Auction Sale Of Ubl-Ubls-2159-Girder-24-J, Condemned And Un-Serviceable Released Girder Cl-Iii Consisting Of Released Fish Belly Type Gantry Girder ? 2 Nos And Released Gantry Girder ? 2 Nos With Pathway From Open Gantry Carriage Repair Shop. Consists Of Fish Belly Type Girder, Non Fish Belly Type Girder, Side Pathway, Top & Bottom Flange, Web, End Plate, Intermediate Stiffener, Splice Plate, Splice Joint Plate At Bottom Flange, Girder Top Flange Joint Plate, Top Flange, Bottom Flange, Bottom Flange Supporting Angle, Web Plate, Intermediate Stiffner, Stiffner Angle, Splice Plate, Running Angle Top And Bottom, Crane Stopper Ismc, Crane Stopper Other Side, Bearing Plate, Verticle Angle, Diagonal Angle, Horizontal Top & Bottom Angle, Chequered Plate, Hand Rail, Vertical Angle, Horizontal Angle, Side Gusset Plate, Horizontal Angle, Horizontal Plate, Verticle Angle, Diagonal Supporting Angle, Angle Below Chequred Plate, Chequered Plate, Supporting Angle Type-1,2,3, Ds-8 No: 190820086 Custodian: Sse/Bridge/Ubl. Location: Available At Hubli Workshop, Near West Gate, Under Station Fob. Above Materials Will Be Sold By One Lot Basis. No Weighment Will Be Done At The Time Of Delivery. Delivery On Lot Basis Only. Note: (I) N.F.S. Items Gi Pipes, Cable And Other Non-Ferrous Items If Found Should Be Returned To Railway. (Ii) Other Materials Lying Nearby The Lot Are Not For Sale. (Iii) Cutting Permitted For This Lot. (Iv) Proper Care Has To Be Taken For Safety Of Nearby Bridge And No Line Operations Should Be Disturbed. For Any Damage To Railway Properties Or Operations, The Purchaser Will Be Sole Responsible. Purchaser Will Be Totally Responsible For The Safety Of Staff Engaged In Cutting And Handling Of Girders. Purchaser Will Take All The Necessary Steps To Prevent Any Mishap Or Accident At Site. Cutting, Dismantling, Handling And Loading Will Be Done By Purchaser Labours At Purchaser Expense. (V) Bidders Are Advised To Inspect The Girder Before Bidding So That To Have Fair Idea About The Materials And Quantity. (Vi) The Purchasers Should Survey The Material For Road Approach, Location And Qty Before Bidding The Lot. After Bidding No Correspondence Will Be Entertained