| 1 | Execution of works |
| 2 | Supply and stacking of materials for pointing to the walls etc with lime-sand surkhi mortar (1:1:1) mixing with organic materials.Labour-Materials:-1. Un-slaked Lime: - 704.34 kg 2. Brick surkhi: - 1.11 cum 3. River Sand: - 1.11cum 4. Mollasis-11.705. Bel fruit gum-46.80 nos.6. Gul nut-7.02 kg 7. Mati dal-4.68 kg 8. White katha- 1.17kg9. Methi- 2.34 10. Sika latex-2.34 ltr |
| 3 | Supply and stacking of following materials for renewing lime concrete in (1:2:4) of lime, surkhi and brick aggregate mixing with organic materials including beating upto 7 days to the floor and roof after removal of old damaged decomposed and deteriorated lime concrete/rubbish etc.Materials:-1. Un-slaked Lime: - 1435.77 kg 2. Brick surkhi: - 2.26cum 3. River Sand: - 2.26 cum 4. Brick Aggrigate-9.06 cum 5. Mollasis-23.85 kg6. Bel fruit gum-95.40 nos. 7. Gul nut-14.31 kg 8. Mati dal-9.54 kg 9. White katha- 2.38kg10. Methi- 4.77 11. Sika latex-4.77 ltr |
| 4 | Supply and stacking of materials for restoration of ancient structure with 15% old bricks and 85% new special size bricks (25 X 17 X 4 cm) and lime-sand-surkhi (1:1:1) mortar with organic materials.Labour:- Materials:-1 Special Size bricks (25x17x4 cm): - 16,065.00 nos. 2 Un-slaked Lime: - 3250.80 kg 3 Brick surkhi: - 5.13 cum 4 River Sand: - 5.13cum 5 Mollasis-54.006 Bel fruit gum-216 nos. 7 Gul nut-32.40 kg 8 Mati dal-21.60 kg 9 White katha- 5.40kg10 Methi- 10.80 11 Sika latex-10.80ltr |
| 5 | Supply and stacking of following materials for water tightening of the ancient structure with new special size brick and lime-sand-surkhi (1:1:1) mortar with organic materialsmaterials.Labour:-Materials:-1 Special Size bricks (25x17x4 cm): - 17,850.00 nos. 2 Un-slaked Lime: - 3070.20 kg 3 Brick surkhi: - 4.85 cum 4 River Sand: - 4.85cum 5 Mollasis-51.006 Bel fruit gum-204 nos. 7 Gul nut-30.60 kg 8 Mati dal-20.40 kg 9 White katha- 5.10kg10 Methi- 10.20 11. Sika latex-10.20ltr |
| 6 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m: All kinds of soil. |
| 7 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. |
| 8 | Provision for flat brick soling with common brunt clay non modular bricks including filling joints with local sand. |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement :2 coarse sand (zone-III) derived from natural sources :4 graded stone aggregate 20 mm nominal size derived from natural sources) |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:4 (1cement: 4 coarse sand) |
| 11 | Brick on edge flooring with bricks of class designation 7.5 on a bed of 12 mm cement mortar, including filling the joints with same mortar, with common burnt clay non modular bricks: 1:4 (1 cement : 4 coarse sand) |
| 12 | Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand): Flush / Ruled/ Struck or weathered pointing |
| 13 | Provision for photogrammetric survey with the help of GPS enabled drone of the monument and its periphery up-to 10 m to make 3 dimensional visualization of the whole structure by any recognized firm/agency including all cost etc. complete. |
| 14 | Provision for detailed architectural drawing of whole structure (such as plan, elevation, sections, top view, side view etc.) of the monument structure by any recognized Firm/Agency including all cost etc. complete |
| 15 | Provision for U-PVC pipes (working pressure 4 kg / cm²) Single socketed pipe 110 mm dia for rain water logout. |
| 16 | Provision for tarpaulin sheet for cover the ancient structure during the execution of conservation works |
| 17 | Provision for signage/direction board / notice board including all cost etc, as per requirement of the site. |