|
| 1 | Removal of Centrifugal pumpsetandits accessories for attending repairs etc., Completed. |
| 2 | Upto 3 HP |
| 3 | Above 3 HP to 7.50 HP |
| 4 | Removal of Submersible pumpsetsandits accessories from borewell / openwell for attending repair etc., Completed. |
| 5 | Upto 10HP |
| 6 | Re erection ofCentrifugal pumpsetandits accessories after attending the repair etc., Completed. |
| 7 | Upto 3 HP |
| 8 | Above 3 HP to 7.50 HP |
| 9 | Re erection ofSubmersible pumpsetsandits accessories into the borewell / openwell after attending the repair etc., Completed. |
| 10 | Upto 10 HP |
| 11 | Rewinding charges for the following wet type submersible motors using suitable gauge PVC insulated electrolyte copper wire of suitable no. of turns including deductthe cost of scrap ofold removing winding coiletc complete |
| 12 | 1.5HP |
| 13 | 3HP |
| 14 | 5HP |
| 15 | 10HP |
| 16 | Supply and Replacing of following worn out parts in the wet type submersible motors with new oneand monoblock motor including cost of materials and labour. including deduct the old material cost etc., completed. |
| 17 | motor thrust bearing for 5HP |
| 18 | motor housing bush for 5HP |
| 19 | Rotary surfacing |
| 20 | Pump housing |
| 21 | Pump Impellar |
| 22 | pump SS Bush |
| 23 | pump GM Bush |
| 24 | 6305 bearing |
| 25 | motor thrust bearing for 1.5HP |
| 26 | Rotary surfacing for 1.5HP |
| 27 | Pump Deffucer |
| 28 | Brasshousing bush for 10HP motor |
| 29 | Thrust bearing set for 10HP motor |
| 30 | Impellar (SS) for 10HP pump |
| 31 | Bush(SS sleeve) for 10HP pump |
| 32 | Casing for 10HP pump |
| 33 | Supply and Fixing and jointing of following PVC Insulated and sheathed 3 core flat type copper cable conforming to IS 694/1990 etc Completed. |
| 34 | 2.50 Sq mm |
| 35 | 4.00 Sq mm |
| 36 | Supply and fixing of 63A porcelain fuse Unit (500V) |
| 37 | Supply and fixing of 100A porcelain fuse Unit (500V) |
| 38 | Supply and Replacing of following wornout Elecrtical meterialswith new one including cost of materials and labour charges etc., completed. |
| 39 | Contact set for 1.5HP |
| 40 | capacitor |
| 41 | Contact set for 5HP |
| 42 | Contact set for 3HP |
| 43 | Relay unit |
| 44 | single pole 6A to 32A,10KAMCB(240v/415v) |
| 45 | Double pole 6A to 32A,10KAMCB(240v/415v) |
| 46 | 32 Amps DP Switch with metal clad(front handle) |
| 47 | 32 Amps TPN metal clad swithchwith rewirable fuse units. |
| 48 | Panel board servicing |
| 49 | Bore well dummy plate |
| 50 | Bore well MS Clamp set |
| 51 | 11/4\" dia hose Adopter set |
| 52 | 11/2\" dia hose Adopter set |
| 53 | Nylon rope |
| 54 | Auto start Preventer unit (for 3 phase) |
| 55 | Timer switch |
| 56 | 5 way connector (for single phase) |
| 57 | 3 way connector (for 3phase) |
| 58 | Supply and deliveryof following GI Specials with ISI markincluding cost and conveyance of all materials etc., complete. |
| 59 | 32mm dia G.I Union |
| 60 | 21/2\"\" C.I Flange |
| 61 | 21/2\"\" HDPE M.S.Collar |
| 62 | 21/2\"\" HDPE M.S.Connector |
| 63 | 7\" dia PVC coupler(6kg) |
| 64 | Removal of felldown Submersible motor from the deep borewell using special recovery vehicle including conveyance charges of vehicle and all labour charges etc., complete. |
| 65 | Labour charges for the erection of submersible pumpset in borewell/openwell including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days. |
| 66 | Supply and Fixing of DOL Starter with single phasing preventor with analog ammeter and voltmeter conforming to IS 13947 with auto restart facility including cost and conveyance of Materials at site and fixing labour charges etc., Completed. |
| 67 | Upto 5 HP |
| 68 | Flushing of borewell of 41/2\" to 6\" dia using drill rods/hose with required size of pipes for various capacity compressor including trasportation,labour,and fuel charges for compressors as directed by the departmental officer etc., complete. |
| 69 | Supply and run of 2 of 1.5 Sq.mm (22/0.3) PVC insulated SC unsheathed Cu conductorof 1100 V gradeon 7/20 GI bearer wire for service connection mains.(SD 64) |
| 70 | Supply and run of 2 of 4 Sq.mm (56/0.3) PVC insulated SC unsheathed Cu conductorof 1100 Von 7/20 GI bearer wire for service connection mains.(SD 65) |
| 71 | Supply and run of 4 of 4 Sq.mm (56/03.) PVC insulated SC unsheathed Cu conductorof 1100 V grade on 7/20 GI bearer wire for service connection mains. |
| 72 | Supply and run of 2 x 4 Sq.mm (56/0.3) PVC insulated SC unsheathed cu conductor of 1100 V grade in 25 mm dia GI pipe (class B) suitably bent at both ends with necessary angle iron upright and end supports for mains (service pipe) |
| 73 | Wiring with 2x1.5 sqmm(22/0.3) PVC insulated SC unsheathed Cu.Conductor of 1100V grade in suitable PVC rigid pipe on wall and ceiling with PVCaccessories andthickTW switch box and 5A F.T.switch with painting of suitable colour for open PVC light point./Fan point (SD18) |
| 74 | Supply and fixing of single phase Submersible pumpset as per IS 8034/2002 without panal board (Duty lpm x m) 20x60 TWAD pg:100 |