Housing Urban and Rular Development Government Departments Closing in 0 days TDR #47857040

Tender For Construction Of 2 Lane Rob. In Lieu Of At Lxing 4C At Km. 05H-06H On Tapri Hindon Cabin Section Near Tapri Junction Railway Station In Distt. Saharanpur

Issued by Government Departments · tapri, Uttar Pradesh
Tender Value
16.20 Crore
Estimated cost
Bid Submission
22 Mar 2025
0 days left
EMD
32.40 Lakhs
Bank guarantee accepted
Document Fee
20000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
tapri → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of 2 Lane Rob. In Lieu Of At Lxing 4C At Km. 05H-06H On Tapri Hindon Cabin Section Near Tapri Junction Railway Station In Distt. Saharanpur

BOQ

Name of Work: Construction of 2-Lane R.O.B. in Lieu of at L-Xing 4C at Km. 05H-06H on Tapri-Hindon Cabin Section Near Tapri Junction Railway Station in Distt. Saharanpur
Sl. No. Item Description
1FOUNDATION
2Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.E/W in Excavation of Foundation
3Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately Dismantling of Flexiblepavement
4Plain Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Concrete
5Plain Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. Footing
6Excavation in Soil by Mannual Means. Back Filling of Earth
7Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.Including straightening, cutting, bending, shifting to site, tying and placing in positionHYSD bar reinforcement in Foundation
8SUB-STRUCTURE
9Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications. RCC using batching plant transit mixer & Concrete pump including cost of Material labour, machinery and Form work complete. Pier & Abutment
10Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications. RCC using batching plant transit mixer & Concrete pump including cost of Material labour, machinery and Form work complete. Pier Cap & Top Beam
11Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications. RCC using batching plant transit mixer & Concrete pump including cost of Material labour, machinery and Form work complete. Pedestal
12Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications. RCC using batching plant transit mixer & Concrete pump including cost of Material labour, machinery and Form work complete. Seismic Arrester
13Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications. RCC using batching plant transit mixer & Concrete pump including cost of Material labour, machinery and Form work complete. Back Wall
14Supplying, fitting and fixing in position true to line and level POT-PTFE bearing consisting of a metal piston supported by a disc or unreinforced elastomer confined within a metal cylinder, sealing rings, dust seals, PTFE surface sliding against stainless steel mating surface, complete assembly to be of cast steel/fabricated structural steel, metal and elastomer elements to be as per IRC: 83 part-I & II respectively and other parts conforming to BS: 5400, section 9.1 & 9.2 and clause 2006 of MoRTH Specifications complete as per drawing and approved Technical Specifications. POT PTFE Bearing
15Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications. Including straightening, cutting, bending, shifting to site, tying and placing in position. HYSD bar reinforcement in Sub Structure
16SUPER-STRUCTURE
17Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification. including cost of Material labour, machinery T & P and Form work complete.PSC Main Beam
18Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification. including cost of Material labour, machinery T & P and Form work complete. RCC in Deck & Solid Slab Cross Beam
19PCC levelling course below approach slab including cost of Material labour, machinery T & P and Form work complete as per drawing and Technical specification Approach Slab Lean
20Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification RCC Approach Slab
21Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification. Crash Barrier
22Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification. including cost of Material labour, machinery T & P and Form work complete. Expention Joint Strips Concrete
23Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications HYSD in super str.Including straightening, cutting, bending, shifting to site, tying and placing in position HYSD bar in Super Structure
24High tensile steel wires/strands including all accessories for stressing, stressing operations and grouting, T & P and Labour complete as per drawing and Technical Specifications High Tensile Strand/Wires
25Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer\"s instructions for installation.. Strip Seal Expansion Joint
26Providing, fitting and fixing mild steel railing complete as per drawing and Technical Specification
27Supply and Fixing Drainage Spouts including Corrosion resistant Structural steel, G.I. Pipe 100mm, Galvanised MS flate clamp, 100mm PVC Pipe upto ground level T&P and Labour complete as per drawing and Technical specification Drainage Spout
28Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6per centof mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects. Bituminous Concrete (BC) in Wearing Coat
29Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Tack Coat
30Providing and applying 2 coats of water-based cement paint to unflustered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm. Including all material labour and T&P complete.Painting on Crash Barrier
31R.E. & R.C.C. Wall
32Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately. Dismantling of Flexible Pavement
33Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. E/W in Excavation in RE Wall
34Reinfiorced Earth Structures (Facing Elements of RCC). With Geo composite drinage sheet. Area of RE Wall
35Plain/Reinforced Cement Concretecomplete as per Drawing and Technical Specifications. Leveling Pad Concrete in RE Wall
36Plain/Reinforced Cement Concretecomplete as per Drawing and Technical Specifications. Coping Beam on R.E. Wall top for required Level
37Plain/Reinforced Cement Concretecomplete as per Drawing and Technical Specifications. Friction Slab & Road Kerb Lean in RE Wall
38Plain/Reinforced Cement Concretein Substructure complete as per Drawing and Technical Specifications. Road Kerb with R.E. Wall
39Plain/Reinforced Cement Concretein Substructure complete as per Drawing and Technical Specifications. Friction Slab R.E. Wall
40Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification. Crash Barrier on R.E. Wall
41Plain/Reinforced Cement Concretecomplete as per Drawing and Technical Specifications. PCC in Bottom in Retaining wall
42Concrete in Footing in Retaining wall & Wall Portion
43Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. HYSD bar in (RE Wall & RCC Wall)
44Construction of Embankmentwith Supplying of Flyash for filling in between R.E. Wall
45With reinforcing elements of synthetic geogrids. Reinforcing elements of synthetic Geogrids
46Construction of a narrow filter sub- surface drain consisting of porous or perforated pipe laid in narrow trench surrounded by a geotextile filter fabric, with a minimum of 450 mm overlap of fabric and installed as per clause 702.3 and 309.3.5 including excavation and backfilling. 150 mm Ø P.V.C. Pipe Perpetrated for Drainage
47Construction of Granular Sub-Base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. GSB
48Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. WMM
49Providing and laying Dense graded Bituminous Macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per centby weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. DBM
50Providing and laying Bituminous Concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6per centof mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects. Bituminous Concrete (BC)
51Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. Pime Coat (RE & RCC Wall)
52Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Tack Coat (RE & RCC Wall)
53Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm. Painting of Approach Portion
54Providing, fitting and fixing mild steel railing complete as per drawing and Technical Specification. Mild Steel PipeRailing approach portion
55SERVICE ROAD
56Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Earth work in Excavation
57Construction of Granular Sub-Base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. GSB
58Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. WMM
59Providing and laying Dense graded Bituminous Macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per centby weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. DBM
60Providing and laying Bituminous Concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6per centof mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects. Bituminous Concrete
61Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. Pime Coat
62Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. Tack Coat
63Furnising and Placing reinforced/prestressed cement concrete in Drain with HYSD bar as per drawing and Technical specifications. Drain
64OTHER MISCELLANEOUS ITEMS
65Providing and Laying of hot applied THERMOPLASTIC COMPOUND 2.50 mm thick including reflectorising glass bedgs @ 250 gms per sqm area.THERMOPLASTIC COMPOUND
66Suppling and instalation of DELINATORS (Road way indicators). DELINATORS
67Supply & Fixing of LINEAR DELINEATOR (LDS) panels made of Micro Prismatic Retro Reflectifve Sheeting duly laminated on thin aluminium. LINEAR DELINEATOR (LDS)
68Providing & Fixing of REFLECTIVE SIGNS with a corrosion resistant 4 mm thick aluminium composite panel face to be fully covered.REFLECTIVE SIGNS
69Supply & Fixing Pavement Maker (CAT EYE)
70Providing & erecting direction and place IDENTIFICATION RETRO-REFLECTORISED SIGN
71Installation of a steel portable barricade with horizontal rail 300 mm wide, 2.5 m in length fitted on a \"A\" frame made with 45 x 45 x 5 mm angle iron section, 1.5 m in height, horizontal rail painted (2 coats) with yellow and white stripes, 150 mm in width at an angle of 450, \"A\" frame painted with 2 coats of yellow paint, complete as per IRC:SP:55-2001 Baricating during Construction {8.43}
72STAIR CASE
73Construction of Stair Case (As per Drawing)

AI Tender Summary

OUR REF NO 47857040
AUTHORITY Government Departments
TENDER VALUE 16.20 Crore
LAST DATE 22-03-2025
Authority
Authority Name Uttar Pradesh State Bridge Corporation Limited
Work Description Construction Of 2 Lane Rob. In Lieu Of At Lxing 4C At Km. 05H-06H On Tapri Hindon Cabin Section Near Tapri Junction Railway Station In Distt. Saharanpur
Basic Detail
Tender No 2720/30ET/GM(Gzb)/2025
Bidding Type Tender
Location
City tapri
State Uttar Pradesh
Key Dates
Publish Date 20 Feb 2025
Submission Date 22 Mar 2025
Open Date 24 Mar 2025
Finance
Tender Value 16.20 Crore
Tender Fee 20000
EMD 32.40 Lakhs
Exemption Not Available
Document List
780104ca-211b-4f8b-b188-b1154e49f6cf.html
BOQ_1808264.xls
TDOCS.pdf
Tendernotice_1.pdf
GAD.pdf
GMAP.pdf
SDETIALS.pdf
STAIRCASE.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Feb 20, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Mar 22, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Mar 24, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

780104ca-211b-4f8b-b188-b1154e49f6cf.html

xls

BOQ_1808264.xls

pdf

TDOCS.pdf

pdf

Tendernotice_1.pdf

pdf

GAD.pdf

pdf

GMAP.pdf

pdf

SDETIALS.pdf

pdf

STAIRCASE.pdf

Disclaimer