Tender For Balance Work For Design, Construction And Retrofitting Of Piped Water Supply Scheme Under Jal Jeevan Mission At Village - 1. Rehgun (Sajwani), 2. Sajwani Kham, 3. Bhandarda Block Barwani Distt. Barwani Based On Tube Wells Including Install, Barwani-Madhya Pradesh
TDR : 47850707
Tender Notice
BOQ
Expired
Barwani
Madhya Pradesh
Tender For Balance Work For Design, Construction And Retrofitting Of Piped Water Supply Scheme Under Jal Jeevan Mission At Village - 1. Rehgun (Sajwani), 2. Sajwani Kham, 3. Bhandarda Block Barwani Distt. Barwani Based On Tube Wells Including Install
Name of Work: Balance work for Design, Construction and Retrofitting of Piped Water SupplyScheme under Jal Jeevan Mission at Village - 1. Rehgun (Sajwani), 2. SajwaniKham, 3. Bhandarda Block Barwani Distt. Barwani based on Tube wells includinginstallation of electric submersible/centrifugal water motor pumps, Constructionof 04 Nos. sumpwells ( 01 No.- 20KL ( 5%) At Rehgun (Sajwani), 01 No.- 30KL(5%) At Sajwani Kham , 02 No.- 40KL ( 5% Each ) At Bhandarda, pump houses,laying and jointing of rising main, distribution pipe line system, household tapconnections, electric power connections at Tube wells/Sumpwells etc includingcost of all material and labour with testing commissioning thereafter 90 Days ofsuccessful Trial Run of entire scheme.
Sl. No.
Item Description
1
Balance work for Design, Construction and Retrofitting of Piped Water SupplyScheme under Jal Jeevan Mission at Village - 1. Rehgun (Sajwani), 2. SajwaniKham, 3. Bhandarda Block Barwani Distt. Barwani based on Tube wells includinginstallation of electric submersible/centrifugal water motor pumps, Constructionof 04 Nos. sumpwells ( 01 No.- 20KL ( 5%) At Rehgun (Sajwani), 01 No.- 30KL(5%) At Sajwani Kham , 02 No.- 40KL ( 5% Each ) At Bhandarda, pump houses,laying and jointing of rising main, distribution pipe line system, household tapconnections, electric power connections at Tube wells/Sumpwells etc includingcost of all material and labour with testing commissioning thereafter 90 Days ofsuccessful Trial Run of entire scheme.
2
laying and jointing of rising main, distribution pipe line system, household tap
3
connections, electric power connections at Tube wells/Sumpwells etc including
4
cost of all material and labour with testing commissioning thereafter 90 Days of
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.