}

Tender For Electric Work Works Related To Construction Of 11/0.4 Kv Sub-Station, Capacity Increase, And Related Line Construction Etc. - Safe Carriage Of Store Material From Store Center To Pit Site With Loading & Unloading At Both Ends Respectively Witho, bulandshahr-Uttar Pradesh

Paschimanchal Vidyut Vitran Nigam Limited has published Tender For Electric Work Works Related To Construction Of 11/0.4 Kv Sub-Station, Capacity Increase, And Related Line Construction Etc. - Safe Carriage Of Store Material From Store Center To Pit Site With Loading & Unloading At Both Ends Respectively Witho. Submission Date for this Tender is 10-03-2025. Substation Tenders in bulandshahr Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

48067547
Tender For Electric Work Works Related To Construction Of 11/0.4 Kv Sub-Station, Capacity Increase, And Related Line Construction Etc. - Safe Carriage Of Store Material From Store Center To Pit Site With Loading & Unloading At Both Ends Respectively Witho
Open Tender
NCB
Uttar Pradesh
Bulandshahr
10-03-2025

Tender Details

Tender For Electric Work Works Related To Construction Of 11/0.4 Kv Sub-Station, Capacity Increase, And Related Line Construction Etc. - Safe carriage of store material from store center to Pit site with loading & unloading at both ends respectively without contractor porvading all item distance within- 0 to 50 Km 3 ST Poles 11 mtr. long 4 PCC Poles 11 mtr. long 5 PCC Poles 8.5 mtr. long 6 Safe carriage of store material from store center to JE Store/Sub Station with loading & unloading at both ends respectively without contractor porvading all item distance within- 0 to 50 Km 7 T/F 63 KVA 11/0.4 KV 8 T/F 100 KVA 11/0.4 KV 9 T/F 250 KVA 11/0.4 KV 10 T/F 400 KVA 11/0.4 KV 11 ACSR Dog Conductor 12 ACSR Weasel Conductor 13 LT ABC 3*50 sq mm 14 LT ABC 3*95 sq mm 15 LT ABC 3*120 sq mm 16 11 KVXLPE CABLE (3X70) sq.mm 17 11 KV V TYPE CROSS ARM 18 1*240 SQ MM SINGLE LEAD 19 1*400 SQ MM SINGLE LEAD 20 11 KV FUSE SET 21 11 KV Pin Insulater 22 Three Phase Distribution Box 23 Loading, Safe carriage & unloading of heavy stock materialchannel, Angle and other site requerment any mattrial ETC from store center to JE Store/Sub Station with proper stacking of material, distancewithin 30 Kms. 24 Safe carriage of store material from JE Store/Sub Station to Pit site as per site requirtement with loading & unloading at both ends respectively without contractor porvading all item distance within- 0 to 30 Km 25 T/F 63 KVA 11/0.4 KV 26 T/F 100 KVA 11/0.4 KV 27 T/F 250 KVA 11/0.4 KV 28 T/F 400 KVA 11/0.4 KV 29 ACSR Dog Conductor 30 ACSR Weasel Conductor 31 LT ABC 3*50 sq mm 32 LT ABC 3*95 sq mm 33 LT ABC 3*120 sq mm 34 11 KVXLPE CABLE (3X70) sq.mm 35 11 KV V TYPE CROSS ARM 36 1*240 SQ MM SINGLE LEAD 37 1*400 SQ MM SINGLE LEAD 38 11 KV FUSE SET 39 11 KV Pin Insulater 40 Three Phase Distribution Box 41 ST Poles 11 mtr. long 42 PCC Poles 11 mtr. long 43 PCC Poles 8.5 mtr. long 44 Loading, Safe carriage & unloading of heavy stock materialchannel, Angle and other site requerment any mattrial ETC fromJE Store/Sub Station to Pitsite as per site requirement with proper stacking of material, distancewithin 30 Kms. 45 Erection of Single pole all size as per RESPO Drawing, fitting with all accessories Pin Insulator, F Bracket and etc as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. 46 ST Poles9/11/13 mtr. long 47 PCC Poles 8.5 mtr. long 48 PCC Poles11 mtr. long 49 Excavation of For Each and grouting of Single Pole as per RESPO Drawing and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc.The support shall be grouted with cement, sand and stone ballast in ratio 1:4:8 including the cost of Cement, Sand, Stone Ballast, Stone Pad etc. as per actual site requirement 50 ST Poles9/11/13 mtr. long 51 PCC Poles 8.5 mtr. long 52 PCC Poles11 mtr. long 53 Erection of Dobule Pole all size as per RESPO Drawing, fitting with all accessories Pin Insulator, F Bracket and etc as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. 54 ST Poles9/11/13 mtr. long 55 PCC Poles 8.5 mtr. long 56 PCC Poles11 mtr. long 57 Excavation of For Each and grouting of Dobule Pole as per RESPO Drawing and as per direction of Engineer Incharge including the cost of labour, T&P and carrier etc.The support shall be grouted with cement, sand and stone ballast in ratio 1:4:8 including the cost of Cement, Sand, Bricks/Stone Ballast, etc. as per actual site requirement 58 ST Poles9/11/13 mtr. long 59 PCC Poles 8.5 mtr. long 60 PCC Poles11 mtr. long 61 Laying sagging stringing and binding and jumpering etc of following Conductor/ABC/XLPE of size on the newly erected poles as per RESPO manual and as per direction of Supervising Engineer. It includes the cost of labour, T&P, carrier etc. required for proper completion of work. 62 11 KVXLPE CABLE (3X70) sq.mm 63 ACSR Weasel Conductor 64 LT ABC 3*120 sq mm 65 LT ABC 3*95 sq mm 66 LT ABC 3*50 sq mm 67 Mounting of Distribution Transformers. 68 T/F 63 KVA 11/0.4 KV 69 T/F 100 KVA 11/0.4 KV 70 T/F 250 KVA 11/0.4 KV 71 T/F 400 KVA 11/0.4 KV 72 Installation and fixing of Distribution Transformers. 73 T/F 63 KVA 11/0.4 KV 74 T/F 100 KVA 11/0.4 KV 75 T/F 250 KVA 11/0.4 KV 76 T/F 400 KVA 11/0.4 KV 77 Providing and fixing of Telless Unit with Structure. 78 Providing, fabricating carrying & fixing of Henley type Tailless Fuse Unit hook type arrangement single circuit having 3 Phase + Neutral arrangement ( 1 Nos single circuit tailless unit of heavy duty brass material stud type taillness unit having 300AMP capacityin box) in frame made of 70cmX50cmX6mm frame MS angle boxwith heavy duty Aluminium lugs suitable for 300 Amp load on at least 2 ft height from ground on plinth for safe installation or fixing of tailness unit box at MS angle frame support on Pole horizontially/vertically as per site requirement on available pole support at safeheight as per site conditions for electrical safety with making the connection at 100 kva T/f and Line side complete. All material except T/F LT PVC cable be provided by the contractor. 79 Providing, fabricating carrying & fixing of Henley type Tailless double circuit Fuse Unit hook type arrangement having 3 Phase + Neutral arrangement in each leg ( 2 Nos single circuit tailless unit of heavy duty brass material stud type taillness unit having 500AMP capacityin box) in frame made of 70cmX50cmX6mm frame MS angle box with connecting suitable length copper busbar 50mm wide and 6mm thick for connecting studs for main T/F cable with heavy duty Aluminium lugs suitable for 500 Amp load on at lest 2 ft height from ground on plinth for safe installation or fixing of tailness unit box at MS angle support frame on Pole horizontially/vertically as per site requirement on available pole support at safeheight as per site conditions for electrical safety with making the connection at 250 kva T/f and Line side complete. All material except suitable T/F LT PVC cable be provided by the contractor. 80 Providing, fabricating carrying & fixing of Henley type Tailless double circuit Fuse Unit having 3 Phase + Neutral arrangement in each leg ( 2 Nos single circuit tailless unit of heavy duty brass material stud type taillness unit having 600AMP capacityin box) in frame made of 70cmX50cmX6mm frame MS angle box with connecting suitable length copper busbar 50mm wide and 6mm thick for connecting studs for main T/F cable with heavy duty Aluminium lugs suitable for 600 Amp load on at lest 2 ft height from ground on plinth for safe installation or fixing of tailness unit box at MS angle support frame on Pole horizontially/vertically as per site requirement on available pole support at safeheight as per site conditions for electrical safety with making the connection at 400 kva T/f and Line side complete. All material except suitable T/F LT PVC cable be provided by the contractor. 81 Erection of stay set including the work of nozelling etc. as per RESPO manual and also including the cost of all grouting material, labour, T&P etc required for proper completion of work. 82 Grouting of stay set including the work of nozelling etc. as per RESPO manual and also including the cost of all The support shall be grouted with cement, sand and stone ballast in ratio 1:4:8 including the cost of Cement, Sand, Stone Ballast, Stone etc. as per actual site requirement , labour, T&P etc required for proper completion of work. 83 Providing and fixing of Barbed wire. 84 Fixing of earthing rod and Wire asper RESPO manual and as per direction of supervising engineer including the cost of labour, T&P etc. required for proper completion of work. 85 Cutting/drilling/Welding ofMS Channel Top Channal, site channel, site angle, Dropper Channal & Cross brassing angle and MS mattriel Including the work of fixing on STP Pole for construction of the line. 86 Making Jumpers on Section Points, byfixing of proper sizes, suitable for ACSR Conductor.Sectional Double/Four Pole. 87 Making of new Plinth With material sand brick etc.of size 6x6x6 sq ft for distribution Transformers. 88 Fixing of 33 KV Disc Insulater 89 Fixing of 11 KV V TYPE CROSS ARM 90 Fixing of 11 KV Pin Insulater 91 Providing of Three Phase Distribution Box if not available in Store Center. 92 Fixing of Three Phase Distribution Box 93 Fixing of 11 KV FUSE SET 94 Chopping of branches of trees of eucalyptus, Neem, Keekar and other kind of trees along the route of the line and disposal of the same at suitable place. 95 Providing andFixing of Chemical Earthing including all material 96 Providing and installing OF MS STRIP/angle (65x65x6) sq mm for fencingof size 6.5x6.5x9 ft. with proper grouting and completion of work. 97 Providing and installing OF MS STRIP/angle (65x65x6) sq mm for fencingof size 4.5x6.5x9 ft. with proper grouting and completion of work. 98 Providing and fixing of Water Level Earthing 99 Fixing of 11 KV Straight Through 3*70 SQ MM 100 HOLDING CLAMP 101 CLAMP FOR STP POLE 102 F CLAMP WITH NUT BOLT 103 DANGER BOARD AND CLAMP WITH NUT & BOLT 104 PERCING Clamp 105 LT CLAMP FOR PCC POLE 106 SUSPENSION CLAMP FOR LT ABC 107 DEAD END CLAMP FOR LT ABC 108 NUT & BOLT 109 J HOOK 110 Carrige of all dismantle material site/substationto store center BSR. 111 Providing and MAKING OF CHAIR TYPE PLINTH WITH RAIL POLE 112 Removing of old and damaged stp/pcc pole 113 cutting of damaged stp pole through gas cutter 114 removing damaged stp/pcc pole with help of hydra and carrying it to concerned substation 115 Providingof 02no troly for 400kva TF All essensial materialswith fencing

Key Value

Document Fees
INR 5900 /-
EMD
INR 116000.0 /-
Tender Value
INR 1.16 Crore /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail