| 1 | Loading, carriage of following items from Store Centre, Gauriganj/Sultanpur to dump store including unloading and proper stacking (distance 0-70 km.) (Sl. No. 2 - 18) |
| 2 | STP/PCC pole. |
| 3 | ACSR Weasel Conductor |
| 4 | V type X Arm |
| 5 | 11 KV XLPE cable |
| 6 | 25/63/100 KVA Transformer |
| 7 | 250 KVA Transformer |
| 8 | Pilfer proof metering cubical |
| 9 | 11 KV cable box indoor/outdoor |
| 10 | 11 KV pin/disk insulator with nuts & bolts |
| 11 | Top Channel. |
| 12 | G.I. wire |
| 13 | Stay Set complete |
| 14 | Earthing complete |
| 15 | Dropper Angle |
| 16 | T-off channel |
| 17 | S/S base angle |
| 18 | L.T. ABC Three phase/Single Phase |
| 19 | Other Line Materials |
| 20 | Dragging of STP/PCC Pole from dump store to pit site. |
| 21 | Digging of pits up to the depth of 1650/2200 mm. as per site requirement. Fabrication & erection of single pole support on PCC/STP pole support including digging of pit & fixing of all accessories and clamps as per RESPO norms. |
| 22 | Digging of pits up to the depth of 1650/2200 mm. as per site requirement.Fabrication & erection of double pole support on P.C.C./STP pole includingdigging of pit & fixing of all accessories and clamps as per RESPO norms. |
| 23 | Grouting of STP/PCC pole in ratio 1:4:8 with cement stone ballast, coarse sand and plinthing 300 mm above ground level as well as muffing of plinth. |
| 24 | Spreading, laying & stringing of ACSR weasel conductor for construction of 11 KV line as per RESPO norms. |
| 25 | Spreading, Laying & Stringinging of AB cable Three phase/Single Phase |
| 26 | Ordinary earthing by 11 KV MS earth rod 2500 mm long as per RESPO norm. |
| 27 | Concreting & nuzzling of stay complete including fixing of necessary clamps with the help of nuts & bolts other accessorise required for completing the work as well as its grouting by civil material viz.Sand, stone ballast and cement. The contractor will provide all civil material as well as stay insulator |
| 28 | Guarding of line as per RSPO norms. |
| 29 | Installation of 25/63/100 KVA Transformer on newly constructed Double/single pole making proper connections from 11 KV system and proper testing as well as commissioning of Transformer. |
| 30 | Underground manual digiging and laying of 11 KV/33KV XLPE cableas per RESPO norms. |
| 31 | High pressure testing of 11 KV XLPE cable testing equipment will be arrenge by the contractor. |
| 32 | Installation and commissioing of pilfer proof metering cubical in metering room. |
| 33 | Installation of 11 KV indoor/outdoor cable Box as per RESPO norms. |
| 34 | Construction of plinth for 250 KVA transformer of 2x2x1.2 mtr. with help of first class brick and masonry 1:4 cement & coarse sand. Filling the structure completely as per norm with RCC to 1:2:2 cement & stone grit with M.S. bar & M.S. for restling the transformer. |
| 35 | Installation of 250 KVA Transformer on newly constructed plinth making proper connections from 11 KV system and proper testing as well as commissioning of Transformer. |
| 36 | Construction of 250 KVA Transformer fencing. |
| 37 | Earthing of 11/0.4 KV T/F with sutable G.I. pipe and fixing sutable G.I. Strip including all material requaired to complete the work. |
| 38 | Tree cutting for clearance of 11 KV/LT line. |
| 39 | Painting of ST pole |
| 40 | Providing and fixing of Holding Clamp for PCC/ST Pole (Cross Arm) |
| 41 | Providing and fixing of Holding Clamp for top channel (STP/PCC) |
| 42 | Providing and fixing of F Braket |
| 43 | Providing and fixing LT shakle Insulator on PCC/ST Pole |
| 44 | Providing and fixing Stay Insulator on PCC/ST Pole |
| 45 | Dismentaling of 11 KV/33 KV/LT Line |
| 46 | Note: Any quantity of item from sl no. 1 to sl no. 45 may vary to any limit within the financial value of agreement against this tender. |