|
| 1 | Laying or re-routing or patrolling or dismantling, rolling & stacking of H.T./L.T. Power Cable of 6.6KV/ 0.4KV, PILC/XLPE cable of size1C to 3C or 3½Cx70mm² and above |
| 2 | Laying or re-routing or patrolling or dismantling, rolling & stacking of L.T. Power/control Cable of size 1C to 3C or 3½Cx6 mm² to 50 mm²- Cu/Al |
| 3 | Laying or re-routing or patrolling or dismantling, rolling & stacking of L.T. Power/control Cable of size 2C to 37Cx1.5 mm² to 4.0 mm²-Cu/Al |
| 4 | Digging of existing cables trench ofsize 0.9x1.0 Mtr. to locate the cable fault of repair/ jointing and refilling it by use of old sand, bricks and soil. |
| 5 | To make H.T. Power cable end termination joints of 6.6KV/11KV cables of size 3Cx35 mm² to 3Cx300 mm² and 1Cx400 mm² to 1000 mm² PILC/XLPE Cables |
| 6 | To make partial repair of H.T. Power cable end termination joints of 6.6KV/11KV cables of size 3Cx35 mm² to 3Cx300 mm² and 1Cx400 mm² to 1000 mm² PILC/XLPE Cables |
| 7 | To make H.T. Straight through joints of 6.6KV/ 11KV Power Cables of size 3Cx35 mm² to 3Cx300 mm² and 1Cx400 mm² to 1000 mm² PILC/XLPE Cables |
| 8 | Changing of oil resin compound, changing of gas-kit, checking of all gland tightness and all related work to UST cable box |
| 9 | Cutting, marking and making straight through or end joint of following LT Power/Control cables:2C to 7Cx1.5mm² to 4.0mm²-Cu and 1C to 3½Cx6 mm² to 10 mm²-Al |
| 10 | Cutting, marking and making straight through or end joint of following LT Power/Control cables:8C to37Cx1.5mm² to 4.0 mm² and 1C to 3½Cx16 mm² to 50 mm²-Cu/Al |
| 11 | Cutting, marking and making straight through or end joint of following LT Power/Control cables:2C to3½Cx70 mm² to 150 mm²-Al. |
| 12 | End termination jointing of following Size LT Power cables:2C or 3C or 3½Cx185 mm² to 400 mm²-Al and 1Cx1000 mm²-Al |
| 13 | Straight through joint of following Size LT Power cables:2C or 3C or 3½Cx185 mm² to 400 mm²-Al and 1Cx1000 mm²-Al |
| 14 | Making of hole for gland in Panel for Control cables 2C to 37Cx1.5 mm² to 4.0 mm² |
| 15 | Making of hole for gland in Panel for LT Power/Control cables: 1C to 3C or 3½Cx6 mm² to 50 mm² |
| 16 | Making of hole for gland in Panel for LT Power cables:1C to 3½CX70 mm² to1000 mm² |
| 17 | Fabrication/ strengthening of cable racks 400/600 mm /800 mm size of boiler / turbine and other auxiliaries of 200MW units Obra, BTPS turbine/ boiler side risers and cable trenches size 600 mm/800 mm Obra TPS. |
| 18 | Making of Cable Leads of different size (35mm² to 240 mm²) |
| 19 | Retrofitting of cables fire sealing |
| 20 | Fabrication of new cable connection box of H.T motors |