Tender For Restoration of Saidgarhi Minor of Lakhavati Branch and demarcation of canal land under the first phase of District Madhya Ganga Canal. - 1 Restorationworks of Saidgarhi Minor M.G.C.Project First Stage. 2 Earth work in silt clearance including lift up to 1.5 M and lead up to 30M including ramming and dressing by manual labour. The earth from clearance to be used in side embankment or to be disposed off at spoil banks or as directed by Engineer-in-charge. 3 Earth work in embankment in ordinary soil excavation to be in the of irrregular pits and earth work in embankment to be in 20 Cm. layers, Includingramming and dressinig with machenical compaction.The surface to the required levels and slopes and also including 1.50 m. lift and 30.00 m. lead. as directed by Engineer-in-charge. 4 CC Lining of Saidgarhi Minor M.G.C.Project First Stage. 5 Earth work in foundationin dryinordinary soil including ramming and dressing the surface ,including 1.50m. Lift 30m. Lead i/c filling watering excavated earth into the plinth . for proper complition of work. 6 Provide shuttering and centering including all materials and T&P etc for proper complition of work. 7 C.C. work for sleeper cost of material and T & P etc. in 1 : 2: 4includingcost of all material,labour T&P etc. and Shuttering required for proper completion of work. 8 Supplying /fillingLocal Sand under CC lining as subgrade & filter i/c cost of all material,labour T&P etc required for proper completion of work. 9 LayingL.D.P.E. film i/c cost of scaffolding labour & t&P etc. 10 60 MM. Thick Liningin M20 (1:1.5:3) in bed and side slopeincluding cost of all material,labour T&P etc. and Shuttering required for proper completion of work 11 Making Constraction /Contraction joint in C.C. lining in bed and side slope filling with sealing compound including cost of all material,labour,T&P etc required for proper completion of work 12 CC Lining on Saidgarhi Minor of M.G.C.Project First Stage. 13 Earth work in foundationin dryinordinary soil including ramming and dressing the surface ,including 1.50m. Lift 30m. Lead i/c filling watering excavated earth into the plinth . for proper complition of work. 14 Provide shuttering and centering including all materials and T&P etc for proper complition of work. 15 C.C. work for sleeper cost of material and T & P etc. in 1 : 2: 4includingcost of all material,labour T&P etc. and Shuttering required for proper completion of work. 16 Supplying /fillingLocal Sand under CC lining as subgrade & filter i/c cost of all material,labour T&P etc required for proper completion of work. 17 LayingL.D.P.E. film i/c cost of scaffolding labour & t&P etc. 18 100 MM. Thick Liningin M20 (1:1.5:3) in bed and side slopeincluding cost of all material,labour T&P etc. and Shuttering required for proper completion of work 19 Making Constraction /Contraction joint in C.C. lining in bed and side slope filling with sealing compound including cost of all material,labour,T&P etc required for proper completion of work 20 Construction of Outlets at Right Bank and left Bank of Saidgarhi Minor M.G.C.Project First Stage. 21 Excavation in foundation in ordinary soil (lome,clay or sand) including lift upto 1.50M and lead upto 30M. And including filling watering and ramming of Excavated earth ito trenches or into the space between the building and the side of foundation treches or into the plinth and removal and disposal of surplus earth upto a distence of 30M. from the trenches as ditected by the Engineer-in-Charge. 22 Providing & Laying cement concrete in foundation 1:3:6 stone grit, sand including supply of all material, labour, tools and plants etc 23 Brick work in M-150 Brick 1:4 cement and coarse sand f.m of 2.20 (1 cement :4 C/A) mortar in foundation, plinth level & Super structure including supply of all materials,labour and T&P .required for proper complition 24 Providing and fixing of 150/110 mm Diameter HDPE pressure pipe @6kg/sqm in required length as per site and complete the work all as specified and as directed by Engr-in-Charge. 25 Struck deep cement pointing in 1:2 CM incl cost of material & labour T&P etc. 26 Providing & Laying cement conc in floring or copping of wall etc. in proportion of 1:2:4 using 10-20 mm stone gritincluding cost of all materials, labour, T&p, etc. required for proper completion of work. 27 Painting work on cemented or brick surface one prime coat and one coat of dry distemper in new surface incl. all material & labour etc. 28 Construction of Boundary Pillars of Saidgarhi Minor 29 Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m. 30 Providing & Laying cement concrete in foundation(1:2:4) stone grit, incl fixing of poles etc.sand including supply of all material, labour, tools and plants etc 31 P/F Ordinary centering & shuttering for RCC &CCworks including all labour T&P etc.required for proper completion of work. 32 Providing & Laying R.C.C. M-20 1:1.5:3nominal mix with cement coarse sand and stone agg i/c all cost of material labour T&P etc. 33 Steel Reinforcement for RCC work i/ccost of steel, bending,binding,cutting and placing in proper position etc. required for proper completion of work. 34 Painting of RCC precast boundry pillars of size 250mm x250mm x 900 mm including cost of material & labour and T&P etc. and writing letters including cost of material upto 15 cm height 35 Construciton of Brick Soling for Approach Ramp on Both Side of VRB at Saidgarhi Minor M.G.C.Project First Stage. 36 Earth workin embankment in ordinary soil excavation to be in the of regular pits and earth work in embankment to be in 20 cm. layers. Including ramming and dressinig the surface to the required levels and slopes and also including 1.50 m. lift and 30 m lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank whithin 30 m. distances as directed by Engineer-in-charge. 37 Brick on edge pavement with straight over burnt brick on parties with bricks, laid dry joints filled with fine sand including preparation of base to proper slope, and its ramming, spreading layer of 1 cm. (3/8) depth of local sand over the subgrade and including supply of all materials, labour Tools &plants etc. required for proper completion of the work.. 38 Construction of Brick soling on service road of Saidgarhi Minor M.G.C.Project First Stage. 39 Brick on edge pavement with straight over burnt brick on parties with bricks, laid dry joints filled with fine sand including preparation of base to proper slope, and its ramming, spreading layer of 1 cm. (3/8) depth of local sand over the subgrade and including supply of all materials, labour Tools &plants etc. required for proper completion of the work.. 40 Repair of VRB/DRB of Saidgarhi Minor M.G.C.Project First Stage. 41 Ist class Brick Work in 1:4 CM M-150 Bricks in 1:4 CM including cost of material, Labour, T&P etc required for proper complition of work. 42 Struckdeep cement pointing in 1:2 CM including cost of material, Labour, T&P etc required for proper complition of work. 43 One prime coat and one coat of dry distemper of new work including supply all material labour T&P etc required for proper completion of work 44 Providing and fixing of Hazard maker including cost of all material labour and T&P etc. 45 painting and printing letters upto 30cm height including supply all material labour T&P etc required for proper completion of work at VRB 46 Construciton of Pakka Daula For Protection ofLeft Bank (U/S & D/S of VRB) at Saidgarhi Minor 47 Earth work in foundation in dry ordinary soil (loam clay or sand) including lift up to 1.5 meter and lead up to 30 meter and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by the Engineer-in-charge up to a distance of 30M from the foundation trenches: 48 Providing and layingCement concrete (1:3:6)with cement , coarse sand , and 25mm to 37.25mm stone grit including cost of all material, labour and T&P etc.complete. 49 Ist class Brick Work in 1:4 CM M-150 Brick including cost of all Materials, labour] T&P etc. required Proper completion of work 50 Centering & shuttering for RCC work inetc including cost of all material labour and T&P complete 51 Providing and layingCement concrete (1:2:4)with cement , coarse sand , and 25mm to 10mm stone grit including cost of all material, labour and T&P etc.complete. 52 Sturk Deep Cement pointing in 1:2 CM on suraface including cost of all Materials, labour] T&P etc. required Proper completion of work 53 Distempering Ist coat with oil bound distemper of approved brand and manufacture and of required shade on undercoated wall surface to give an even shade over an including a priming coat cement primer of approved brand and manufacture such as Berger, J&N, Shalimar, Asian Paints after thoroughly brushing the Sqm. surface free from mortar dropping and other foreign matters and also including preparing the surface even with plaster of paris or approved synthetic material and sand papered smooth including cost of all materials. As per UPID SOR chapter no.XIItem no. 05