Tender For Providing Sop To Different Bsnlg Bts/Towerby Providing Lt Extension From Various S/Stn. (25Kva Nagasaring, 25Kva Chunang (Anati Dhar), 25Kva Ramni, 100Kva Kanai) In Electrical Section Karcham And Tapri, Under Electrical Sub-Division, Hpsebl, Ta
Tender Overview
Project Description
Tender for providing SOP to different BSNLG BTS/Towerby providing LT extension from Various S/Stn. (25kVA Nagasaring, 25kVA Chunang (Anati Dhar), 25kVA Ramni, 100kVA Kanai) in Electrical Section Karcham and Tapri, under Electrical Sub-Division, HPSEBL, Tapri.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 18-Feb-2025 | time extension | Date | 21-Feb-2025 |
BOQ
| Sl. No. | Item Description |
| 1 | 25kVA Nagasaring |
| 2 | ERRECTION OF L.T LINE ON 9Mtr. Long S.T pole. |
| 3 | (i) Digging of pit, Laying of RCC muff,Drilling of holes in poles.Erection of pole,Erection of shackle insulator, filing of pit and ramming, Painting of pole. (Complete in all respect). |
| 4 | ERRECTION OF STAY SET |
| 5 | Digging of pit, fixing of stay rod, filling of pit, Nozzeling & Tighting.) Complete in all respect. |
| 6 | ERRECTION OF EARTHING SET |
| 7 | Digging of pit, fixing of GI wire to the earthing system, Filling of pit. |
| 8 | SAGGING OF ACSR CONDUCTOR 6/1/2.59mm (Single wire). |
| 9 | Laying of conductor, stringing & sagging, Binding with insulator (only). |
| 10 | Sagging of G.I Wire for earth wire. |
| 11 | MANNUAL CARRIAGE OF L.T LINE MATERIAL CONSIDERING AVERAGE DISTANCE 2.000 K.M. |
| 12 | MATERIAL TO BE SUPPLIED BY CONTRACTOR (Subject to the non-availability of material at Divisional Store). |
| 13 | Prov. RCC Muffs 2Mtr. |
| 14 | Prov. LT stay set. |
| 15 | Prov .Shakle Insulator (16KN) |
| 16 | Prov .D-Iron (U-Clamps) |
| 17 | Prov. Nuts & bolts. |
| 18 | Prov. Aluminium paint. |
| 19 | Prov. Stay clamp |
| 20 | Providing Egg Insulator. |
| 21 | Prov. stay Wire (7/3.15mm) |
| 22 | Prov. Earthing Set Complete. |
| 23 | Prov. ACSR 6/1/2.59mm2 (30mm2) |
| 24 | 25kVA Chunang (Anati Dhar) |
| 25 | ERRECTION OF L.T LINE ON 9Mtr. Long S.T pole. |
| 26 | (i) Digging of pit, Laying of RCC muff,Drilling of holes in poles.Erection of pole,Erection of shackle insulator, filing of pit and ramming, Painting of pole. (Complete in all respect). |
| 27 | ERRECTION OF STAY SET |
| 28 | Digging of pit, fixing of stay rod, filling of pit, Nozzeling & Tighting.) Complete in all respect. |
| 29 | ERRECTION OF EARTHING SET |
| 30 | Digging of pit, fixing of GI wire to the earthing system, Filling of pit. |
| 31 | SAGGING OF ACSR CONDUCTOR 6/1/2.59mm (Single wire). |
| 32 | Laying of conductor, stringing & sagging, Binding with insulator (only). |
| 33 | Sagging of G.I Wire for earth wire. |
| 34 | MANNUAL CARRIAGE OF L.T LINE MATERIAL CONSIDERING AVERAGE DISTANCE 0.460 K.M. |
| 35 | MATERIAL TO BE SUPPLIED BY CONTRACTOR (Subject to the non-availability of material at Divisional Store). |
| 36 | Prov. RCC Muffs 2Mtr. |
| 37 | Prov. LT stay set. |
| 38 | Prov .Shakle Insulator (16KN) |
| 39 | Prov .D-Iron (U-Clamps) |
| 40 | Prov. Nuts & bolts. |
| 41 | Prov. Aluminium paint. |
| 42 | Prov. Stay clamp |
| 43 | Providing Egg Insulator. |
| 44 | Prov. stay Wire (7/3.15mm) |
| 45 | Prov. Earthing Set Complete. |
| 46 | Prov. ACSR 6/1/2.59mm2 (30mm2) |
| 47 | 25kVA Ramni |
| 48 | ERRECTION OF L.T LINE ON 9Mtr. Long S.T pole. |
| 49 | (i) Digging of pit, Laying of RCC muff,Drilling of holes in poles.Erection of pole,Erection of shackle insulator, filing of pit and ramming, Painting of pole. (Complete in all respect). |
| 50 | ERRECTION OF STAY SET |
| 51 | Digging of pit, fixing of stay rod, filling of pit, Nozzeling & Tighting.) Complete in all respect. |
| 52 | ERRECTION OF EARTHING SET |
| 53 | Digging of pit, fixing of GI wire to the earthing system, Filling of pit. |
| 54 | SAGGING OF ACSR CONDUCTOR 6/1/2.59mm (Single wire). |
| 55 | Laying of conductor, stringing & sagging, Binding with insulator (only). |
| 56 | Sagging of G.I Wire for earth wire. |
| 57 | MANNUAL CARRIAGE OF L.T LINE MATERIAL CONSIDERING AVERAGE DISTANCE 2.100 K.M. |
| 58 | MATERIAL TO BE SUPPLIED BY CONTRACTOR (Subject to the non-availability of material at Divisional Store). |
| 59 | Prov. RCC Muffs 2Mtr. |
| 60 | Prov. LT stay set. |
| 61 | Prov .Shakle Insulator (16KN) |
| 62 | Prov .D-Iron (U-Clamps) |
| 63 | Prov. Nuts & bolts. |
| 64 | Prov. Aluminium paint. |
| 65 | Prov. Stay clamp |
| 66 | Providing Egg Insulator. |
| 67 | Prov. stay Wire (7/3.15mm) |
| 68 | Prov. Earthing Set Complete. |
| 69 | Prov. ACSR 6/1/2.59mm2 (30mm2) |
| 70 | 100kVA Kanai |
| 71 | ERRECTION OF L.T LINE ON 9Mtr. Long S.T pole. |
| 72 | (i) Digging of pit, Laying of RCC muff,Drilling of holes in poles.Erection of pole,Erection of shackle insulator, filing of pit and ramming, Painting of pole. (Complete in all respect). |
| 73 | ERRECTION OF STAY SET |
| 74 | Digging of pit, fixing of stay rod, filling of pit, Nozzeling & Tighting.) Complete in all respect. |
| 75 | ERRECTION OF EARTHING SET |
| 76 | Digging of pit, fixing of GI wire to the earthing system, Filling of pit. |
| 77 | SAGGING OF ACSR CONDUCTOR 6/1/2.59mm (Single wire). |
| 78 | Laying of conductor, stringing & sagging, Binding with insulator (only). |
| 79 | Sagging of G.I Wire for earth wire. |
| 80 | MANNUAL CARRIAGE OF L.T LINE MATERIAL CONSIDERING AVERAGE DISTANCE 0.300 K.M. |
| 81 | MATERIAL TO BE SUPPLIED BY CONTRACTOR (Subject to the non-availability of material at Divisional Store). |
| 82 | Prov. RCC Muffs 2Mtr. |
| 83 | Prov. LT stay set. |
| 84 | Prov .Shakle Insulator (16KN) |
| 85 | Prov .D-Iron (U-Clamps) |
| 86 | Prov. Nuts & bolts. |
| 87 | Prov. Aluminium paint. |
| 88 | Prov. Stay clamp |
| 89 | Providing Egg Insulator. |
| 90 | Prov. stay Wire (7/3.15mm) |
| 91 | Prov. Earthing Set Complete. |
| 92 | Prov. ACSR 6/1/2.59mm2 (30mm2) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender