| 1 | Repairs to 50 H.PUP C/F Pump |
| 2 | Dismentalling of Centrifugal motor pump set from pump house. |
| 3 | Providing & fixing pump shaft (EN8) |
| 4 | Providing & fixing shaft sleeve. SS |
| 5 | Providing & fixing lantering gun metal. |
| 6 | Providing & fixing stufling box Bush C.I. |
| 7 | Providing & fixing coupling spacer C.I. |
| 8 | Providing & fixing couplingstar rubber |
| 9 | Providing & fixing water deflector. |
| 10 | Providing & fixing bearing lock nut. |
| 11 | Providing & fixing grafite , rubber packing. O ring etc. |
| 12 | Removing bearing & rematching the housing to the brg. Size. |
| 13 | Assembling the pump with above parts. |
| 14 | Transportation & loading \" unloading the pump set from work site to work shop @ Single @ return. |
| 15 | Providing & fixing Impeller (CI) |
| 16 | Providing & fixing Impeller nut ( G.M.) |
| 17 | Test & trial of the set @ site as per requirement. |
| 18 | Replacement of motor ball bearing & greasing etc. |
| 19 | Repairs to 60 H.PUP C/F Pump |
| 20 | Dismentalling of Centrifugal motor pump set from pump house. |
| 21 | Providing & fixing pump shaft (EN8) |
| 22 | Providing & fixing shaft sleeve. SS |
| 23 | Providing & fixing lantering gun metal. |
| 24 | Providing & fixing stufling box Bush C.I. |
| 25 | Providing & fixing coupling spacer C.I. |
| 26 | Providing & fixing couplingstar rubber |
| 27 | Providing & fixing water deflector. |
| 28 | Providing & fixing bearing lock nut. |
| 29 | Providing & fixing grafite , rubber packing. O ring etc. |
| 30 | Removing bearing & rematching the housing to the brg. Size. |
| 31 | Assembling the pump with above parts. |
| 32 | Transportation & loading \" unloading the pump set from work site to work shop @ Single @ return. |
| 33 | Providing & fixing Impeller (CI) |
| 34 | Providing & fixing Impeller nut ( G.M.) |
| 35 | Test & trial of the set @ site as per requirement. |
| 36 | Replacement of motor ball bearing & greasing etc. |
| 37 | Repairs to 100 H.PUP C/F Pump |
| 38 | Dismentalling of Centrifugal motor pump set from pump house. |
| 39 | Providing & fixing pump shaft (EN8) |
| 40 | Providing & fixing shaft sleeve. SS |
| 41 | Providing & fixing lantering gun metal. |
| 42 | Providing & fixing stufling box Bush C.I. |
| 43 | Providing & fixing coupling spacer C.I. |
| 44 | Providing & fixing couplingstar rubber |
| 45 | Providing & fixing water deflector. |
| 46 | Providing & fixing bearing lock nut. |
| 47 | Providing & fixing grafite , rubber packing. O ring etc. |
| 48 | Removing bearing & rematching the housing to the brg. Size. |
| 49 | Assembling the pump with above parts. |
| 50 | Transportation & loading \" unloading the pump set from work site to work shop @ Single @ return. |
| 51 | Providing & fixing Impeller (CI) |
| 52 | Providing & fixing Impeller nut ( G.M.) |
| 53 | Test & trial of the set @ site as per requirement. |
| 54 | Replacement of motor ball bearing & greasing etc. |
| 55 | Repairs to 100 H.PC/FMotor |
| 56 | Rewinding of induction motor including labour & material charges. |
| 57 | Motor ball bearing Cleaning & greasing etc. |
| 58 | Dismelting & fitting of electrical motor from pump house. |
| 59 | Nut bolt stud for motor. |
| 60 | Cleaning & overhauling greasing , warnishing the motor & painting. |
| 61 | Replacement Damaged turminal connection plate & lugs. |
| 62 | Test & trial of the set @ site as per requirement. |
| 63 | Repairs to 60 H.PC/FMotor |
| 64 | Rewinding of induction motor including labour & material charges. |
| 65 | Motor ball bearing Cleaning & greasing etc. |
| 66 | Dismelting & fitting of electrical motor from pump house. |
| 67 | Nut bolt stud for motor. |
| 68 | Cleaning & overhauling greasing , warnishing the motor & painting. |
| 69 | Replacement Damaged turminal connection plate & lugs. |
| 70 | Test & trial of the set @ site as per requirement. |
| 71 | Repairs to 50 H.PC/FMotor |
| 72 | Rewinding of induction motor including labour & material charges. |
| 73 | Motor ball bearing Cleaning & greasing etc. |
| 74 | Dismelting & fitting of electrical motor from pump house. |
| 75 | Nut bolt stud for motor. |
| 76 | Cleaning & overhauling greasing , warnishing the motor & painting. |
| 77 | Replacement Damaged turminal connection plate & lugs. |
| 78 | Test & trial of the set @ site as per requirement. |
| 79 | Overhaulingto 100 H.PC/FMotor |
| 80 | Dismelting & fitting of electrical motor from pump house. |
| 81 | Dismetling of Coupling & Motor |
| 82 | Motor Water Wash |
| 83 | Washing of Stator & Roter |
| 84 | Pre Heating (Oven) of Stator & Roter |
| 85 | Gelcoting, Painting Bearing Cleaning and Grising |
| 86 | Test & trial of the set @ site as per requirement. |
| 87 | Overhaulingto 60 H.PC/FMotor |
| 88 | Dismelting & fitting of electrical motor from pump house. |
| 89 | Dismetling of Coupling & Motor |
| 90 | Motor Water Wash |
| 91 | Washing of Stator & Roter |
| 92 | Pre Heating (Oven) of Stator & Roter |
| 93 | Gelcoting, Painting Bearing Cleaning and Grising |
| 94 | Test & trial of the set @ site as per requirement. |
| 95 | Overhauling to 50 H.PC/FMotor |
| 96 | Dismelting & fitting of electrical motor from pump house. |
| 97 | Dismetling of Coupling & Motor |
| 98 | Motor Water Wash |
| 99 | Washing of Stator & Roter |
| 100 | Pre Heating (Oven) of Stator & Roter |
| 101 | Gelcoting, Painting Bearing Cleaning and Grising |
| 102 | Test & trial of the set @ site as per requirement. |
| 103 | Overhauling, to 7.5 H.PC/FMotor |
| 104 | Rewinding of 5 HP Motor |
| 105 | Rewinding of 7.5 HP Motor |
| 106 | Repairs of PUMP of 5 H.P. motor |
| 107 | Repairs of PUMP of 7.5 H.P. motor |
| 108 | Overhauling, to 5 H.PC/FMotor |
| 109 | Repairs Reconditioning of 50 HP ATS |
| 110 | Dismentling of 50 HP ATS |
| 111 | Replacement of CT Oprated Relay Assembly 50 HP |
| 112 | Rewinding of Auto Transformer50 HP |
| 113 | Providing & Fixing terminal plate for Auto Transformer 50 HP |
| 114 | Providing & Fixing Single Phase Preventor for Auto Starter |
| 115 | Replacement of Timer for ATS Starter |
| 116 | Replacement of auxillary switch for Contactor |
| 117 | Replacement of 115 A Contactor |
| 118 | Replacement of 80 A Contactor |
| 119 | Internal Wiring for Starter 50 HP |
| 120 | Providing & Fixing Multi Strand Copper Singal Core Flexible Cable |
| 121 | Provinding & Fixing Copper Cable Lugs |
| 122 | Digital Ammeter |
| 123 | Digital Voltmeter |
| 124 | Ammeter Selector Switch |
| 125 | Indicating Lamp LED in RYB |
| 126 | Providing & Fixing alluminium bus bar as per |
| 127 | Assembling of Starter with Connection & Trial of the set |
| 128 | Repairs Reconditioning of 100 HP ATS |
| 129 | Dismentling of 100 HP ATS |
| 130 | Replacement of CT Oprated Relay Assembly 100 HP |
| 131 | Rewinding of Auto Transformer100 HP |
| 132 | Providing & Fixing terminal plate for Auto Transformer 100 HP |
| 133 | Providing & Fixing Single Phase Preventor for Auto Starter |
| 134 | Replacement of Timer for ATS Starter |
| 135 | Replacement of auxillary switch for Contactor |
| 136 | Replacement of 200 A Contactor |
| 137 | Replacement of 115 A Contactor |
| 138 | Internal Wiring for Starter 100 HP |
| 139 | Providing & Fixing Multi Strand Copper Singal Core Flexible Cable |
| 140 | Provinding & Fixing Copper Cable Lugs |
| 141 | Digital Ammeter |
| 142 | Digital Voltmeter |
| 143 | Ammeter Selector Switch |
| 144 | Indicating Lamp LED in RYB |
| 145 | Providing & Fixing alluminium bus bar as per |
| 146 | Assembling of Starter with Connection & Trial of the set |
| 147 | Repairs Reconditioning of STARTER of 60 HP motor |
| 148 | Repairs Reconditioning of STARTER of 5 HP motor |
| 149 | Repairs Reconditioning of STARTER of 7.5 HP motor |
| 150 | Repairs Reconditioning & Maintenance of 150kVAR APFC Panel |