Tender For Ngn Letekujan Terminal Up To Nrl Iggl Rt Pipeline Project
Tender Overview
Project Description
Tender For NGN LETEKUJAN TERMINAL UP TO NRL IGGL RT PIPELINE PROJECT-- 1 Group A 2 Optical Fiber Cable for installation along main pipeline 24 – core, Single mode, multi-tube, un-armoured, ITU – T G.652-D compliant. Suitable for blowing inside 40 mm OD HDPE duct. OFC Drum size 4 km minimum 3 Supply of FTC with pig tails other accessories as per specifications given in the tender document for termination of OFC - 24 Fibre in the control room 4 Joint Enclosure for OFC: Suitable for jointing of 24-core un-armoured OFC (ITU-T G.652-D) and cable management of OFC, with 4 nos. of ports for entry / exit of cable, Min. 4 nos. of fiber organizer trays of 24-fibers each, weather protection to IP 68 and complete with all necessary accessories 5 Group B 6 HDPE Duct – for installation of 24-Core Fiber Optical Cable along Main Pipeline. Permanent lubricated HDPE Duct, 40 mm OD (33 mm ID), Colour: Orange. HDPE duct Drum size 1 km minimum 7 Supply of Duct coupler for HDPE duct 40mm OD 8 Cable Sealing Plug for HDPE duct 40mm OD 9 End caps for HDPE duct 40mm OD 10 Group C 11 Supply of Electronic Marker Locator 12 Supply of Electronic Markers in the Jointing / Blowing Pits 13 Warning tape: The detectable warning tape shall be stainless steel, orange in colour with minimum width of 150 mm printed with the words “Fiber Optic Cable” All Fibre Optic cables, both duct routes and direct buried cables shall have a detectable Warning Tape installed as part of the back fill process to provide early warning of the presence of a cable to anyone carrying out excavation works. The tape shall be located at a minimum of 300 mm above the upper surface of the conduit system
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 17-Mar-2025 | Corrigendum 1 | Date | 21-Mar-2025 |
| 2 | 21-Mar-2025 | Corrigendum 2 | Date | 02-Apr-2025 |
| 3 | 02-Apr-2025 | Corrigendum 3 | Date | 12-Apr-2025 |
| 4 | 11-Apr-2025 | Corrigendum 4 | Date | 21-Apr-2025 |
| 5 | 21-Apr-2025 | Corrigendum 5 | Date | 01-May-2025 |
| 6 | 30-Apr-2025 | Corrigendum 6 | Date | 06-May-2025 |
| 7 | 06-May-2025 | Corrigendum 7 | Date | 14-May-2025 |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-6 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-7 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender