| 1 | Excavation, beautification and wall |
| 2 | Cleaning, Jungle i/c rooting of rank vegeration grass bush etc and saping girth upto 30cms measured at the height of 1m above ground level and removal of rubbish upto a distance of 50m outside the periphey of area cleared. |
| 3 | Dewatering by Diesel Pumping set of 5.0 hp power capacity during the construction of pond wall i/c higher charges of pumping set and its POL, labour all T&P etc all complete.in all respect.(ch 19 MISCELLANEOUS NEWITEM NO 2) |
| 4 | Excavation in foundation in ordinary soil (loam,clay or sand ) including lift upto 1.50 M and lead upto 30 M including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in charge upto a distance of 30 M from the foundation trenches |
| 5 | Disposal of Excavated Earth up to distance 5.00 Km including supply of all material,labour and T&P etc.required for proper completion of work Above item No. 80% |
| 6 | Cement Concrete with 4cm guage approved stone ballast coarse sand and cement in proporation of 8:4:1 including supply of all material labour and T&P etc.required for proper completion of work. |
| 7 | M-150 brick work in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work |
| 8 | 12mm thick Plaster in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work |
| 9 | Cement concrete with 2cm gague approved stone ballast coarse sand and cement in proporation of 4:2:1 but with 2cm gaguge stone gritt instead of 4cm gauge stone ballast inculding supply of all materials labour and T&P etc for proper completion of work.As par S.I No-279A Ch.-05 |
| 10 | WBM Grading 3 (22.4-53 mm Stone ballast) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405. |
| 11 | S/Laying of 80mm thick I Shadped Vibrator made interlocking Cement Conc Paver Block(cement gray and red colour) i/c joint filling with local sand i/c all complete at site |
| 12 | R.C.C work with cement approved coarse sand and 2 cm guage approved stone Ballast in proportion of 1:1.5:3 excluding supply of reinforcement and its bending butincluding its fixing and binding the same with 24 B.W.G.I binding wire and including the cost of binding wire and including necessary centering and shuttering etc and supply of all material,labour and T&P etc.required for proper completion of work |
| 13 | Mild steel or iron in plain work such as concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work. As per S.I. No. 504 of Ch. 10. |