| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m |
| 2 | Random rubble stone masonry work in cement mortar with mechanical mixer in foundation (at any level) complete as per drawing and technical specification and as per clause 1000 and 1400 of MoRT&H specification including all scaffolding material, labour, machinery but excluding pointing and plastering.In cement mortar 1:3 (1 cement : 3 coarse sand) |
| 3 | Providing and laying structural plain/ reinforced cement concrete (design mix) of specified grade in substructure at all levels using concrete mixer and vibrater, including cost of form work, as per drawing and technical specifications complete as per clause 1500, 1700 and 2200 of MoRT&H specification including all material, labour, scaffolding etc. PCC Grade M -25 |
| 4 | Providing and laying TMT bar reinforcement at any level in foundation/ pile/ pile cap complete as per drawing and clause 1600 of MoRT&H Specification including all material, labour and machinery. Reinforcement with TMT bar in sub structure |
| 5 | On new plastered concrete surface |
| 6 | Providing and fixing Granite stone slab mirror polished and machine edge cut in walls, pillars, steps, Shelves, Sills Counters, Floors etc. laid on 12mm (Av.) thick base of cement mortar 1:3 (1 cement : 3 coarse sand) jointing with white cement mortar 1:2 (1white cement : 2 marble dust) with pigment to match the shade of the marble slab including grinding, rubbing and polishing complete. Green / BlackAbove 3601 Cm2 Slabs |
| 7 | Supply and planting following in poly bags / earthen pots well branched, well established & free from disease of 300 mm min. height ground covers at site in 0.3 m dia holes, 0.3 m deep dug in the ground, mixing the soil with decayed farm yard/sludge manure, backfilling the hole watering etc as required. Golden duranta |
| 8 | Planting permanent hedges including digging of trenches, 60 cm wide and 45 cm deep, refilling the excavated earth mixed with farmyard manure, supplied at the rate of 4.65 cum per 100 metres and supplying and planting hedge plants at 30 cm apart. |
| 9 | Planting Flowering Plants and Shrubs in Central Verge. |
| 10 | ConstructionofHut/Gazebo/ as perfollowing andenclosedphotographcircularplatformatground level goving overall dia not less then 4.60 mtr with 1.5 mtr. Width in annular shape footpath- plinth level area 17 sqm (Dai of circular platform not less than4.66 mtr) plinth height 0.60 mtr From Ground level shouldbe in three Equal steps having rise 15 cm with on side gentle slope ramp having width 1.0 ma and with and with side relines 1st roof level height should be not less than 3 mtr from plinth level total covered area of 1st roof level not less than 21.50 sqm- Roof should he made in frustum of cone shape having frustum height 0.60 mtr and thickness of roof slab should not be less than0.125 mtr 2nd roof should be made not less than 2.0 mtr dia at Bottom with 0.60 mtr cone °eight at centre difference of level between both roof should be riot less than 1 mtr with 6 floc RCC (m-20) circular column giving dia 0.23 mtr with required reinforcement fromplinthlevelofsupport1strooflevelhavingloadbearingcapacityofbothroofswithrequired foundation the but should be facilitated with 12 No. Round sitting bench of 0.45 mtr width and 0.10 mtr thick should be made in RCC of M-20 RCC work should be complete in M-20 with required reinforcement (Not less than minimum) as per relevant look of wooden finishing with ornamental plaster in rich mortar usingwhilecementoxidecolourandbamboo/BallDesignwithFlanlfinishedin touchwoodcolour(twoor more coats) as per photograph enclosed with giving aesthetic look . The job work should be complete as per direction of engineer in charge and up to satisfaction of engineer.(as per Drawings) |
| 11 | Making of railing as per followingSpeciation design 2. Nos. vertical pole should be made in 1 0 mtr Distance & 1.0 Mtr. Height and also of 3\" thickness. 2 Nos. cross pole should be made per above specification.1 Nos. horizontal pole should be use made on top side as per above specification3 Nos. 8mm size bars should be use every pole with 6 nos. rings of 4m.G.I.Wire. TheStainlesssteelMurgaJhalishouldbefixedwithevery poleforC.C. Work. All poles should be complete by 1:1:2 R.C.C. Mixture The Plaster work should be complete by 1:2 mortar of not less than 12 mm thick. Finishing work should be complete bywhitecementoxidecoloursasperdirection&madethepillarinBallyorBamboo designorasperdirectionafterfinishingworkshouldbedonetwocoatsoftouch wood. Work should be done as per direction of incharge |
| 12 | Constructions of Saabri Ramji scene where Ramji and laxmanjireached at saabri’s house and saabri offered him to jujube. The scene will be recreated in statue of Sabri Ramji and Laxmanji as per drawings. |