| 1 | (2.1) Dismantling of flexible pavements and disposal of dismantledmaterials up to a lead of 50 metres as directed by Engineer. |
| 2 | (2.10.1) Bituminous courses |
| 3 | (2.10.2) Granular courses |
| 4 | (4.2.1) Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301.In all type of soil |
| 5 | (1.1.3) Carriage of Materials by mechanical transport including loading,unloading and stacking ::Stone,boulders,gravelly material Beyond 5Km upto 10Km.per Km. |
| 6 | (4.1) Dressing of earth work in surface excavation including cutting and filling upto 30cm depth including disposal of excavated earth upto 50m and lift upto 1.5 m. |
| 7 | (4.4) Construction of embankment with approved material obtained from borrow pit with all lifts and leads, transporting to site, spreading, grading to required slope and compacting by vibratory roller 8-10 tonne to meet requirement of table 300-2 including cost of compensation for earth taken from private land complete as per MoRT&H specification clause 305. (Lead taken upto 5 km) |
| 8 | (7.5.1) Providing, laying and spreading of granular sub-base by providing coarse graded Material (Table 400-2), spreading in uniform layers with motor grader on prepared surface, mixing BY MIX IN PLACE METHOD with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H specification clause - 401 including all material, labour, machinery, lighting, guarding and maintenance of diversion. Grading - III Material |
| 9 | (7.6) Providing, laying, spreading (with paver finisher only) andcompacting wet mix macadam (WMM) base course comprising of graded stone aggregate and granular material conforming to MORT&H specifications (Table 400-II) in layers of equal compacted thickness each consolidated, including pre-mixing the material withwater at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tippers to site, laying in uniform layers in base course on a well prepared sub-base/ base course and compacting with power vibratory-roller to achieve the desired density complete as per MoRT&H specification clause - 406 including all material, labour, machinery, lighting, guarding and maintenance of diversion |
| 10 | (8.3) Providing and applying tack coat on the prepared surface withbitumen emulsion as per IS: 8887 and approved quality @ 0.2 kg/sqm with the help of spray set fitted on bitumen Container (boiler) after cleaning the surface with brooms or soft brushes and finally dusting with old gunny bags and compressed air to receive bituminous treatment complete as per clause 502 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. |
| 11 | (8.8.5) Providing and laying 50-75 mm compacted thick design mix (approved by Engineer) Dense Bituminous Macadam on prepared surface with specified graded crushed aggregates as per Table 500- 9, 500-10 with bitumen binder set (including cost of anti-stripping compound wherever required) for base/ binder course including loading of material with F.E. loader, heating and mixing of stone aggregate, filler and bitumen in computerised hot mix plant,transporting the mixed material by tippers to paver and laying with paver finisher fitted with electronic sensor control as per clause 504.3.5 to the required level and grade, compacting by power rollers and vibratory rollers or 150 to 250 KN pneumatic tyred roller with TP = 0.7 Mpa to achieve the desired density (approximately 2.3 tonne/cum) complete as per clause 507 of MoRT&H specification but excluding primer/tack coat, including all material, labour,machinery, lighting, guarding and maintenance of diversion.Grade-II with Bitumen VG-grade 30 @ 4.25 %, lime filler @ 2% (percent by weight of total mix) |
| 12 | (8.10.4) Providing and laying 30-45 mm compacted thickness BituminousConcrete as per design mix (approved by Engineer) on preparedsurface with specified grade stone aggregate as per Table - 500-18 with bitumen for wearing course including loading of aggregate with F.E. loader and hot mixing of stone aggregate and bitumen (including cost of anti-stripping compound wherever required) in computerised hot mix plant, transporting the mixed material by tippers to paver and laying with paver finisher fitted with electronic sensing device (as per clause 504-3.5) to the required level and grade and compacting by power rollers and vibratory rollers or 150 to 250 KN pneumatic tyred roller with TP = 0.7 Mpa, to achieve the desired density complete as per clause 509 of MoRT&H specification including all material, labour, machinery, lighting,guarding and maintenance of diversion but excluding primer/tack coat.Grade-II with Bitumen VG-grade 30 @ 6% (percent by weight of total mix) |
| 13 | (12.4.1) Providing and laying Precast reinforced cement concrete Box culvert section of M-40 grade designed for \"AA\" class loading as per IRC specifications including the effect of impact, EQ etc. complete on firm base of 200mm thick lean concrete of M-10 grade with aggregate of size 40mm nominal of following internal sizes. The work includes required safety measures, construction of drain for diversion of flowing water, cost of design of RCC Precast Box and its proof checking from IIT/MNIT Jaipur etc. complete in all respect as per specifications Size 0.60 M x 0.60 M |
| 14 | (17.20.4) Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP2 class (with s/s ends IS: 458 - 1988 (amended up to date) marked and manufactured through spun process at all levels with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers, Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable. 300 mm internal diameter |