Water Resources and Irrigation Government Departments Closing in 0 days TDR #48090063

Tender For Restoration, Repair And Maintenance Of Ofc Baramulla And Its Tributaries And Allied Nallahs On Its Left Side.

Issued by Government Departments · baramulla, Jammu And Kashmir
Tender Value
12 Lakhs
Estimated cost
Bid Submission
17 Mar 2025
0 days left
EMD
24000
Bank guarantee accepted
Document Fee
600
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
baramulla → Jammu And Kashmir
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Restoration, Repair And Maintenance Of Ofc Baramulla And Its Tributaries And Allied Nallahs On Its Left Side.- 1 Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. 2 Earth work in bulk excavation by mechanicalm eans (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. 3 Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil. 4 Deduct for not rolling with power roller of minimum 8 tonnes for banking excavated Earth in layers not exceeding 20 cm in depth. 5 Deduct for not watering the excavated earth for banking. 6 Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil. 7 Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kinds of soil. 8 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. 9 Filling / Hand-packing stones in wire-crates; excluding cost of crates and stones 10 Dumping stone excluding cost of stones. In Horizontal on level 11 Filling of available excavated Material behind the crates 12 Supply of boulders ( Nallah) excluding carriage and head load. 13 Supply of boulders (Quarry) nominal size 225 excluding carriage and head load. 14 Supply of quarry stone for masonry work excluding carriage and head load. 15 Labour charges for Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags/Earth or Sand. 16 Filling & placing in piostion Mega Geo bags with infilled material including cost of sewing and strings, Mega geo bags & infilled material (Earth=70%, Sand=30%), Complete job 17 Labour charges for FillingGeo bags with sand/ earth; including cost of sewing and strings; including cost of bags, Complete job 18 Opening out old wire crates those and re-binding after filling. 19 Loading/Unloading sand/ earth filled EC bags in lorries; lead upto 50m. 20 Placing in dry 21 Placing in Water 22 Supply and Stacking of sand at site excluding carraige 23 Supply and Stacking of good earth at site excluding carraige 24 Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) 25 Quarry 26 Nallah 27 Dry random rubble masonry with hard stone in foundation and plinth: 28 Quarry 29 Nallah 30 Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. 31 Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive. 32 Engagement of labour / Beldar, Mazdoor 33 Fitter 34 Mason 35 Carpenter 36 Hire charges of Tippers for disposal of unhygenic material/other depositions incl cost of fuel. 37 Hire charges of Tractors for disposal of unhygenic material/Other deposition incl. cost of fuel 38 Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. 39 Beyond 30cm girth upto and including 60cm girth. 40 Beyond 60cm girth upto and including 120cm girth 41 Providing and Laying PVC Polythene of special quality 42 Cutting Saw Machine 43 Dismantling old protection work including cutting of crates and stacking of stones 44 Carraige of materials by Mechanical transport 45 Earth upto 1 km 46 2 km 47 3 Km 48 4 km 49 5 km 50 Beyond 5 Km upto 10 km /km 51 Beyond 10 Km upto 20 km /km 52 Beyond 20 km /everyadditional Km 53 Crates upto 1 km 54 2 km 55 3 Km 56 4 km 57 5 km 58 Beyond 5 Km upto 10 km /km 59 Beyond 10 Km upto 20 km /km 60 Beyond 20 km /everyadditional Km 61 Stone upto 1 km 62 2 km 63 3 Km 64 4 km 65 5 km 66 Beyond 5 Km upto 10 km /km 67 Beyond 10 Km upto 20 km /km 68 Beyond 20 km /everyadditional Km 69 EC Bags upto 1 kms 70 2 km 71 3 Km 72 4 km 73 5 km 74 Beyond 5 Km upto 10 km /km 75 Beyond 10 Km upto 20 km /km 76 Beyond 20 km /everyadditional Km 77 Sand upto 1 kms 78 2 km 79 3 Km 80 4 km 81 5 km 82 Beyond 5 Km upto 10 km /km 83 Beyond 10 Km upto 20 km /km 84 Beyond 20 km /everyadditional Km 85 Carraige of materials by Manual Means 86 Earth for first 50 mtrs. 87 for every additional 50 mtrs 88 Crates for first 50 mtrs. 89 for every additional 50 mtrs 90 Stones/ Boulders for first 50 mtrs. 91 for every additional 50 mtrs 92 Bags for first 50 mtrs. 93 for every additional 50 mtrs 94 Sand for first 50 mtrs. 95 for every additional 50 mtrs 96 Engagement of boat along with boatman during floods. 97 Hiring of dewatering pump incl fuel/operator charges 98 Engagement of vechile/Taxi for carrying staff to different sites during raids, Encroachment drives and flood like situations. 99 Supply of wire Crates 4x4 and 4 mm dia wire incl all carriages upto site of work 100 Repairs of water supply system Electric system in Divisional and Sub Divisional offices(Complete job) 101 Making of Flux Banners for awareness camps etc 102 Providing of POL for Cutters Generators and other Machinery as per the requirement 103 Supply of Petrol 104 Supply of Diesel 105 Supply of M Oil 106 Steel Reinforcement for RCC work incl. strightening cutting, bending placing in position and binding all complete upto plinth level(Mild steel bars. 107 Structural steel work in single section, fixed with or without connecting plate incl. cutting hoisting fixing in position and applying a priming coat of approved steel primer all complete. 108 Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. 109 Riveted and bolted 110 Welded 111 Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like 112 Centering and shuttering including strutting, propping etc. and removal of form for: 113 Foundations, footings, bases of columns etc. for mass concrete. 114 Walls (any thickness) including attached pilasters, buttresses, plinth 115 Suspended floors, roofs, landings, balconies and access platform 116 Welding, including transportation of plant at site etc. complete job 117 By Gas Plant 118 By Electric Plant 119 Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with1:3:6(1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 120 Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) 121 Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) 122 Repairs to brush cutters, wood cutters and other tools and machinery. 123 Engagement of Hydrulic Excavator for Removal of fallen trees and other obstructions in rivers and Nallahs and other emergencies(To be carried out as per the directions of Engineer Incharge)

BOQ

Name of Work: Restoration, Repair and Maintainance of OFC Baramulla and its tributaries and allied Nallahs on its Left Side .(Amount of Work:- Rs 12.00 Lacs)
Sl. No. Item Description
1Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil.
2Earth work in bulk excavation by mechanicalm eans (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil.
3Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil.
4Deduct for not rolling with power roller of minimum 8 tonnes for banking excavated Earth in layers not exceeding 20 cm in depth.
5Deduct for not watering the excavated earth for banking.
6Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil.
7Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kinds of soil.
8Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
9Filling / Hand-packing stones in wire-crates; excluding cost of crates and stones
10Dumping stone excluding cost of stones. In Horizontal on level
11Filling of available excavated Material behind the crates
12Supply of boulders ( Nallah) excluding carriage and head load.
13Supply of boulders (Quarry) nominal size 225 excluding carriage and head load.
14Supply of quarry stone for masonry work excluding carriage and head load.
15Labour charges for Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags/Earth or Sand.
16Filling & placing in piostion Mega Geo bags with infilled material including cost of sewing and strings, Mega geo bags & infilled material (Earth=70%, Sand=30%), Complete job
17Labour charges for FillingGeo bags with sand/ earth; including cost of sewing and strings; including cost of bags, Complete job
18Opening out old wire crates those and re-binding after filling.
19Loading/Unloading sand/ earth filled EC bags in lorries; lead upto 50m.
20Placing in dry
21Placing in Water
22Supply and Stacking of sand at site excluding carraige
23Supply and Stacking of good earth at site excluding carraige
24Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand)
25Quarry
26Nallah
27Dry random rubble masonry with hard stone in foundation and plinth:
28Quarry
29Nallah
30Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
31Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive.
32Engagement of labour / Beldar, Mazdoor
33Fitter
34Mason
35Carpenter
36Hire charges of Tippers for disposal of unhygenic material/other depositions incl cost of fuel.
37Hire charges of Tractors for disposal of unhygenic material/Other deposition incl. cost of fuel
38Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.
39Beyond 30cm girth upto and including 60cm girth.
40Beyond 60cm girth upto and including 120cm girth
41Providing and Laying PVC Polythene of special quality
42Cutting Saw Machine
43Dismantling old protection work including cutting of crates and stacking of stones
44Carraige of materials by Mechanical transport
45Earth upto 1 km
462 km
473 Km
484 km
495 km
50Beyond 5 Km upto 10 km /km
51Beyond 10 Km upto 20 km /km
52Beyond 20 km /everyadditional Km
53Crates upto 1 km
542 km
553 Km
564 km
575 km
58Beyond 5 Km upto 10 km /km
59Beyond 10 Km upto 20 km /km
60Beyond 20 km /everyadditional Km
61Stone upto 1 km
622 km
633 Km
644 km
655 km
66Beyond 5 Km upto 10 km /km
67Beyond 10 Km upto 20 km /km
68Beyond 20 km /everyadditional Km
69EC Bags upto 1 kms
702 km
713 Km
724 km
735 km
74Beyond 5 Km upto 10 km /km
75Beyond 10 Km upto 20 km /km
76Beyond 20 km /everyadditional Km
77Sand upto 1 kms
782 km
793 Km
804 km
815 km
82Beyond 5 Km upto 10 km /km
83Beyond 10 Km upto 20 km /km
84Beyond 20 km /everyadditional Km
85Carraige of materials by Manual Means
86Earth for first 50 mtrs.
87for every additional 50 mtrs
88Crates for first 50 mtrs.
89for every additional 50 mtrs
90Stones/ Boulders for first 50 mtrs.
91for every additional 50 mtrs
92Bags for first 50 mtrs.
93for every additional 50 mtrs
94Sand for first 50 mtrs.
95for every additional 50 mtrs
96Engagement of boat along with boatman during floods.
97Hiring of dewatering pump incl fuel/operator charges
98Engagement of vechile/Taxi for carrying staff to different sites during raids, Encroachment drives and flood like situations.
99Supply of wire Crates 4\"\"x4\"\" and 4 mm dia wire incl all carriages upto site of work
100Repairs of water supply system Electric system in Divisional and Sub Divisional offices(Complete job)
101Making of Flux Banners for awareness camps etc
102Providing of POL for Cutters Generators and other Machinery as per the requirement
103Supply of Petrol
104Supply of Diesel
105Supply of M Oil
106Steel Reinforcement for RCC work incl. strightening cutting, bending placing in position and binding all complete upto plinth level(Mild steel bars.
107Structural steel work in single section, fixed with or without connecting plate incl. cutting hoisting fixing in position and applying a priming coat of approved steel primer all complete.
108Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
109Riveted and bolted
110Welded
111Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like
112Centering and shuttering including strutting, propping etc. and removal of form for:
113Foundations, footings, bases of columns etc. for mass concrete.
114Walls (any thickness) including attached pilasters, buttresses, plinth
115Suspended floors, roofs, landings, balconies and access platform
116Welding, including transportation of plant at site etc. complete job
117By Gas Plant
118By Electric Plant
119Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with1:3:6(1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
120Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
121Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
122Repairs to brush cutters, wood cutters and other tools and machinery.
123Engagement of Hydrulic Excavator for Removal of fallen trees and other obstructions in rivers and Nallahs and other emergencies(To be carried out as per the directions of Engineer Incharge)

AI Tender Summary

OUR REF NO 48090063
AUTHORITY Government Departments
TENDER VALUE 12 Lakhs
LAST DATE 17-03-2025
Authority
Authority Name Irrigation And Flood Control Department
Work Description Tender For Restoration, Repair And Maintenance Of Ofc Baramulla And Its Tributaries And Allied Nallahs On Its Left Side.- 1 Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. 2 Earth work in bulk excavation by mechanicalm eans (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. 3 Earth work in rough excavation, banking excavated earth in layers not exceeding 20 cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m in all kinds of soil. 4 Deduct for not rolling with power roller of minimum 8 tonnes for banking excavated Earth in layers not exceeding 20 cm in depth. 5 Deduct for not watering the excavated earth for banking. 6 Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil. 7 Extra for every additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kinds of soil. 8 Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. 9 Filling / Hand-packing stones in wire-crates; excluding cost of crates and stones 10 Dumping stone excluding cost of stones. In Horizontal on level 11 Filling of available excavated Material behind the crates 12 Supply of boulders ( Nallah) excluding carriage and head load. 13 Supply of boulders (Quarry) nominal size 225 excluding carriage and head load. 14 Supply of quarry stone for masonry work excluding carriage and head load. 15 Labour charges for Filling empty cement bags with sand/ earth; including cost of sewing and strings; excluding cost of bags/Earth or Sand. 16 Filling & placing in piostion Mega Geo bags with infilled material including cost of sewing and strings, Mega geo bags & infilled material (Earth=70%, Sand=30%), Complete job 17 Labour charges for FillingGeo bags with sand/ earth; including cost of sewing and strings; including cost of bags, Complete job 18 Opening out old wire crates those and re-binding after filling. 19 Loading/Unloading sand/ earth filled EC bags in lorries; lead upto 50m. 20 Placing in dry 21 Placing in Water 22 Supply and Stacking of sand at site excluding carraige 23 Supply and Stacking of good earth at site excluding carraige 24 Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) 25 Quarry 26 Nallah 27 Dry random rubble masonry with hard stone in foundation and plinth: 28 Quarry 29 Nallah 30 Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. 31 Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive. 32 Engagement of labour / Beldar, Mazdoor 33 Fitter 34 Mason 35 Carpenter 36 Hire charges of Tippers for disposal of unhygenic material/other depositions incl cost of fuel. 37 Hire charges of Tractors for disposal of unhygenic material/Other deposition incl. cost of fuel 38 Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunk and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. 39 Beyond 30cm girth upto and including 60cm girth. 40 Beyond 60cm girth upto and including 120cm girth 41 Providing and Laying PVC Polythene of special quality 42 Cutting Saw Machine 43 Dismantling old protection work including cutting of crates and stacking of stones 44 Carraige of materials by Mechanical transport 45 Earth upto 1 km 46 2 km 47 3 Km 48 4 km 49 5 km 50 Beyond 5 Km upto 10 km /km 51 Beyond 10 Km upto 20 km /km 52 Beyond 20 km /everyadditional Km 53 Crates upto 1 km 54 2 km 55 3 Km 56 4 km 57 5 km 58 Beyond 5 Km upto 10 km /km 59 Beyond 10 Km upto 20 km /km 60 Beyond 20 km /everyadditional Km 61 Stone upto 1 km 62 2 km 63 3 Km 64 4 km 65 5 km 66 Beyond 5 Km upto 10 km /km 67 Beyond 10 Km upto 20 km /km 68 Beyond 20 km /everyadditional Km 69 EC Bags upto 1 kms 70 2 km 71 3 Km 72 4 km 73 5 km 74 Beyond 5 Km upto 10 km /km 75 Beyond 10 Km upto 20 km /km 76 Beyond 20 km /everyadditional Km 77 Sand upto 1 kms 78 2 km 79 3 Km 80 4 km 81 5 km 82 Beyond 5 Km upto 10 km /km 83 Beyond 10 Km upto 20 km /km 84 Beyond 20 km /everyadditional Km 85 Carraige of materials by Manual Means 86 Earth for first 50 mtrs. 87 for every additional 50 mtrs 88 Crates for first 50 mtrs. 89 for every additional 50 mtrs 90 Stones/ Boulders for first 50 mtrs. 91 for every additional 50 mtrs 92 Bags for first 50 mtrs. 93 for every additional 50 mtrs 94 Sand for first 50 mtrs. 95 for every additional 50 mtrs 96 Engagement of boat along with boatman during floods. 97 Hiring of dewatering pump incl fuel/operator charges 98 Engagement of vechile/Taxi for carrying staff to different sites during raids, Encroachment drives and flood like situations. 99 Supply of wire Crates 4x4 and 4 mm dia wire incl all carriages upto site of work 100 Repairs of water supply system Electric system in Divisional and Sub Divisional offices(Complete job) 101 Making of Flux Banners for awareness camps etc 102 Providing of POL for Cutters Generators and other Machinery as per the requirement 103 Supply of Petrol 104 Supply of Diesel 105 Supply of M Oil 106 Steel Reinforcement for RCC work incl. strightening cutting, bending placing in position and binding all complete upto plinth level(Mild steel bars. 107 Structural steel work in single section, fixed with or without connecting plate incl. cutting hoisting fixing in position and applying a priming coat of approved steel primer all complete. 108 Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. 109 Riveted and bolted 110 Welded 111 Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like 112 Centering and shuttering including strutting, propping etc. and removal of form for: 113 Foundations, footings, bases of columns etc. for mass concrete. 114 Walls (any thickness) including attached pilasters, buttresses, plinth 115 Suspended floors, roofs, landings, balconies and access platform 116 Welding, including transportation of plant at site etc. complete job 117 By Gas Plant 118 By Electric Plant 119 Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with1:3:6(1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 120 Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) 121 Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) 122 Repairs to brush cutters, wood cutters and other tools and machinery. 123 Engagement of Hydrulic Excavator for Removal of fallen trees and other obstructions in rivers and Nallahs and other emergencies(To be carried out as per the directions of Engineer Incharge)
Basic Detail
Tender No eNIT No. 12 of 2024-25 IFCD Bla
Bidding Type Tender
Location
City baramulla
State Jammu And Kashmir
Key Dates
Publish Date 05 Mar 2025
Submission Date 17 Mar 2025
Open Date 18 Mar 2025
Finance
Tender Value 12 Lakhs
Tender Fee 600
EMD 24000
Exemption Not Available
Document List
7091d438-27ef-4783-abd9-ee220109146c.html
BOQ_845020.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Mar 05, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Mar 17, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Mar 18, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

7091d438-27ef-4783-abd9-ee220109146c.html

xls

BOQ_845020.xls

pdf

Tendernotice_1.pdf