|
| 1 | Repairing and overhauling of clinker grinderwith their drive mechanism. |
| 2 | Repairing and overhauling of gear box type H2 140 premium make 15.4:1 ofbottom ash hopper |
| 3 | Repairing and overhauling of gear box type H1 160 premium make 1.35:1 ofash slurry pump. |
| 4 | Repairing and overhauling of fluidomat make constantspeed fluid couplingtype T12/06 traction type. |
| 5 | Repairing and overhauling of fluidomat make SC9 Variable speedfluid coupling. |
| 6 | Repairing and overhauling of bottom ash hopper feed gate with roller assembly. |
| 7 | Repairing of bulged plate by straightening/ replacement of plate of bottom ash hopper |
| 8 | Running welding on crack/weak welding joints of bottom ash hopper |
| 9 | Fabrication and fixing of hooks inside the bottom ash hopper . |
| 10 | Providing and removing of scaffolding for carrying above works in bottom ash hopper. |
| 11 | Removal of old and damaged refractory of bottom ash hopper and shifting it to dump yardor as per direction ofEngineer in charge . |
| 12 | Casting of new castable /Pourable refractory in bottom ash hopper . |
| 13 | Repairing & complete overhauling of compressed air blowers of unit no. 6, 2x250 MW. |
| 14 | Painting with synthetic enamel of BAH of unit No.6 |
| 15 | Rotation of 200 NB CI ash slurry pipe line from bottom ash hopper to ash slurry sump including reassembling/ replacementof sleeve coupling and bends upto ash slurry sump. |
| 16 | Rotation of 250NB MS ash slurry pipe line from CT towerto ash slurry sump |
| 17 | Repairing/Reassembling/Replacement of 250NB MS Pipe and 200NB sleeve coupling , bends, Y-piece with fasteners. |
| 18 | Dismantling and shifting power cylinders of ash in take valves, branch isolation valves , vacuum conveying line valves, ash slurry pump suction and dischargevalvefrom site to workshop and installationfrom workshop to site. |
| 19 | Repairing and overhauling of powercylinders of ash intakevalves,branch isolationvalves, vacuum conveying line valves, ash slurry pump suction and discharge valves. |
| 20 | Servicing of outlet gates of ESP , rectification of defects , if any |
| 21 | Repairing/Reassembling/Replacement of 200NB sleeve coupling , bends with fasteners . |
| 22 | Rotation of 200NB CI/MS ash pipe line of ESP hopperof ash handling system of unit No.6 of 2x250 MW . |