Design, Engineering, Manufacture, Assembly, Shop Testing, Shop Painting, Packing, Transportation To Site, Supervision Of Erection, Commissioning And Performance Guarantee Tests Of Main Trough Forced Air Cooling System Design, Engineering, Manufacture, Assembly, Shop Testing, Shop Painting, Packing, Transportation To Site, Supervision Of Erection, Commissioning And Performance Guarantee Tests Of Main Trough Forced Air Cooling System , Part A - Design, Engineering & Supply Of Equipment / Items , Design & Engineering , Supply Of Items / Equipment , Sisw/ Didw Centrifugal Fan: A) Flow (Each): 32,000 Nm3/H B) Outlet Static Pressure: 7 Kpa C) Differential Pressure: 8 Kpa D) Installed Power (Each): ~120 Kw (However, Final Rating Shall Be Provided By Bidder) E) Suspended Dust Concentration: Steel Plant Ambient F) Noise Level: < 85 Db (A) , Drive Motor (Squirrel Cage Induction Motor), Couplings Along With Guards, Requisite Accessories, Actuators, Limit Switches, Junction Boxes, Mounted Electrics, Etc. , Outlet Damper At Fan Discharge , Expansion Joints At Fan Discharge , Butterfly Valves (Dn 500) , Butterfly Valves (Dn 150) , Butterfly Valves (Dn 100) , All Companion Flanges, Gaskets & Fasteners, Special Tools & Tackles (If Any), Etc. , Commissioning Spares , Part B - Supervision Services For Erection, Trial Run & Testing, Commissioning And Pg Tests , Supervision Services For Erection, Trial Run & Testing, Commissioning And Pg Tests , Note : - 1. Bidder To Quote On Man-Day Rate Basis. 2. Only Man-Day Charge Shall Be Paid Based On Actual Man Days Consumed. All Other Expenditures Towards Site Supervision Deployment Viz. Boarding, Lodging, Food, Transportation, Gate Pass Issuance, Etc. Shall Be Borne By The Bidder.