|
| 1 | work name |
| 2 | Dismantling stone slab flooringlaid in cement mortar includingstacking of serviceable materialand disposal of unserviceablematerial within 50 metres lead. |
| 3 | Supplying and filling in plinth with crusher stone dust/ coarse sand under floors including, watering, ramming consolidating in layers not exceeding 20cm in depth in layers not exceeding 20cm in depth and dressing complete. |
| 4 | Providing and laying 60mm thick factory made cement concretenterlocking paver block of M-30 grade made by block making machine with strong vibratory compaction, of approved size, design and shape, laid in required colour and pattern over and including 50mm thick compacted bed of stone dust, filling the joints withsand etc. all complete as per the direction of Engineer-in-charge. |
| 5 | 60 mm thick C.C. paver block of M-30 grade |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : |
| 7 | With 40mm nominal size graded stone aggregate. |
| 8 | M10 |
| 9 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including dressing of sides and ramming of bottom disposal ofexcavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. (No extra lift is payable if work is done by mechanical means) |
| 10 | All kinds of soil |
| 11 | Providing and laying in position specified grade of reinforced cement concrete (with 20mm nominal size graded stone aggregate) excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : |
| 12 | M 20 –Grade Concrete |
| 13 | Centering and shuttering including strutting, propping etc. and removal of form for : |
| 14 | Foundations, footings, bases of columns, etc. forconcrete up to plinth level. |
| 15 | Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding including cost of binding wire up to floor two level including all wastage etc. complete. |
| 16 | Thermo-Mechanically Treated bars.(TMT) take 100kg/cum of rcc |
| 17 | Providing and fixing hand rail of approved size by welding etc. to steel ladder railing, balcony railing, staircase railing and similar works, including applying a priming coat of approved steel primer. |
| 18 | G.I. pipes. 50mm GI pipe unit weight per meter @5.03kg/m |