|
| 1 | Electrical Items : |
| 2 | STAY CLAMP FOR SP-21 WITH NUT & BOLT |
| 3 | STAY CLAMP FOR SP-10 WITH NUT & BOLT |
| 4 | SUSPENSION CLAMP EYE HOOK LT ABC CABLE |
| 5 | DEAD END CLAMPS WITH I HOOK AND N/B INS |
| 6 | Piercing Connector 70 Sq.mm-70Sq.mm |
| 7 | Piercing Connector 70 Sq.mm-35Sq.mm |
| 8 | Piercing Connector 35 Sq.mm-35Sq.mm |
| 9 | INSULATED PIERCING CONNECTOR 50-50 SQ.MM |
| 10 | INSULATED PIERCING CONNECTOR 50-35 SQ.MM |
| 11 | LT (Unarm.) XLPE Insulated cable 1x70mm² |
| 12 | LT XLPE Cable 1x35 sqmm |
| 13 | LT XLPE AB CABLE 3X70+1X50 SQ.MM. |
| 14 | LT AB Cable 3x35+1x25 sqmm |
| 15 | LT XLPEAB CABLE 1CX16+25 SQ.MM. |
| 16 | LT AB CABLE 3CX50+1X35 SQ.MM |
| 17 | LT DISTRIBUTION BOX 1 PHASE |
| 18 | LT DISTRUBITON BOX 3 PHASE |
| 19 | AL. CRIMPING TYPE LUGS70 SQ.mm |
| 20 | AL CRIMPING TYPE LUGS35 SQ.mm |
| 21 | CONNECTOR FOR SERVICE CONNECTION I PH |
| 22 | LABOUR(SERVICES) |
| 23 | CHEMICAL EARTHING |
| 24 | EXCAVATION OF PIT FOR STAY SET |
| 25 | ERECTION OF LT STAY SET |
| 26 | GROUTING OF STAY SET |
| 27 | EXCAVATION OF PIT FOR POLE |
| 28 | ERECTION OF SINGLE SP-10 POLE |
| 29 | ERECTION OF SINGLE SP-21 POLE |
| 30 | GROUTING OF POLE |
| 31 | DISMANTLING OF SP-10 SINGLE POLE |
| 32 | DISMANTLING OF SP-21/SP-23 SINGLE POLE |
| 33 | DISMANTLING OF LT LINE 1 P 2 W(WEASEL) |
| 34 | DISMANTLING OF LT LINE 2 P 3 W(WEASEL) |
| 35 | DISMANTLING OF LT LINE 3 P 4 W(WEASEL) |
| 36 | DISMANTLING OF 25 KVA DTR |
| 37 | INST. OF 63 KVA DTR ON POLE STRUCTURE |
| 38 | LOPPING & CHOPPINGOF TREE BRANCHES |
| 39 | CARTAGESP-10 POLE, 100-150KM |
| 40 | CARTAGESP-21/23 POLE, 100-150KM |
| 41 | CARTAGE OF PETTY MATERIAL,100-150KM |
| 42 | CARTAGE OF 63 KVA DTR, 100-150KM |
| 43 | HEADLOAD CARTAGESP-10 POLE(0-1 KM) |
| 44 | HEADLOAD CARTAGE SP-21/23 POLE(0-1 KM) |
| 45 | HEADLOAD CARTAGE OF MATERIAL(0-1 KM) |
| 46 | HEADLOAD CARTAGE OF 25 KVA DTR(0-1 KM) |
| 47 | HEADLOAD CARTAGE OF 63 KVA DTR(0-1 KM) |
| 48 | DISCONNECTION & RECONNECTIONOF CONsumer |
| 49 | LAYING OF LT AB CABLE 3X70+1X50 SQMM |
| 50 | LAYING OF LT AB CABLE 3X35+1X25 SQMM |
| 51 | Installation of LT DB 1 Ph for LT AB |
| 52 | Installation of LT DB 3 Ph for LT AB Cab |
| 53 | Laying of AB Cable 1x16+25 mm |
| 54 | BACK CARTAGE OF PETTY MATERIAL,150-200KM |
| 55 | Laying and fixing of 1x35sqmm XLPE Cable |
| 56 | BACK HEAD LOAD CART. OF PETTY MAT. 0-1KM |
| 57 | DISMANTLING OF LT XLPE CABLE 1CX16+25 |
| 58 | LAYING OF LT AB CABLE 3CX50+1X35 |
| 59 | Transportation Charges of 25 KVA |