Auction Sale Of Unsafe/Abandoned Yd Master Office And Ctnl Tower At Udn Under Sse Works Surat, Lot Comprises Of : 1] Brick Masonary Of Wall, Ventilator, Staircase Wall Etc : 164 Cum , 2] Rcc Masonary Of Sunshed, Slab, Columns, Beams, Loft Etc : 118.52 Cum, 3] Steel Structural , Such As Grill H 12Mm , 16Mm, Sq. Bar, Ms Strip 20X5mm, 30X3mm, 40X5mm, 50X5mm, 50X10mm, 20X5mm, 80X10mm, Outer Steel Fencing 50X10mm, Ismc 100, , Ms Angles 50X50x5mm, 50X60x5mm, 80X80x5mm, 80X80x6mm, 40X40x3mm, 40X40x5mm, Angle 40X40x6mm, 65X65x5mm, I Beam 150, 250, Channel 100Mm, C Channel 150, 200Mm, Ms Bar Dia 16Mm, Pipe 1, Pipe2, Qty: 11787.97 Kgs, 4] Rail Structural Released Of Yard Master Office , Such As 41 Lbs, 70R, 50 R, Double Gola, Etc, Qty:2594.63 Kgs, 5] Roof, G.I Sheet, 119.72 Sqm, 6] Wooden Work, Such As Windows , Door, Ventilators , Qty: 121.01 Sqm, Mode Of Delivery By Lot, To Be Sale On As And Where Is Basis, Note: 1] Purchasers Are Requested To See Site /Qtrs/Office Building Before Bidding. 2] Whole Strucures To Be Dismantled By The Purchaser And After Clearing/Dispossing Off All Debris From Railway Permises , Purchaser Will Be Allowed To Take Delivery Of His Material. 3] The Items And Material Lying Outside The Building Boundary Line Are Not A Part Of A Auction .4] Electric Wires/Panels And Other Materials Lying Inside The Building Shall Be Removed And Handed Over To Custodian By Purchaser During Dismantling Structure. 5] While Dismantling The Structure Purchaser Will Take Care Such That Adjacent Buiding, Railway Tracks , Assets , Platform Shed, Common Walls And Other Common Members Should Not Be Damaged/Disturb And In Case Of Any Damage Same Asset To Be Rectify By Purchaser. 6] The Structure Above Ground Level Is To Be Considered For Auction. Excavation Below Ground Level Is Not Allowed. 7] All Safety Majors (Pvc Safty Net, Scaffolding Net Etc ) Should Be Taken By Purchaser To Avoid Any Unusuall At Works Site. 8] Barricading/ Protection Shall Be Provided By Purchaser To Avoid Any Accident .9] If Any Accident /Unusuall Occurs At Work , Purchaser Alone Will Bare Full Responsibility And Railway Officials Will Not Be Responsible For Such Unusuall Happening. 10] During Dismantling Work Safety Of Running Tracks, Coaches, Other Railway Property & Railway Staff As Well Has His Own Labour Should Be Ensured By Purchaser And Dismantling Work Shall Be Carried Out With Full Safety Measures Of Working Staff And Others, 11] Dismantling Will Be Supervised By Sse W-St , 12] Rails Mentioned In Discription Above Are Part Of Lot (Auction), Rails Other Than Mentioned Above And Rails Released Of Old Control Tower Are Reclaim Items And To Be Handed Over To Custodian During Dismantling. 13] Fdp Allowed Is 50 Days