| 1 | Route surveying andpeg marking of HT/LTlines |
| 2 | Loading and un loading of of 9.14 Mtr poles / 9 Mtr PSC |
| 3 | Loading and un loading of of 8.0m pole psc |
| 4 | Transport of conductor from road side to workspot upto 1KM stringing and sagging up to 7/2.59 mm ACSR including PVC Cable up to 25Sqmm of conductor including binding of pin and proper tightening |
| 5 | Transport of conductor from road side to workspot upto 1KM stringing and sagging up to 7/3.35 mm ACSR including PVC Cable up to 25Sqmm of conductor including binding of pin and proper tightening |
| 6 | Transport of 9.0 Mtr PSC, 9.14 Mtr & and abovepoles including R.S Joist and Rail polesup to 8 KM |
| 7 | Transport of 8.0 Mtr PSC, and abovepoles including R.S Joist and Rail polesup to 8 KM |
| 8 | Excavation of pits in ordinary soil 9.14 Mtr Poles /9.0 Mtr PSC Poles/ All Metal poles(1.25x06x1.83M) |
| 9 | Excavation of pits in ordinary soil8.0mtr PSC Poles/ All Metal poles(1.25x06x1.83M) |
| 10 | Excavation of pits in ordinary soil forStay pit |
| 11 | Erection works( including refilling of excavation sand) 9.14 Mtr Poles |
| 12 | Erection works( including refilling of excavation sand) 8.0 Mtr Poles |
| 13 | Erection of stay set complete ( including refilling of excavation of sand) |
| 14 | Fixingof LT Sph \"X\" Arm/HT TI Fitting/ LT TI Fitting |
| 15 | Fixing of LT 3ph\"X\" Arm |
| 16 | Fixing of 4\" - 6\" \"V\"\"X\" Arm |
| 17 | Fixing of tapping channel / Guarding \"X\" Arm |
| 18 | Fixing of 22 KV/33KV Pin Insulator/ PT insulator |
| 19 | Fixing of 22 KV Disc |
| 20 | Fixing of LT Shackle |
| 21 | Fixing of Aluminium Knob |
| 22 | Earthing of Poleincluding buring ,looping and binding |
| 23 | Mass concerting for pole 0.6Mx0.45Mx1.25M ( Cement ,Jelly,sand supplied by contractor) |
| 24 | Converting of Pin point to cut point Location |
| 25 | Resagging of Cut Point Location |
| 26 | Dismantling of 7.5m/8.0m Poles |
| 27 | Dismantling of conductors upto 7/2.59 MM and Coiling and Transporting from workspot to road side |
| 28 | Relaasing of LT 3 ph \"X\" Arm |
| 29 | TransportingofLine Materials from Stores toworkspot |
| 30 | Loading and Un loading of Line Materials from Stores to worksite |
| 31 | loading /un Loading of D,Ts at field and stores without Crane |
| 32 | Erection of Distribution Transformer |
| 33 | Providing Jumbering of Structure |
| 34 | Erection of LT Open tyoe fuse unit arrangement Single/Double (Including Jumbering) |
| 35 | Erection of Single pole Transformer Bed |
| 36 | Erection of Single pole A.B. Switch (G.OS) |
| 37 | Erection of Single pole H.G.Fuse set |
| 38 | Painting of all clamp , other materials and painting of Strucure pole( Excluding Paint) |
| 39 | LT cable arrangement |
| 40 | Fabrication of centre support and erection of centre support including pits |
| 41 | Mass concreting for centre support for 2 feet including all materials |
| 42 | Erection of Earth pipes and Structure earthing(complete) |
| 43 | Mass concreating PCC including cost of Jally,MSAND& cement,Lead ,Lift etc. with a mixture of 1:3:6 for 9m Square pole with copping for single pole |
| 44 | Providing Holes of all size Flat/Angles/Channels |
| 45 | Gas Cutting |
| 46 | Manufacturing of clamps & Altering of clamps |
| 47 | Transporting of Distribution Transformer by using private vehicle ( all capacities up to 30KM) |
| 48 | GST |