Auction Sale Of Unsafe/Abandoned Rcc Tank Capacity 2.25 Lakh Liters At Udn Under Sse Works Surat,Unit: 01 No. Lot Comprises Of : 1] Brick Masonary Of Wall, Passages Etc : 133.44 Cum , 2] Rcc Masonary Of Slabs, Columns, Beams, Parapet Etc : 264.96 Cum, 3] Steel Structural , Such As Ms Pipe 2, C.I. Pipe 8, 4 Pipe , Msstrip 50X50x5mm, Round Bar 16Mm Dia , Appx Qty: 1902.07 Kgs, 4] Rail Structural Released Of Sizes Such As 41 Lbs, 50R, 60 Lbs Etc. Appx. Qty: 4396.28 Kgs, 5] Roof, G.I Sheet, 119.72 Sqm, 6] Wooden Work, Such As Windows , Door, Ventilators , Etc Qty: 7.03 Sqm, Mode Of Delivery By Lot, To Be Sale On As And Where Is Basis, Note: 1] Purchasers Are Requested To See Site /Tank Before Bidding. 2] Whole Strucures To Be Dismantled By The Purchaser And After Clearing/Dispossing Off All Debris From Railway Permises , Purchaser Will Be Allowed To Take Delivery Of His Material. 3] The Items And Material Lying Outside The Building Boundary Line Are Not A Part Of A Auction .4] Electric Wires/Panels And Other Materials Lying Inside The Building Shall Be Removed And Handed Over To Custodian By Purchaser During Dismantling Structure. 5] While Dismantling The Structure Purchaser Will Take Care Such That Adjacent Buiding, Railway Tracks , Assets , Platform Shed, Common Walls And Other Common Members Should Not Be Damaged/Disturb And In Case Of Any Damage Same Asset To Be Rectify By Purchaser. 6] The Structure Above Ground Level Is To Be Considered For Auction. Excavation Below Ground Level Is Not Allowed. 7] All Safety Majors (Pvc Safty Net, Scaffolding Net Etc ) Should Be Taken By Purchaser To Avoid Any Unusuall At Works Site. 8] Barricading/ Protection Shall Be Provided By Purchaser To Avoid Any Accident .9] If Any Accident /Unusuall Occurs At Work , Purchaser Alone Will Bare Full Responsibility And Railway Officials Will Not Be Responsible For Such Unusuall Happening. 10] During Dismantling Work Safety Of Running Tracks, Coaches, Other Railway Property & Railway Staff As Well Has His Own Labour Should Be Ensured By Purchaser And Dismantling Work Shall Be Carried Out With Full Safety Measures Of Working Staff And Others, 11] Sse Works St Is Requested To Evacuate The Office, Staff Area Occupiying The Structure To Be Dismantled , 12] All Type Of Valves Released Of This Rcc Tank Are Reclaim Items And Are To Be Handed Over To Custodian During Dismantling , 13] Fdp Allowed Is 50 Days