft |
| 130 | Supplying , erecting and giving test and trial of VT 100 H.P. shaft |
| 131 | Supplying , erecting and giving test and trial of 3 H.P. connection plate |
| 132 | Supplying , erecting and giving test and trial of 5 H.P. connection plate |
| 133 | Supplying , erecting and giving test and trial of 10 H.P. connection plate |
| 134 | Supplying , erecting and giving test and trial of 15 H.P. connection plate |
| 135 | Supplying , erecting and giving test and trial of 30 H.P. connection plate |
| 136 | Supplying , erecting and giving test and trial of 50 H.P. connection plate |
| 137 | Supplying , erecting and giving test and trial of VT 100 H.P. connection plate |
| 138 | Supplying , erecting and giving test and trial of gland sleeve of all pump |
| 139 | Supplying , erecting and giving test and trial of gland bush of all pump |
| 140 | Supplying , erecting and giving test and trial of gland cup of all pump |
| 141 | Supplying , erecting and giving test and trial of gland of all pump |
| 142 | Supplying strainer for VT 100 HP pump |
| 143 | Supplying , erecting, alignment and giving test and trial of coupling 3 H.P. pump |
| 144 | Supplying , erecting, alignment and giving test and trial of coupling 5 H.P. pump |
| 145 | Supplying , erecting, alignment and giving test and trial of coupling 10 H.P. pump |
| 146 | Supplying , erecting, alignment and giving test and trial of coupling 15 H.P. pump |
| 147 | Supplying , erecting, alignment and giving test and trial of coupling 30 H.P. pump |
| 148 | Supplying , erecting, alignment and giving test and trial of coupling 50 H.P. pump |
| 149 | Supplying , erecting, alignment and giving test and trial of coupling VT 100 H.P. pump |
| 150 | Alignment of pump-motor of 3 Hp |
| 151 | Alignment of pump-motor of 5 Hp |
| 152 | Alignment of pump-motor of 10 Hp |
| 153 | Alignment of pump-motor of 15 Hp |
| 154 | Alignment of pump-motor of 30 Hp |
| 155 | Alignment of pump-motor of 50 Hp |
| 156 | Alignment of pump-motor of VT 100 Hp |
| 157 | Supplying and erecting of lock ofpanel ,starter,etc. |
| 158 | Oil paper |
| 159 | Dismantling of 3 H.P pump |
| 160 | Dismantling of 5 H.P pump |
| 161 | Dismantling of 10 H.P pump |
| 162 | Dismantling of 15 H.P pump |
| 163 | Dismantling of 30 H.P pump |
| 164 | Dismantling of 50 H.P pump |
| 165 | Dismantling of VT 100 H.P pump |
| 166 | Assembling with over oiling of 3 H.P pump |
| 167 | Assembling with over oiling of 5 H.P pump |
| 168 | Assembling with over oiling of 10 H.P pump |
| 169 | Assembling with over oiling of 15 H.P pump |
| 170 | Assembling with over oiling of 30 H.P pump |
| 171 | Assembling with over oiling of 50 H.P pump |
| 172 | Assembling with over oiling of VT 100 H.P pump |
| 173 | Dismantling of 3 H.P Motor |
| 174 | Dismantling of 5 H.P Motor |
| 175 | Dismantling of 10 H.P Motor |
| 176 | Dismantling of 15 H.P Motor |
| 177 | Dismantling of 30 H.P Motor |
| 178 | Dismantling of 50 H.P Motor |
| 179 | Dismantling of VT 100 H.P Motor |
| 180 | Assembling of 3 H.P Motor |
| 181 | Assembling of 5 H.P Motor |
| 182 | Assembling of 10 H.P Motor |
| 183 | Assembling of 15 H.P Motor |
| 184 | Assembling of 30 H.P Motor |
| 185 | Assembling of 50 H.P Motor |
| 186 | Assembling of VT 100 H.P Motor |
| 187 | Electrician operator |
| 188 | Taking out and reinstalling Submersible pump-motor set from bore well for repairing |
| 189 | Rewinding of Submersible pump-motor set 0.5 HP |
| 190 | Rewinding of Submersible pump-motor set 0.75 HP |
| 191 | Rewinding of Submersible pump-motor set 1.0 HP |
| 192 | Rewinding of Submersible pump-motor set 1.5 HP |
| 193 | Rewinding of Submersible pump-motor set 2.0 HP |
| 194 | Rewinding of Submersible pump-motor set 3.0 HP |
| 195 | Rewinding of Submersible pump-motor set 5.0 HP |
| 196 | Rewinding of Submersible pump-motor set 7.5 HP |