| 1 | Earth work in excavation in foundation trenches in hard soil (vide classification of soil item - A+B) and disposal of excavated earth as obtained to a distance up to 50M including all lifts with leveling, ramming the foundation trenches, removing roots of trees, shrubs all complete as perbuilding specification and direction of E/I.B.C.D. S.O.R. Item No. 5.1.1 + 5.1.2 |
| 2 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labours, royaly and taxes all complete as per building specification and direction of E/l.B.C.D. S.O.R. Item No. 5.1.10 |
| 3 | Providing designation 75 B brick work in C.M. (1:6) in superstructure with approved quality of clean coarse sand of F.M. 2 to 2.5 including, providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth curing, taxes and royalty all complete as per building specification and direction of E/I. |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) B.C.D. S.O.R. Item No. 5.3.1.2 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) B.C.D. S.O.R. Item No. 5.3.9.1 |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size)B.C.D. S.O.R. Item No. 5.3.10 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete. B.C.D. S.O.R. Item No. 5.3.17.1 |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts. B.C.D. S.O.R. Item No. 5.3.17.6 |
| 9 | Providing TMT steel reinforcement 10mm,dia bars as per approved design and drawing excluding carriage of M.S bar to work site, cutting, bending end binding with annealed wire with cost of wire removal of rust placing the rods in position all complete as per building specification and direction of E/I. |
| 10 | Supplying, fitting, and fixing M.S. Grill made of 20X6mm M.S. Flate as per approved design and drawing, properly fabricated with joints continuous fillet welded and finished smooth, carriage of grill to work site, hoisting as per building specification and direction of E/I. (where materials is not supplied by the deptt.) |
| 11 | Supplying, fitting and fixing M.S. grill gate with M.S. grill made of 20X6mm M.S. flats or 16mm M.S. square bars fitted on 25X25X6mm M.S. Angle frame of size 60X60X6mm. Including cost of fabrication, providing necessary locking arrangement with haskal and domny duly fixed in P.C.C. (1:2:4) blocks of required size applying a priming red lead paint over steel work, taxes all complete as per drawing specification and direction of E/I.B.C.D. S.O.R. Item No. 5.5.30 |
| 12 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes, royalty all complete as per building specification and direction of E/I.B.C.D. S.O.R. Item No. 5.6.3 |
| 13 | Providing 12mm cement plaster (1:6) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/I. |
| 14 | Providing two coats of snowcem of approved shade and make over a coat of cement primer on new surface including preparing the plastered surface smooth with sand paper, soaping, curing and taxes all complete as per building specification and direcition of E/l. |
| 15 | Providing two coats of painting with ready mixed paint over a coat of primer of red lead paint over steel surface -do- -do- all complete job. |
| 16 | Cement (Lead - 16Km) |
| 17 | Sand (Lead - 10Km) |
| 18 | Stone chips (Lead - 38Km) |
| 19 | Steel(Lead - 16Km) |
| 20 | Bricks (Lead - 15Km) |
| 21 | Goods & Services Tax (G.S.T.) - 18% |
| 22 | Labour Cess - 1% |