Power Boards / Undertakings / PSU Closing in 0 days TDR #47909752

E Tender No Resagging Of Unbunch Ht Ab Cable And Replacement Of Damaged Ht Ab Cable To 11 Kv Aaac Conductor (Al-59) In 11 Kv Poorvi Feeder In Edsd Jaspur Ii And Supply Of Its Associated Decentralized Material Under Electricity Distribution Division Jaspur

Issued by Boards / Undertakings / PSU · jaspur, Uttarakhand
Tender Value
Ref. Documents
Estimated cost
Bid Submission
07 Mar 2025
0 days left
EMD
3.25 Lakhs
Bank guarantee accepted
Document Fee
11800
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
jaspur → Uttarakhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

E Tender No Resagging Of Unbunch Ht Ab Cable And Replacement Of Damaged Ht Ab Cable To 11 Kv Aaac Conductor (Al-59) In 11 Kv Poorvi Feeder In Edsd Jaspur Ii And Supply Of Its Associated Decentralized Material Under Electricity Distribution Division Jaspur.

BOQ

Name of Work: Resagging of unbunch HT AB Cable and replacement of damaged HT AB Cable to 11 KV AAAC Conductor (AL-59) in 11 KV Poorvi Feeder in EDSD Jaspur II under EDD Jaspur.
Sl. No. Item Description
1Supply Item
2Supply of Holding Clamp for SP-55 with N/B(As per Specification of RESPO & UPCL)
3Supply of Bracing Clamp for SP-55 with N/B(As per Specification of RESPO & UPCL)
4Supply of Nut & Bolts(As per Specification of RESPO & UPCL)
5Supply of HOLDING CLAMP FOR PCC POLE(As per Specification of RESPO & UPCL)
6Supply of E- CLAMP(As per Specification of RESPO & UPCL)
7Supply of PP & CLAMP WITH N&B ST POLE SP-55(As per Specification of RESPO & UPCL)
8Supply of Bracing Clamp With N&B for Pcc Pole(As per Specification of RESPO & UPCL)
9Supply of DANGER BOARD(As per Specification of RESPO & UPCL)
10Supply of PG Clamp Dog to Dog(As per Specification of RESPO & UPCL)
11Supply of Earth Wire Clamp Off Size(As per Specification of RESPO & UPCL)
12Supply of Stay Clamp With N&B(As per Specification of RESPO & UPCL)
13Supply of 11 KV CABLE TIES FOR PIN INSULATOR(As per GTP & Specification of UPCL)
14Supply of 11 KV IPC FOR COVERED TOCOVERED COND.(As per GTP & Specification of UPCL)
15Supply of 11 KV IPC FOR COVERED TO BARECONDUCTOR(As per GTP & Specification of UPCL)
16Supply of 11KV AAAC AL-59 , 99 SQ.MM COVERED COND(As per GTP & Specification of UPCL)
17Supply of 11 KV H/S JOINTING KIT 120 SQ MM (O/D)(As per GTP & Specification of UPCL)
18Supply of 120 SQ MM Straight through For HT AB Cable(As per GTP & Specification of UPCL)
19Supply of BARBED WIRE
20Supply of PVC Tape Roll
21Supply of HT Tape
22Supply of 11 KV TENSION CLAMP WITH BAIL & IPC(As per GTP & Specification of UPCL)
2311 KV AAAC Conductor Work
24Cartage of the following material by private truck from store centreto work site dump store approx. distance 0 to 20 Km. including loading into truck and unloading at work site. Dump store and carriage from dump store to pit site.
25PCC Pole
26STP SP-55 Pole
27Cartage of other material (other than poles) by vehicle fro Store Center to nearest construction site Store including loading and unloading at both ends.
28Head Load Cartage of following material road to work site approx. distance 0 to 1 Km. including loading and unloading.
29PCC Pole
30STP SP-55 Pole
31Headload cartage of Small material from road to site
32Excavation of earth for pole pit of size 0.9x0.6x1/6 of full length of pole for erection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work
33Erection ofSingle PCC polein proper level and alignment alongwith fixing of all accessories, like top channel & clampsas per RESSPO construction Manual.
34Erection ofSingle STP SP-55 polein proper level and alignment alongwith fixing of all accessories, like top channel & clampsas per RESSPO construction Manual.
35Erection ofDouble PCC pole in proper level and alignment alongwith fixing of all accessories, like top channel,X-bracing & clampsas per RESSPO construction Manual.
36Erection ofDouble STP SP-55 pole in proper level and alignment alongwith fixing of all accessories, like top channel,X-bracing & clampsas per RESSPO construction Manual.
37Grouting of pole in size 0.45x0.45x1/9 of the support in CC ratio 1:4:8 (1 cement :4 graded stone 20mm nominal size : 8 coarse sand ) block including cost of Cement,sand andstone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO construction Manual.
38Muffing of poles size 0.45 cm x 0.60 cm radious with cc 1:3:6(1 cement :3 coarse sand :6 graded stone 10mm nominal size) blocksize 45cm height from ground level including cost of cement, stone and sand etc.
39Earthing of support with M.S. Earth rod of 2.5 meter long by hammaring of M.S. Rod to proper depth and connecting the earth electrode with the helpof G.I. wire as per construction manual.
40Fabrication of M.S. Channel Angle iron after cutting in requiredsizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc. as per RESSPO sehedule and local approved drawing.
41Excavation of earth for Stay pit of size 0.6x0.6x1.2mtrin all type of soil including proper dressing of sides and ramming of bottom including getting out the excavated soil and disposal of surplus excavated soil as directed complete work
42Fixing , tightening and nozzaling of 11 KV Stay with pole and stay rod on required tension as per drawing / RESSPO manual.
43Grouting of Stay in size 0.6x0.6x0.3 in CC ratio 1:4:8 (1 cement :4 graded stone 20mm nominal size: 8 coarse sand ) block including cost of Cement,sand andstone ballast back filling of soil and boulders in pit and ramming and proper alignment, leveling as per RESSPO Manual.
44Making of section pole for existing HT line complete in all respect.
45Fixing of 11 KV XLPE Jointing Kit
46Fixing of 11 KV XLPE Straight Through
47Fixing of Danger Board and number plate complete by providing clamps of M.S. Flat 50x6 mm and Nuts & Bolts, danger Boards of M.S. Sheet 2 mm Thick 11\"\"x7\"\" size.
48Maintenance of DTR
49Dismantling and Relaying of 11 KV AB Cable
50Resagging the 11 KV AB Cable spiliting 3PH
51FIXING OF 11KV 90KN TENSION CLAMPB&IPC
52FIXING OF 11KV IPC FOR COVERED -COVERED
53FIXING OF 11KV IPC COVERED TOBARE COND.
54Straightening of tilted PCC / ST Poles complete as per RESPO drawing.
55Renozzeling of Existing Stay Set
56Laying , Spreading and Stringing AAAC Conductor
57Fixing of 11 KV CABLE TIES FOR PIN INSULATOR
58Route cleareance by cutting of tree branches / proning, loping and chopping of trees for 11 KV line.
59Chemical Earthingincluding digging of pit of size 2.5 Mtr depth and make hole of size 150 mm. Placing of earthing electrode (to be supplied by contractor as per drawing No. A) as drawing B, connecting the same with G.I.Strip (to be supplied by contractor ) of size 35x6 mm as per drawing C for a minimum lenght 6 m. treatment of soil with highly condctive substance as per IS 30343 complete in all respect, result of earthing resistance to be recroded in M.B. before and after installation of earthing. The earth resistance after earthing should be less than 1 Ohm.

AI Tender Summary

OUR REF NO 47909752
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 07-03-2025
Authority
Authority Name Uttarakhand Power Corporation Limited
Work Description E Tender No Resagging Of Unbunch Ht Ab Cable And Replacement Of Damaged Ht Ab Cable To 11 Kv Aaac Conductor (Al-59) In 11 Kv Poorvi Feeder In Edsd Jaspur Ii And Supply Of Its Associated Decentralized Material Under Electricity Distribution Division Jaspur.
Basic Detail
Tender No 38/EDC(K)/2024-25
Bidding Type Tender
Location
City jaspur
State Uttarakhand
Key Dates
Publish Date 22 Feb 2025
Submission Date 07 Mar 2025
Open Date 07 Mar 2025
Finance
Tender Value Ref. Documents
Tender Fee 11800
EMD 3.25 Lakhs
Exemption Not Available
Document List
6c75f68f-0b7a-4838-aaab-3ad50b7c0159.html
38NIT.pdf
38TS.pdf
BOQ_96097.xls
ET38PQR.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Feb 22, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Mar 07, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Mar 07, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

6c75f68f-0b7a-4838-aaab-3ad50b7c0159.html

pdf

38NIT.pdf

pdf

38TS.pdf

xls

BOQ_96097.xls

xls

ET38PQR.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders