|
| 1 | Unlowering of submersible pump set along with lowering pipes with depth up to 120 mtr and submersible cable with safety from tube well, checking the pump set, transportation of pump set from tube well site to storeas direction,receiving repaired / new pump set from store/ divisional store , testing the same, transportation tosite and lowering back into tube well along with submersible cable, lowering pipes,specials etc and commissioning of the tube well. The job also includes cable jointing,checking of discharge of pump set,interconnection of lowering pipe from nearby distribution pipe line,checking of starter and reporting for completion of Job or fault/problem if any. (Upto 20 Km distance run by lowering machine) |
| 2 | For three Phase pump set |
| 3 | G.I. Double Flanged Pipe Lowering Assembly of nominal dia |
| 4 | 50 mm |
| 5 | For singlePhase pump set |
| 6 | G.I. Double Flanged Pipe Lowering Assembly of nominal dia |
| 7 | 32 mm |
| 8 | 50 mm |
| 9 | HDPE Pipe Lowering Assembly of nominal dia |
| 10 | 32 mm |
| 11 | Only unlowering of submersible pump set along with lowering pipes depth up to 120 mtr and submersible cable with safety from tube well, checking the pump set,reporting and transportation of pump set from tube well site to storeas per direction. |
| 12 | For three phase pump set |
| 13 | G.I. Double Flanged Pipe Lowering Assembly of nominal dia |
| 14 | 50 mm |
| 15 | For singlePhase pump set |
| 16 | G.I. Double Flanged Pipe Lowering Assembly of nominal dia |
| 17 | 32 mm |
| 18 | 50 mm |
| 19 | HDPE Pipe Lowering Assembly of nominal dia |
| 20 | 32 mm |
| 21 | Only lowering of the submersible pump setinto tube well along with submersible cable, lowering pipes depth up to 120 mtr,specials etc and commissioning of the tube well. The job also includes cable jointing,checking of discharge of pump set,interconnection of lowering pipe from nearby distribution pipe line,checking of starter and reporting for completion of Job or fault/problem if any. |
| 22 | For three phase pump set |
| 23 | G.I. Double Flanged Pipe Lowering Assembly of nominal dia |
| 24 | 50 mm |
| 25 | For singlePhase pump set |
| 26 | G.I. Double Flanged Pipe Lowering Assembly of nominal dia |
| 27 | 32 mm |
| 28 | 50 mm |
| 29 | HDPE Pipe Lowering Assembly of nominal dia |
| 30 | 32 mm |
| 31 | Unlowering of pump set along with lowering pipes and submersible cable with safety from Openwell For three Phase pump set having G.I double flanged/ HDPEpipe lowering asembly of size 50 mm to 80 mm, checking the pump set,reporting and transportation of pump set from tube well site to store. |
| 32 | Fabrication & Fixing M.S.Stand of specified class of angle iron L-shaped of 50 mm size with four legs grouted by 300*300*300 mm CC Block M-15 in the ground and all legs tied up with each other through same size of angle iron along with cross bars to support the bottom of 1000 Ltr./ 2000 Ltr. PVC tank complete in all respect. |
| 33 | Providing and Fixing of ISI marked PVC storage tank of following capacityas per IS: 12701-1989 (of approved make) with cover, 25 mm dia. 1 mtr long GI overflow pipe, 25 cm long 25 mm dia washout GI pipe with plug & socket, including P&F 32 mm dia Ball Cock (Float valve) IS 1703 marked with rod and PVC ball complete with brass weight 1000 gm, including P&F 15 mm dia CI quarter turn heavy duty Bib Cocks four nos. of superior quality and approved make, including interconnections complete job. |
| 34 | 1000 litres capacity |
| 35 | 2000 litres capacity. |