| 1 | Providing and Laying of LDPE Film on footing box including cost of all materials, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. |
| 2 | Earth work in Cutting embankment in ordinary soil , earth work in embankments to be in 20 cm layers, includingramming and dressing the surface to the requires levels, slopes and also including 1.50 metre lift and theearth from cutting to be used in making embankment or to be deposited on banks as directed by Engineer- in- Charge. |
| 3 | Filling expansion Joint with joint filler board20 mmthick as per direction of engineer in charge . |
| 4 | Excavation in foundation in dry ordinary soil(Loam clay or Sand) including lift up to 1.5 m and lead up to 30m and including back filling, watering, and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the engineer in charge up to 30 m distance. |
| 5 | Cement pointing on brick work with cement mortar of mix (1cement:2Fine sand) cm including cost of labour materials T&P etc proper completion of work etc. required for proper completion of work as per direction of Engineer-in-Charge. |
| 6 | Finishing walls (Two coat ) with exterior emulsionpaint (Apex) of approved brand and manufacture and of required shade on undecorated wall surface to give even shade@ 1.25 litre/10sqm including one coat of primer applied @ 0.75 litre/sqm, including cost of all materials, labour T&P etc. complete required foe proper completion of work. |
| 7 | Providing and fixing of 75mm diaPVC pipe 6 kg/Cm2 etc. required for proper completion of work as per direction of Engineer-in-Charge. |
| 8 | Earth work in Dowla making and filling in ordinary soil excavation /filling to be in form of standard profile to be in 20 cm layers including ramming dressing the surface to the required levels and slops and also including 1.5 mtr lift and up to 1Km lead including borrowed earth from private land as directed by Engineer In Chrage. |
| 9 | S/F tar felt on bed blockas per direction of engineer in charge . |
| 10 | Providing and fixing of 110mm diaPVC pipe 6 kg/Cm2 etc. required for proper completion of work as per direction of Engineer-in-Charge. |
| 11 | Dry straight overburnt Bricks on edge pitching in sand including preparation of subgrade and filling joints with local sand including cost of sand. |
| 12 | Providing and fixing of 125 mm diaPVC pipe 6 kg/Cm2 etc. required for proper completion of work as per direction of Engineer-in-Charge. |
| 13 | Providing and fixing of 160 mm diaPVC pipe 6 kg/Cm2 etc. required for proper completion of work as per direction of Engineer-in-Charge. |
| 14 | Centring and shuttering for CC work including rent of shuttering material, labour and T&P required for proper completion of work etc. |
| 15 | Providing and fixing of 200 mm diaPVC pipe 6 kg/Cm2 etc. required for proper completion of work as per direction of Engineer-in-Charge. |
| 16 | Centring and shuttering for RCC work including rent of shuttering material, labour and T&P required for proper completion of work for slab, lintels, sunshade,columns, & wall. |
| 17 | S/L Fine sand inside slopes & bed before P.C.C. including all cost of material , Labour ,T&P etc. complete of work |
| 18 | Providing and fixing precast reinforced cement concrete 1:1.5:3 (1cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) kilometre stone as per standard design, including finishing smooth in 1:3 cement mortar (1 cement : 3 fine sand) but excluding the cost of earth work, concrete in foundation, painting and lettering etc. which shall be paid for separately. |
| 19 | S/Laying boulder in random rubble (1:4) Cement Mortar in Slope and bed including cost of all labour and T&P etc. Complete as per instruction of Engineer-in-charge. |
| 20 | Brickwork in 1:4 CM( 1cement:4 Coarse sand) mortar with Common burnt clay(non modular) brick of class designation 150 including cost of all material, labour and T&P etc. required for proper completion of work as per direction of Engineer-in-Charge. |
| 21 | Providing and Laying Cement concrete in 1:3:6(1 Cement:3 Coarse sand:6 graded stone Aggregate 20 mm nominal size)including Supply of all material, labour , andT&P etc required for Proper completion of work . |
| 22 | Providing and Laying Cement concrete in 1:2:4(1 Cement:2 Coarse sand:4 graded stone Aggregate 20 mm nominal size)including Supply of all material, labour , andT&P etc required for Proper completion of work . |
| 23 | Providing and Laying Cement concrete in 1:1.5:3(1 Cement:1.5 Coarse sand:3 graded stone Aggregate 20 mm nominal size)including Supply of all material, labour , andT&P etc required for Proper completion of work . |
| 24 | Providing and Layingreinforced Cement concrete in 1:1.5:3(1 Cement:1.5 Coarse sand:3 graded stone Aggregate 20 mm nominal size)including Supply of all material, labour , andT&P etc required for Proper completion of work . |
| 25 | Providing and laying (M 25)R.C.C 1:1:2 with coarse sand and aggregate of size 10 to 20 mm including mechanical mixing and all cost of material, labour and T&P etc. but excluding cost of steel reinforcement. |
| 26 | Steel reinforcement with bending, binding, cutting and placing of reinforcement including cost of binding wire with all cost of material, labour and T&P etc. for completion of work. |