|
| 1 | BESS |
| 2 | Containerized Battery Storage System with BMS, Fire firefighting and protection system, with necessary auxiliary system etc. |
| 3 | Balance of System |
| 4 | Bi-directional PCS/Battery Inverter (if standalone) |
| 5 | Inverter Duty Transformer |
| 6 | Switchgear |
| 7 | Other Balance of System (BoS) Equipment as specified in Tentative BoQ attached as Annexure-B of Technical Specification attached as annexure-2.1 of Contract Document |
| 8 | Power evacuation & Bay extension |
| 9 | Power Duty Transformer |
| 10 | Other Power evacuation & Bay extension Equipment as specified in Tentative BoQ attached as Annexure-B of Technical Specification attached as annexure-2.1 of Contract Document |
| 11 | Control and Instrumentation |
| 12 | SCADA with EMS |
| 13 | Other Power Control and Instrumentation Equipment as specified in Tentative BoQ attached as Annexure-B of Technical Specification attached as annexure-2.1 of Contract Document. |
| 14 | Auxiliary system |
| 15 | All Auxiliary system equipment (transformer, lighting, UPS etc.) as specified in Tentative BoQ attached as Annexure-B of Technical Specification attached as annexure-2.1 of Contract Document. |
| 16 | Miscellaneous items |
| 17 | All Miscellaneous items / equipment |
| 18 | Mandatory Spares |
| 19 | Mandatory Spares as per list attached as Annexure-D of Technical Specification attached as annexure-2.1 of Contract Document (attached herewith for ready reference) |
| 20 | Civil ServicesNote: Bidder to refer ITB document & Instructions sheet attached herewith. |
| 21 | Control Building at Plant |
| 22 | Control Building at Grid Substation |
| 23 | Inverter control station |
| 24 | Road and Drains |
| 25 | Land Refilling (Land Development) |
| 26 | All other Civil and Auxilliary works as specified in Tentative BoQ attached as Annexure-B of Technical Specification attached as annexure-2.1 of Contract Document. |
| 27 | Installation and Commissioning ServicesNote: Bidder to refer ITB document & Instructions sheet attached herewith. |
| 28 | Total Price for Installation and Commissiong Services of Equipments as specified in Technical Specification attached as Annexure-2.1 of Contract Document |
| 29 | Transportation & InsuranceNote: 1. Bidders are required to indicate the above cost including the cost of Port handling, Port/Custom clearance, Port charges, reconciliation with customs authorities.2. Bidders to refer ITB document & Instructions sheet attached herewith. |
| 30 | Total forLocal Transportation and Inland Transit Insurance and Other Local Costs Incidental to Delivery of Plant & Equipment |
| 31 | Operating Fees |
| 32 | Yearly Operating Fees: Year- 1Note: Bidder to Quote the Yearly Operating Fees atleast 5% (Five Percent) less than the Yearly Operating Fees for Next/ Subsequent Operating Year. |
| 33 | Yearly Operating Fees: Year- 2Note: Bidder to Quote the Yearly Operating Fees atleast 5% (Five Percent) less than the Yearly Operating Fees for Next/ Subsequent Operating Year. |
| 34 | Yearly Operating Fees: Year- 3Note: Bidder to Quote the Yearly Operating Fees atleast 5% (Five Percent) less than the Yearly Operating Fees for Next/ Subsequent Operating Year. |
| 35 | Yearly Operating Fees: Year- 4Note: Bidder to Quote the Yearly Operating Fees atleast 5% (Five Percent) less than the Yearly Operating Fees for Next/ Subsequent Operating Year. |
| 36 | Yearly Operating Fees: Year- 5Note: Bidder to Quote the Yearly Operating Fees atleast 5% (Five Percent) less than the Yearly Operating Fees for Next/ Subsequent Operating Year. |
| 37 | Yearly Operating Fees: Year- 6Note: Bidder to Quote the Yearly Operating Fees atleast 5% (Five Percent) less than the Yearly Operating Fees for Next/ Subsequent Operating Year. |
| 38 | Yearly Operating Fees: Year- 7Note: Bidder to Quote the Yearly Operating Fees atleast 5% (Five Percent) less than the Yearly Operating Fees for Next/ Subsequent Operating Year. |
| 39 | Yearly Operating Fees: Year- 8Note: Bidder to Quote the Yearly Operating Fees atleast 5% (Five Percent) less than the Yearly Operating Fees for Next/ Subsequent Operating Year. |
| 40 | Yearly Operating Fees: Year- 9Note: Bidder to Quote the Yearly Operating Fees atleast 5% (Five Percent) less than the Yearly Operating Fees for Next/ Subsequent Operating Year. |
| 41 | Yearly Operating Fees: Year- 10Note: Bidder to Quote the Yearly Operating Fees atleast 5% (Five Percent) less than the Yearly Operating Fees for Next/ Subsequent Operating Year. |
| 42 | Yearly Operating Fees: Year- 11Note: Bidder to Quote the Yearly Operating Fees atleast 5% (Five Percent) less than the Yearly Operating Fees for Next/ Subsequent Operating Year. |
| 43 | Yearly Operating Fees: Year- 12 |