Annual Plan-Lpgp 2024-25 Pazhya Lakkidi Palli Thekumcherode Road Maintenance - Ward 04 (Mgr-Rs 14,00,000/-)-Pro.No 443/24-25-General Civil Work
Tender Overview
Project Description
Annual Plan-LPGP 2024-25 Pazhya Lakkidi Palli Thekumcherode Road Maintenance - Ward 04 (MGR-Rs 14,00,000/-)-Pro.No 443/24-25-General Civil Work
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 03-Mar-2025 | COR 1- 443/24-25/AE/LSGD/Pazhya Lakkidi Palli | Date | 04-Mar-2025 |
BOQ
| Sl. No. | Item Description |
| 1 | Road Maintenance |
| 2 | OD46979/2024-2025:Filling pot holes ( cut and formed to regular shape and all loose and defective materials removed)after supplying a prime coat of hot bitumen using 36mm broken stone and compacting with power roller to get a compact surface |
| 3 | 3.2:Preparation of Foundation for EmbankmentScarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical MeansScarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4. |
| 4 | 4.9:Wet Mix MacadamProviding, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.By Mechanical Means with 1 km lead |
| 5 | 75.5.1.1pb:Prime Coat - Low porosity - With Packed Bitumen RatesProviding and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 |
| 6 | 75.5.2.3pb:Tack Coat - With Packed Bitumen RatesProviding and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 7 | 75.5.2.2pb:Tack Coat - With Packed Bitumen RatesProviding and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. |
| 8 | OD394649/2024-2025:Mix sealsurfacing manual means Type -A Bitumen S 65 using shredded plastic providing ,laying and rolling of close graded pre mix surfacing materials of 20mm thickness composed of 11.2mm to 0.9mm(Type-A) or 13.2mm to 0.9mm ( Type-B ) aggregates coated withshredded plastic ( 3% by weight of bitumen ) as per Standard procedure using penetration grade bitumen to required line ,grade and level to serve as a wearing course on a previously prepared base ,including mixing in suitable plant ,laying and rolling with a three wheel 8-10KN static roller and finishing to required level and grades as per Technical Specification Clause 509 By manual means Type A (ii) Bitumen ( S-65 )Unit = sqm Taking output = 500 sqm |
| 9 | 3.5.1:Excavation in Cutting in Soil by manual means with lead upto 50 mExcavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3 |
| 10 | 11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203I. P.C.C grade M 10(i) Nominal mix 1:3:6 |
| 11 | 12.5.3:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 mIII. R.C.C grade M 20 |
| 12 | 12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender