}

Tender For Construction Of V.R.B. - Reconstruction Work Of Bridge At Km 10.900 Of Parauri Drain. Reconstruction Work Of Bridge At Km 10.600 Of Parauri Drain. Reconstruction Work Of Bridge At Km 9.100 Of Parauri Drain. Reconstruction Work Of Bridge At Km 7, khurja-Uttar Pradesh

Irrigation Department has published Tender For Construction Of V.R.B. - Reconstruction Work Of Bridge At Km 10.900 Of Parauri Drain. Reconstruction Work Of Bridge At Km 10.600 Of Parauri Drain. Reconstruction Work Of Bridge At Km 9.100 Of Parauri Drain. Reconstruction Work Of Bridge At Km 7. Submission Date for this Tender is 12-02-2025. Bridge Work Tenders in khurja Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

47614258
Tender For Construction Of V.R.B. - Reconstruction Work Of Bridge At Km 10.900 Of Parauri Drain. Reconstruction Work Of Bridge At Km 10.600 Of Parauri Drain. Reconstruction Work Of Bridge At Km 9.100 Of Parauri Drain. Reconstruction Work Of Bridge At Km 7
Tender
Indian
Uttar Pradesh
Khurja
12-02-2025

Tender Details

Construction Of V.R.B. - Reconstruction work of bridge at Km 10.900 of Parauri drain.Reconstruction work of bridge at Km 10.600 of Parauri drain.Reconstruction work of bridge at Km 9.100 of Parauri drain.Reconstruction work of bridge at Km 7.780 of Parauri drain.Reconstruction work of bridge at Km 14.500 of Parauri drain.Reconstruction work of bridge at Km 13.200 of Parauri drain. - Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundationincluding dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2 Providing and laying in position Cement Concrete of 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centering and shuttering. 3 Providing and laying in position Reinforcement Cement Concrete of 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) excluding the cost of centering and shuttering. 4 Providing and laying in position Reinforcement Cement Concrete of 1:1.5:3 (1 Cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) excluding the cost of centering and shuttering. 5 Providing and laying C.C 1:1.5:3 with coarse sand and crushed stone aggregate with mechanical mixing including all cost of material, labour and T&P. 6 Centering and shuttering for C.C. work including strutting, propping etc. and removal of form work for Foundations, footings, base etc. Below bed. 7 Centering and shuttering for C.C. work including strutting, propping etc. and removal of form work for piers, abutments, pillars, above bed. 8 Centering and shuttering for R.C.C. Workincluding strutting, propping etc. and removal of form work. 9 Supplying Laying of one layer of Tar felt I.S.I marked at the junction of wall and roof or any place i/c necessary overlap giving a coat of approved mastic paint below the tar felt i/c cost of all material ,labour and T&P. Etc complete. 10 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing position and binding all complete upto plinth level.Thermo-Mechanically Treated (TMT)bars of grade Fe-500D or more 11 Supplying and filling EC bags with earth filled and placing In position with in 60 mtr distance for making Bundh includingall cost of material, labour and T&P. Etc. Complete. 12 Earth work in excavation by mechanical /manual including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in charge. 13 Filling available excavated earth in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all Lift etc complete. 14 S/F 75mm dia upvc pipe(working pressure 4kg/ sqm) single socketed pipe 15 Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer’s specifications including appropriate priming coat, preparation of surface, etc. complete. On Concrete work. 16 Dewatering by 10 H.P.pup set i/c all complete the work.

Key Value

Document Fees
INR 1204 /-
Tender Value
INR 35 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail