|
| 1 | Distempering two coatswithIstquality oil bound washable distemper of Asian paints or equivalent of approved shadeand manufacture and of required shade on undecorated wall surfaces to give an even shade over and including a priming coat with distemper primer of approved brand and manufacture after thoroughly brushing the surface free from mortar droppings and other foreign matter and also including preparing the surface even and sand papered smooth priming coat with distemper primerfor all floorsincluding entire carriage of materials through all modes of transportation with in all leads and lifts as per PWD specifications and as per direction of Engineer-in-Charge.The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. |
| 2 | Removing old distemper work , water proofing cement paint and like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete as per HP.PWD., Specificationsincludng carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge.The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government. |
| 3 | Providing and applying Birla white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.including carriage of materials with in all leads & lifts as per direction / satisfaction of the Engineer-in-charge. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government. |
| 4 | Providing wood work in frames of doors, windows, clerestory, windows and other frames wrought, framed and fixed in position in Second class deodar wood including carriage of material in all leads and lifts as perHP.PWD specification 1990 Volume-1 including carriage of materials, labour tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge.The rate including of octory, royalty, malkana,toll tax, sal tax or other taxes imposed by goverment.a) Second Class Deodar Wood |
| 5 | Providing and fixing panelled glazed or panelled and glazed shutters for doors windows and clerestory windows. Including black enamelled iron butt hinges with necessary screws as per HP.PWD specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One), including carriage of all labour equipment and material to various location through all modes of transportation in all leads and lifts, including all iincidential charges.The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government. (35 mm thick)a) 2nd class deodar wood |
| 6 | Providing and fixing wire gauge shuttersusing galvanised M.S. Wire gauge of I.S. designation 85G with wire of dia 0.56 mm for doors windows and clerestory windows. Including black enamelled iron butt hinges with necessary screws as per HP.PWD specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One), including carriage of all labour equipment and material to various location through all modes of transportation in all leads and lifts, including all iincidential charges.The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government. (35 mm thick)a) 2nd class deodar wood |
| 7 | Providing and fixing oxidied M.S. double acting spring hinges 150mm (One hundred fifty milimetre)as per NCL seccolor company specification etc. complete as per HP.PWD.Specifications, approved drawings, designsand entire satisfactionand directions of the Engineer-inchargeincluding carriage of materialswithin all leads and liftsand other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government |
| 8 | Providing and fixing anodized aluminum towerbolts, (Barrel type)anodized transparent or dyedto requiredcolour and shade with bolts and nuts/screws etcetra . complete as per HP.PWD.Specifications, approved drawings, designsand entire satisfaction and directions of the Engineer-in-chargeincluding carriage of materialswithin all leads and liftsand other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Governmentl. 250 x 10mm (twohundredinto tenmillimeter). |
| 9 | Providing and fixing anodized aluminum towerbolts, (Barrel type)anodized transparent or dyedto requiredcolour and shade with bolts and nuts/screws etcetra . complete as per HP.PWD.Specifications, approved drawings, designsand entire satisfaction and directions of the Engineer-in-chargeincluding carriage of materialswithin all leads and liftsand other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Governmentl. 150x 10mm (twohundredinto tenmillimeter). |
| 10 | Providing and fixing aluminum handles anodized transparent or dyed to required colour and shade with necessary screws etcetra completeas per HP.PWD.Specifications, approved drawings, designsand entire satisfactionand directions of the Engineer-inchargeincluding carriage of materialswithin all leads and liftsand other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government 125mm( one hundred twenty five millimeters ) |
| 11 | Providing and fixing aluminum handles anodized transparent or dyed to required colour and shade with necessary screws etcetra completeas per HP.PWD.Specifications, approved drawings, designsand entire satisfactionand directions of the Engineer-inchargeincluding carriage of materialswithin all leads and liftsand other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government 100mm( Hundred millimeters ) |
| 12 | Supplying and fixing glass panes with putty and nails including removal of broken glass |panes etc. 4 mm thick plain Glass within all leads and lifts and other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. |
| 13 | Repairs to plaster of thickness 12 mm to 20 mm in patches of jarea 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the 225 surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in Charge. With cement mortar 1:4 (1 cement : 4 fine sand) within all leads and lifts and other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. |
| 14 | Applying priming coat over new wood and wood based surfaces after and including preparing the surface by thoroughly cleaning oil, grease,dirt and other foreign matter, sand papering and knotting. readymixed paint brushingwood primer pink for all floor including carriage of materialsthrough all modes of transportations with in all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-charge.The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. |
| 15 | Painting two coats (excluding priming costs) on new wood and wood based surfaces with enamel paint white to give an even shade including cleaning the surfaces of all dirt, dust and other foreign matters sand papering and stopping for all floor including carriage of materialsthrough all modes of transportations with in all leads and lifts and as per HP.PWD. specifications of 1990 volume-I and as per direction of Engineer-in-Charge.The rate including of octroi, royalty, Malkana, toll tax, sale tax or other taxes imposed by the Government. |
| 16 | Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade:Old work (two or more coats applied @ 1.67 ltr/10 sqm) complete as per H.P. PWD. Specification 1990 (One thousand Nine hundred Ninety) Volume-1 (One), including carriage of all labour, equipments and materials to various location through all modes of transportation in all leads lifts and all iincidential charges.The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government. |
| 17 | Finishing with Deluxe Multi Surface paint system for interiors and exteriors using Primer as per manufactures specifications: Painting steel work with deluxe Multi surface Paint of required shade, Two or more coat applied @ 0.90 ltr/10 sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and maufacture,per HP.PWD., Specificationsincludng carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-Charge.The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government. |
| 18 | Providingform work with steel plates 3.15mm(threepoint one fivemillimeters)thick welded with angle iron in frame 30x30x5mm(thirty into thirty into five millimeters),so as to give a fair finishincluding centering ,shuttering, strutting andpropping etceterawith wooden battens and ballies, height of propping and centering in all heights belowsupporting floor to ceiling and removal of the same for in situ reinforced concrete and plain concrete work in vertical surfaces such as walls(any thickness) partitions etc. including attached pillasters buttresses, plinth and string cources and the likeetc.as per HP.PWD.Specifications, approved drawings, designsand entire satisfactionand directions of the Engineer-in-charge including carriage of materialswithin all leads and liftsand other incidentals. The rate including of octroi, royalty, Malkana, toll tax, sale tax orother taxesimposed by the Government |
| 19 | Providing and laying plain concrete 1:3:6 (One cement isto three sand isto six graded crushed hard stone agreegate ) mechanically mixed, vibrated and curing complete includig form work in open foundation as per drawing and technical specification clause 802, 803, 1202 and 1203(Eight hundred two, eight hundred three, one thousand two hundred two and ond thousand two hundred three) including carriage of all labour, equipments and materials to various location through all modes of transportation in all leads lifts and all incidental charges. |
| 20 | Kota stone slab flooring 20mm (average) thick base of cement mortor 1:4 (1 cement:4 sand) laid over and jointed ;with grey cement slurry mixed with pigment to match the shade of the slab inlcuding rubbing and polishing complete including carriage of materials within all leads, lifts and other incidentals. The rate including Royality, Malkhana, GST, Octroi, Toll Tax Sales tax or any other taxes imposed by the Government. 25mm thick |