|
| 1 | Providing, laying, spreading and compacting gradedstone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver. complete as per MoRTH clause 406.Including 1% Labour Cess. |
| 2 | Providing and applying Tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared Primed surface/bitumen surface cleaned with mechanical broom. As per MoRTH Specification-503 for D.B.M.Including 1% Labour Cess &cost of bitumen. |
| 3 | Providing and laying dense graded bituminous macadam 50 mm Thickwith higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per centby weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects.Including 1% Labour Cess &cost of bitumen. |
| 4 | Providing and applying Tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared Primed surface/bitumen surface cleaned with mechanical broom. As per MoRTH Specification-503 for B.C.Including 1% Labour Cess &cost of bitumen. |
| 5 | Providing and laying bituminous concrete 30/40 mm thick withhigher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4per centof mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction As per MORTH specification clause No.-507 complete in all respects.Including 1% Labour Cess &cost of bitumen. |
| 6 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.Including 1% Labour Cess. |
| 7 | The routine maintenance of above road work including embankment, patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition duringthe entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T & P labour but excluding GST) for 1st Year maintenance cost @ 0.00% of Tendered cost of Constructionas per circular No.-3689 C-OPRMC/Mool/2023-24 Dt 17.02.2024 |
| 8 | The routine maintenance of above road work including embankment, patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition duringthe entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T & P labour but excluding GST) for 2nd Year maintenance cost @ 0.25% of Tendered cost of Constructionas per circular No.-3689 C-OPRMC/Mool/2023-24 Dt 17.02.2024 |
| 9 | The routine maintenance of above road work including embankment, patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition duringthe entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T & P labour but excluding GST) for 3rd Year maintenance cost @ 0.50% of Tendered cost of Constructionas per circular No.-3689 C-OPRMC/Mool/2023-24 Dt 17.02.2024 |
| 10 | The routine maintenance of above road work including embankment, patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition duringthe entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T & P labour but excluding GST) for 4th Year maintenance cost @ 0.75% of Tendered cost of Constructionas per circular No.-3689 C-OPRMC/Mool/2023-24 Dt 17.02.2024 |
| 11 | The routine maintenance of above road work including embankment, patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition duringthe entire maintenance period which begins from the actual Completion Date and ends after five years.(including cost of material T & P labour but excluding GST) for 5th Year maintenance cost @ 1.00% of Tendered cost of Constructionas per circular No.-3689 C-OPRMC/Mool/2023-24 Dt 17.02.2024 |