Name of Work: uxjikfydk {kS= fiM+kok esa uxj dh lqUnjrk gsrq >ksiMh@xtscksa vkSj jke y{e.k ,oa lcjh dh ewfrZ dk fuekZ.k dk;ZA
Sl. No.
Item Description
1
NON BSR ITEM
2
ConstructionofHut/Gazebo/ as perfollowing andenclosedphotographcircularplatformatground level goving overall dia not less then 4.60 mtr with 1.5 mtr. Width in annular shape footpath- plinth level area 17 sqm (Dai of circular platform not less than4.66 mtr) plinth height 0.60 mtr From Ground level shouldbe in three Equal steps having rise 15 cm with on side gentle slope ramp having width 1.0 ma and with and with side relines 1st roof level height should be not less than 3 mtr from plinth level total covered area of 1st roof level not less than 21.50 sqm- Roof should he made in frustum of cone shape having frustum height 0.60 mtr and thickness of roof slab should not be less than0.125 mtr 2nd roof should be made not less than 2.0 mtr dia at Bottom with 0.60 mtr cone °eight at centre difference of level between both roof should be riot less than 1 mtr with 6 floc RCC (m-20) circular column giving dia 0.23 mtr with required reinforcement fromplinthlevelofsupport1strooflevelhavingloadbearingcapacityofbothroofswithrequired foundation the but should be facilitated with 12 No. Round sitting bench of 0.45 mtr width and 0.10 mtr thick should be made in RCC of M-20 RCC work should be complete in M-20 with required reinforcement (Not less than minimum) as per relevant look of wooden finishing with ornamental plaster in rich mortar usingwhilecementoxidecolourandbamboo/BallDesignwithFlanlfinishedin touchwoodcolour(twoor more coats) as per photograph enclosed with giving aesthetic look . The job work should be complete as per direction of engineer in charge and up to satisfaction of engineer.(as per Drawings)
3
Making of railing as per followingSpeciation design 2. Nos. vertical pole should be made in 1 0 mtr Distance & 1.0 Mtr. Height and also of 3\" thickness. 2 Nos. cross pole should be made per above specification.1 Nos. horizontal pole should be use made on top side as per above specification3 Nos. 8mm size bars should be use every pole with 6 nos. rings of 4m.G.I.Wire. TheStainlesssteelMurgaJhalishouldbefixedwithevery poleforC.C. Work. All poles should be complete by 1:1:2 R.C.C. Mixture The Plaster work should be complete by 1:2 mortar of not less than 12 mm thick. Finishing work should be complete bywhitecementoxidecoloursasperdirection&madethepillarinBallyorBamboo designorasperdirectionafterfinishingworkshouldbedonetwocoatsoftouch wood. Work should be done as per direction of incharge
4
Constructions of Saabri Ramji scene where Ramji and laxmanjireached at saabri’s house and saabri offered him to jujube. The scene will be recreated in statue of Sabri Ramji and Laxmanji as per drawings.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.