| 1 | Excavation foundation on / pipe trenches inearth, soils of all type, and gravel and soft murum, including remove the excavated material uptp a distance of 50m and lifts as below stacking and spreading directed normal dewatering preparing the bed for foundation and exculding back filling etc. complete (Lift 0 to 1.5 M)MJP DSR 2021/22, I.No : 1 |
| 2 | Excavation for foundation / pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material upto a distance of 50 M beyond the area and lifts as below, stacking and spreading as directed by Engineer-in-charge. normal dewatreing, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-3/259) Lift 0 to 1 .5 M MJP DSR 2021/22, I.No : 3 |
| 3 | Excavation for foundation / pipe trenches in hard rock and concrete road by chiselling, wedging, line drilling, by mechanical means or by all means other than blasting including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the area and lifts as below, stacking as directed by Engineer-in-charge, normal dewatering, excluding backfilling, etc. complete by all means. (Bd-A-1/259) Lift 0 to 7 Page 1 of 381 1.50 M MJP SSR, I.No : 6 |
| 4 | Removing existing pipe line of the following pipe size stone ware pipes / R.C.C. pipes excluding cost of necessary excavation and refilling of the trenches, breaking the joints, lifting the pipes and stacking to the place as directed by the Engineer - in - charge with all leads and lifts including cleaning the surfaces etc. complete 2 Removing / Uprooting of following Type pipe MJP DSR 2021/22 ( As per rate analysis) |
| 5 | Supplying ISI StandardSalt Glazed SWG pipe Including Transportation Loading Unloading etc Compl. As per market rateanalysis200 mm Dia |
| 6 | 250mm Dia |
| 7 | 300mm Dia |
| 8 | Lowering , laying and jointing salt Glazed pipe including fitting such as bends, tees single junction, double junctions laying jointing etc comp. as per Market rate analysis 200 MMdia |
| 9 | 250mm Dia |
| 10 | 300mm Dia |
| 11 | Providing and constructing on drainage line B.B. masonary circular manhole, concentric cone 0.90 mtrs. dia. at bottom and 0.5 mtrs. dia at top and upto a depth of 1.50 mtrs. with 23 cm thick brick work in C.M. 1 : 6 prop, with 12 mm thick.Cement plaster in 1:4, with smooth rendering, 1:2:4 coping and fixing approved make and quality S.F.R.C. Frame and cover of 56 cm dia etc. including all necessary excavation & 1:5:10 bed c.c.etc all complete as directed by Engineer - in - charge.(Rebate for every decrease in depth of 30cm or part there of Rs.2232/- per 30cm) MJP DSR 2021/22, as per Rate analysis Item No:17 |
| 12 | Providing & Supplying steel fiber reinforced concrete (S.F.R.C.) frame & cover heavy duty/medium duty of rectangular or circular in shape of approved make including loading unloading, transportation, all taxes etc. complete as directed by Engineer- in - charge. (20tonnes Capacity)MJP DSR 2021/22 ( As per rate analysis) |
| 13 | Providing and constructing Brick Masonry Inspection Chamber 90cm x 45cm x 90cm including 1:4:8 cement concrete foundation 1:2:4 cement concrete channelshalf round G.S.W.pipes, Brick Masonry, plastering from inside and with frame fixed in cement concrete with R.C.C. Cover medium duty 140 kg with frame etc complete.PWD DSR 2021/22, I.No : 42.13 |
| 14 | Repairing and Reconstructing/RaisingB.B. masonry circular manhole of 1.0m dia.without conical shape excluding excavation, brick masonry in CM 1:4 proportion 23 cm thick, plastering with smooth finish in CM 1:2 proportion, fixing S.F.R.C. frame and co ver ( Excluding cost of SFRC Cover)including cost of all materials and labour, etc. complete.MJP DSR 2021/22 ( As per rate analysis) |
| 15 | Desilitng The supply well, Intake well / Head works, Sewerage works, Sump of water supply, etc, in wet or dry condition including lifts upto 9m and lead upto 150m as required beyond the work site , stacking , spreading, including necessary guarding, etc, comp, as directed by engineer inchargeMJP DSR 2021/22,I.No : 13 |
| 16 | Manualy clearing the chockes from under ground drainage line including Inspection chambers with the help of required tools for propre functioning line chamber to chamber etc. complete.PWD DSR 2021/22, I.No : 46.54 |
| 17 | Refilling the trenches available excavated with soft material. First over pipe line and then hard material in 15 Cm layers with all leads and lifts including consolidation, surcharging, etc. complete MJP DSR 2021/22, I.No : 15 |
| 18 | Transportation for surplus material from work site to any disposal place as directed by engineer in charge with a lead of3.00 km including and stacking etc . Complete . MJP DSR 2021/22 ( As per rate analysis) |