| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In hard rock (Blasting prohibited) toe wall |
| 2 | Earth filling with available surplus soil excavated from oundations and taken only from outside of building plinth in layers not exceeding 20cm in depth, consolidating each deposited layer including ramming and watering and consolidation with lead up to 50 m and lift upto 1.5 m. |
| 3 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).toe wall Stone Pitching |
| 4 | Centring and shuttering with plywood or steel sheet upto two stories or height upto 7.5 metre above plinth level including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. TOE WALL PCC TOE WALL FOOTINGTOE WALL |
| 5 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto two stories excluding cost of centring, shuttering, finishing and reinforcement : 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) TOE WALL FOOTINGTOE WALL |
| 7 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars. As per RCC |
| 8 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications and as per clause 2504 of MoRT&H Specification. With R.R. Stone/ bolder, weighing not less than 40 kg, thickness not less than 150mm, Specific gravity not less than 2.65. |
| 9 | Providing and laying graded stone aggregate Filter material underneath pitching in slopes complete as per drawing and Technical specifications and as per clause 2504 of MoRT&H Specification. |
| 10 | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinthleveluptotwo storiesinallshapesand sizes in: Cement mortar 1:6 (1cement : 6 coarse sand) |
| 11 | 40 mm thick fine dressed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement:5coarsesand) includingpointingwith cement mortar 1:2 (1 cement:2stonedust) withanadmixtureof pigment to match the shade of stone. White sand stone (for steps) |