|
| 1 | Mkx csfyax djuk 5-0 lseh- ls 7-5 lseh- xgjkbZ rd |
| 2 | taxy dh lQkbZ] lk/kkj.k ouLifr rFkk >kfM;ksa dks dkaVus lfgr ¼thds,u 2017 vkbZVe ua- 191 fofo/k½ |
| 3 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. मशीनरी कार्य सख्तमिट्टी (in Hard Soil) |
| 4 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect. Hard soil mixed with kankar bouldar/murrum 70% |
| 5 | Add extrafor disposal of excavated material above initial lift of 1.5m |
| 6 | सीमेन्ट कांक्रिट नींव या फर्श में 40 मि.मी. नामीय माप की पत्थर गिट्टी(crusher broken)/ईट मिटटी , सीमेन्ट- रेत मसाला में 1 सिमेन्ट : 4 रेत : 8 गिट्टी अनुपात में डालना तथा कुटाई करना , तराई समेत । |
| 7 | एनीकट हेतु पत्थर की चिनाई सीमेंट-बजरी मसाले में।1:6 |
| 8 | सीमेंट कंक्रीट 1 सीमेंट : 2 बजरी तथा 4 गिट्टीपत्थर की 12 मिमी नामीय माप की नींव में डालना,कूटना तथा तराई आदि सहित एनीकट के लिए। |
| 9 | lhesUV IykLVj nhokj ij 1%4 vuqikr esa lhesUV ctjh feykdj tksMks dks dqjsnus rFkk 14 fnu rd fu;fer rjkbZ lesr ¼25 feeh½ |
| 10 | क्वेरी रविस जिसमें 40 प्रतिशत पत्थर के स्पाल हो या कंकर या घाड़ला को बिछाना तथा आपूर्ति करना, पानी छिड़कना तथा दुरमुट से कूटना। |
| 11 | कल्वर्ट/पुलिया निर्माण हेतु आरसीसी.(रेन्फोसमेंट सीमेंट कंक्रीट)NP3 ह्युम पाइप एक पंक्ति में आवश्यक ढलान देते हुए सीमेंट मसाला 1:2 में बिछाने/लगाने का कार्य मय कोलर सहित |(मिटटी खुदाई,कंक्रीट व चिनाई कार्य के अलावा) 750 mm व्यास पाइप |
| 12 | Construction of tubewell up to 100m depth and above to accomodate housing and assembly pipe in all types of alluvium strata by rotay drilling method with \"code of practice for construction and testing of tubewells (IS:2800 (Part-II) : 1991 and IS:2800 (Part-II) :1979 both amended up to date) with supply of bail plug if necessary.The work will not include cost of housing pipe and strainer pipe assembly cost, gravel and development work. Work would be deemed completed only after obtaining sound free water during pumping. |
| 13 | Supply of ERW M.S. black casing pipe ISI marked (c) of grade Fe410 of following sizes at site of work. 200 MM DIA.Nominal bore of pipe |
| 14 | Supply & lowering air line of 25mm dia, G.I. pipe \"B\" class having perforation 3 to 5mm size all arrow of G.I. pipe in Zig-Zag fashion & making air vent at top including the cost of Tee- Nipples, Elbow, Socket etc. PWD BSR 2022 ITEM 4.26 (10 % LESS CP) |
| 15 | नीव, खाई,परनाला में 1.5 गहराई तक मिट्टी की खुदाई करना , तल को कूटना , पानी डालना, बगल को संवारना , खुदी मिट्टी को बाहर निकालना, नीव भरने के बाद खाली स्थानों को पुन: मिट्टी से भरना तथा बची हुई मिटटी को 50 मीटर की दूरी तक निस्तारण करना SOFT SOIL |
| 16 | सीमेंट कंक्रीट 1 सीमेंट : 4 बजरी तथा 8 गिट्टी / 1 सीमेंट, 3 बजरी तथा6 गिट्टी पत्थ र की 20 मिमी नामीय माप की नींव में डालना,कूटना तथा तराई आदि सहित एनीकट के लिए। |
| 17 | नींव तथा कुर्सी प्रथम श्रेणी ईंट की चिनाई सीमेन्ट -बजरी 1:6 मसाले में, मय बगल की झिरी बन्द करने तथा तराई सहित। |
| 18 | सीमेंट प्लास्टर दीवार पर 1:6 अनुपात में सीमेंट-बजरी मिलाकर जोड़ों को कुरेदने तथा 14 दिन तक नियमित तराई समेत। |
| 19 | 40,e-,e- jksM+h e; vkiwfrZ ,oa ifjogu 10 fd eh rd |
| 20 | 20,e-,e- jksM+h e; vkiwfrZ ,oa ifjogu 10 fd eh rd |
| 21 | ctjh e; vkiwfrZ ,oa ifjogu 10 fd eh rd |
| 22 | S/F |
| 23 | Display board and Photograph |