| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual meansover areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan)including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5m, as directed by Engineer-in-charge As per DAR 2.6.1 |
| 2 | P/Lin position inC.C specified grade excluding the cost of centering, shuttering ,finishing and reinforcement ( 1:6:12)with cement , coarse sand and 40mm gauge B/ ballast i/c all as per PWD(SCH)273 |
| 3 | Class M-150 brick work in 1:6 cement and coarse sand mortar in foundation and plinth i/c supply of all materials, labour and T&P etc. required for proper completion of the work. as per direction of engeniar as per DAR 6.1.2 |
| 4 | Class M-150 brick work in 1:4 cement and C sand mortar insuper structurei/c supply of all materials, labour and T&P etc. required for proper completion of the work. as per DAR 6.4.1 |
| 5 | R .C.C.Work in 1:1.5:3 ,cement , coarse sand , 20 mm gauge stone grit of not less than strength of M - 150 and curing complete I/c all material , labour and T & P etc. . required for proper completion of the works .as per DAR 5.2.2 |
| 6 | Centering and shuttering including strutting , propping etc. and removal of form for Lintels ,beams , plinth beams ,girdes ,bressumers and cantilevers as per DAR 5.9.5 |
| 7 | Centering and shuttering including strutting , propping etc. and removal of form for columns , pillars, piers , abutments , posts and structs as per DAR 5.9.6 |
| 8 | 12 mm thick plaster of mix 1:4 (1 cement : 4 c/sand )i/c all as per DAR No-13.4.1 |
| 9 | Steelreinforced for R.C.C work to required shape of steel bars as necessary including bending, cuting ,placing inposition i/c all complete the work -DSR-5.22 |
| 10 | P/A of White Cement basedPutty of average thickness 1 mm , of approved brand and manufacturer , over the plastered wall surface to prepare the surface even and smooth complete as per DAR 13.80 |
| 11 | Finishing wall with premium acrylic smooth exterior paint as per DAR 13.47.1 |
| 12 | P/F of inauguration stone with all completion etc. |
| 13 | Add 18% GST |