| 1 | Safe loading, carriage including unloading and proper stacking of following materials from Central Store Barabanki / JE Store to site of work. |
| 2 | PCC POLE 8.5 METER LONG |
| 3 | TOP CHANNEL |
| 4 | T-OFFCHANNEL |
| 5 | A.C.S.R. RABBIT CONDUCTOR |
| 6 | LT ABC (3X95+1X70+1X16) SQ. MM. |
| 7 | 11 KV POLYMERIC PIN INSULATOR |
| 8 | 11KV POLYMERIC DISC INSULATOR 45 KN |
| 9 | 11KV POLYMERIC DISC FITTING 45 KN |
| 10 | STAY ROD 16X1800 |
| 11 | STAY WIRE |
| 12 | MS EARTHING ROD (2540X20 MM) |
| 13 | GI WIRE (5 MM 6SWG) FOR EARTHING |
| 14 | 11 KV XLPE CABLE 3X185 MM2 |
| 15 | CABLE JOINTING KIT OUTDOOR 11 KV 185MM2 |
| 16 | CABLE JOINTING KIT INDOOR 11 KV 185MM2 |
| 17 | 11 KV X-ARM V TYPE |
| 18 | 11 KV GUARDING ANLGE |
| 19 | GI WIRE (4 MM 8SWG) FOR GUARDING ANLGE |
| 20 | 11 KV DROPPER ANGLE |
| 21 | TF 100 KVA |
| 22 | 11 KV VCB, O/G CTR 200/100/5A, 350 MVA |
| 23 | Dragging of pole from JE Dump Store to site |
| 24 | Grouting of PCC Pole |
| 25 | Erection of Stay set of 16x1800 mm rod duly painted with red oxide,anchor plate, thumble turn buckle andstay insulate etc. digging of pit of size of size 0.4x0.6x1.6 m for grouting 1:3:6 cement concrete, with stay of size 7/8 SWG, nuzzling & Grouting. |
| 26 | Installation of Mounting of Following capacityof Transformer including its connection between 11 KV and LT Line mountingprovinding Crimping type Aluminium lugs of required size.( All the material except transformer will be arranged by the contractor) |
| 27 | Mounting of 100 KVA Tranformer |
| 28 | Stringing and sagging of 11 KV line with ACSR Rabbit Conductor including nuzzling binding and jumpering (Rabbit conductor will be provided by the department) |
| 29 | Errectionof Substation type double pole with ST/PCCincluding mounting of Top Channal Dropper Channel, base angle with clamps with nut & bolt 33/11 KV line including grouting of support and plinthing 300 mm above ground level, fitting of 33/11 KV pin & Pin insulator. 1/6 of total lenght of poles will remain under the ground and planted on stone pad of Size 300x300x75 MM. |
| 30 | Errectionof singlePCC /ST Pole for Stringing and sagging of conductor 1/6 of total length of poles will remain under the ground and planted on stone pad of size 300x300x75 mm. |
| 31 | Stringing and sagging of(3X95+1X0+1X16) Sqmm ABC(Cable will be provided by the department) |
| 32 | Laying of 11 KV XLPE CABLE 3X185 Sq. MM (XLPE Cable will be provided by the department) |
| 33 | Earthing of pole with MS Earthing. |
| 34 | Installation of11 KV VCB, O/G CTR 200/100/5A, 350 MVA |
| 35 | Concreating and pilinthing of ST& PCCPole 18x24 CM. |
| 36 | Fabricate with hole suitable size in steel items, receive from central store lightas top channel/dropper channel sub station base angle etc. |
| 37 | Provinding & Fixing of various type materials. All materials shall be supplied by the contractor. |
| 38 | 11 KV F-CLAMP FOR PCC POLE |
| 39 | 11 KV X-ARM HOLDING CLAMP |
| 40 | STAY/LOOP INSULATOR |
| 41 | HOLDING CLAMP FOR TOP/T-OFF/DROPPER/GAURDIG ANGLE |
| 42 | 11 KV STAY CLAMP |
| 43 | LT POLE CLAMP FOR PCC |
| 44 | EYE HOOK CLAMP |
| 45 | DEAD END CLAMP |
| 46 | SUSPENSION CLAMP |
| 47 | NUT BOLT & WASHER |
| 48 | GI PIPE 6\" DIA |
| 49 | HOLDING CLAMP FOR SUPPORT OF GI PIPE |
| 50 | LOOPING & CHOPPING OF TREE BRANCHES |
| 51 | LT ARMOURED CABLE 4X2.5 MM2 |
| 52 | LT ARMOURED CABLE 2X2.5 MM2 |
| 53 | Wiremesh fencing of 11/0.4 KV substation shall be made rectangular off size as per site requirement not exceeding 3 meter fabrication 45x45x5mm angle. material shall be supplied by the contractor. |
| 54 | Construction of massionary type transformer plinth of Suitable sizewith brick ,cement, coarse sand , sand & brick ballast. Filling of sand in the hollow space , plastering , outer surface in ration 1:4:6 top of the plinth 4\" thickness grouting of 2 nos MS Channel of size 100x50x2000 mm on the top of the plinth for placement of transformer . All material shall be supplied by the contractor. |
| 55 | Earthing of T/F Pipe type with 40 fit deep borring and providing GI Pipe 1.5\" dia (60 fit GI Pipe) and GI strip 25x5 mmx6 meter long attached with clamps, L piece, nut & bolts and GI Pipe Cap. All material shall be supplied by the contractor. |
| 56 | PIPE TYPE EARTHING OF 11 KV VCB |