| 1 | Dismantling one Channel cross arm from existing DP structure, andbringing back to section store |
| 2 | Dismantling (without damage) one AB switch from existing structure andbringing back to section store |
| 3 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm,digging & back filling pit, drawing earth leads |
| 4 | Dismanling transformer station with transformer erected in plinthexcluding the rate of dismantling transformer |
| 5 | Additional rate for refitting/redoing one Disc set while renewing any type of cut pole |
| 6 | Fitting and erecting one HT DP using A type pole in position incl. fitting2 channel cross arms, digging & back filling pit, drawing earth leads |
| 7 | Fitting and providing one HT Stay for 11kV pole incl. digging & backfilling pit |
| 8 | Additional rate for excavation of one Pit for HT Pole/HT Stay in SoftRock |
| 9 | Loading HT A type pole from the stacking place and unloading the sameat work site (transport by vehicle |
| 10 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading and unloading |
| 11 | Dismantling (without damage) one 11kV PSC/RCC pole afterdisconnecting stays, strut etc. and stacking the same |
| 12 | Dismantling (without damage) one km 11kV line (3 conductors), crossarm, insulators, disc, rolling the conductor and stacking |
| 13 | Fitting and erecting one HT A type Pole in position incl. fitting cross arm,digging & back filling pit, drawing earth leads |
| 14 | Fitting and erecting one HT DP using PSC pole in position incl. fitting 2channel cross arms, digging & back filling pit, drawing earth leads |
| 15 | Fitting one set AB switch and giving connection |
| 16 | Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite |
| 17 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existingsingle pole incl. conveyance of materials |
| 18 | Dismantling (without damage) one LT PSC/RCC Strut pole incl. removalof clamps and stacking |
| 19 | Fitting one additional Fuse unit and giving connection from Transformerto fuse and DB to LT OH line |
| 20 | Dismantling (without damage) one km LT 3ph 4 wire OH line, crossarms, insulators and stacking the conductors in rolls |
| 21 | Dismantling and reconnecting 3ph service connection from the OH lineincl. lowering down the WP portion |
| 22 | Providing WP support with PSC pole incl. digging & back filling pit |
| 23 | Stringing one km LT 3ph 5 wire line (Rabbit for Ph and Weasel forN&St.main) incl. fitting cross arm etc. removing touchings andconveyance of materials |
| 24 | Additional rate for refitting/redoing one Shackle set and reshackling onespan while renewing any type of pole |
| 25 | Dismantling one ordinary street light/CFL/LED fitting from existing poleand refitting the same on newly erected pole and reconnecting |
| 26 | Dismantling (without damage) one km LT additional conductor line,cross arms, insulators and stacking the conductors in rolls |
| 27 | Dismantling and reconnecting Sph service connection from the OH line including lowering down the WP portion |
| 28 | Dismantling one Transformer upto 160kVA from structure and loading tovehicle incl. disconnecting HT/LT/Earth connection |
| 29 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of allmaterial (as per specification) |
| 30 | Erection of Anchor clamp / dead end clamp for 11kV ABC of any size |
| 31 | Erection of suspension clamp for 11KV ABC of any size |
| 32 | Dismantling one Anchor clamp /dead end clamp from 11 KV ABC |
| 33 | Dismantling one suspension clamp from 11 KV ABC |
| 34 | Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl.cutting and removing tree branches wherever necessary |
| 35 | Stringing of 11 kV Aerial bunched cable of size 3 x 150 + 1 x 120 sqmmwith bare/insulated Messenger through existing poles |
| 36 | Dismantling of 11 kV Aerial bunched cable XLPE insulated of size 3 x150+ 1 x 120 sqmm with bare insulated Messenger |
| 37 | Erecting one LT PSC Pole in position incl. digging & back filling pit. |
| 38 | Fitting 6 channel cross arms, AB switch, DO fuse, LA, HT & LTconnections on existing DP, 3 LT fuses |
| 39 | Fitting one Additional 3m Channel cross arm (35x35x5mm), in existing11kV DP incl. conveyance of materials |
| 40 | Erecting one 100kVA Transformer to existing DP and giving connections,incl. loading & unloading, excluding transportation |
| 41 | Providing one Earth using earth pipe incl. digging separate pit at standarddistance away from the pole/structure & backfilling |
| 42 | Providing Strut using LT PSC pole incl. digging & back filling pit |
| 43 | Fitting Knee bracing or suitable support on existing HT or LT post |
| 44 | Renewal of existing damaged/broken old 11kV Stay to the existing stayrod |
| 45 | Reshackling one span LT Sph 2 wire OH line, replacing insulators,tightening stay, cutting tree branches incl. conveyance |
| 46 | Reshackling one span LT OH Addl conductor, replacing insulators,tightening stay, cutting tree branches incl. conveyance |
| 47 | Reshackling one span LT 3ph 4 wire OH line, replacing insulators,tightening stay, cutting tree branches incl. conveyance |
| 48 | Re-joining snapped one LT conductor after removing damaged portionincl. Reshackling and conveyance of all materials complete. |
| 49 | Fitting and connecting 11 KV FPI |
| 50 | Dismantling (Without damage) Street light Box |
| 51 | Fitting Street Light Box |
| 52 | Dismantling (without damage) one LT PSC/RCC pole after disconnectingstays, strut etc. and stacking the same |
| 53 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite |
| 54 | Additional rate for excavation of one Earth Pit (2.5m depth) in Soft Rock |
| 55 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite |
| 56 | Redoing Sph WP S/C complete incl. changing WP, E/Meter, cut-out,neutral link etc, and conveyance of materia |
| 57 | Drilling hole of various sizes on existing Channel/Cross Arm |
| 58 | Drilling oval shaped hole of various sizes on existing Channel/CrossArm/GI/MS cleat etc |
| 59 | Fiting One no MVT on existing cross arm excluding termination work(for One phase) of any rating for 11 kV AB Cable |
| 60 | Dismantling One no MVT on existing cross arm of any rating for 11 kVAB Cable (Half rate of fitting) |