| 1 | Raising manhole cover and frame with CBW (1:4), 375 mm thick up to 100mm high with 20mm thick sand and cement plaster including finishing with neat cement after cutting the asphaltum pavement and taking out and re-fixing the existing manhole cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. , Ref - Rate based on PWD Current SOR, PWD(R&B) 2018, p-233 (it -2.05), p-332(it-18.06), p-222 sl-5(a), p-332 (it -18.05)), pg-227, I-1.03, pg-230,Table-I , Table III-2 pg-226, PWD(B) 2017 , p-189 (it -1) and 3rd corria. & Adda., p-49&50, Date 04.06.2018, p-192 (it -15), p-26 (it -10(i)), consumption chart pg-B-60, sl-3 and Annex-II , Format-A & 3rd Corr. & adda. dtd-04.06.2018, p-303 , p-191 (i -6)and 3rd Corr. & Adda, page-52, p-303, p-269 (it -1) and 1st Corria & Adda, Page-4, Date 08.01.2018, page-12 (item -13) |
| 2 | Picking up and removing old bituminous layer or sand sealing coat from old black topped surface and cleaning the exposed surface by scraping and stacking the material as directed. (c) By mechanical means (with milling machine) : Cold milling of Bituminous Pavement surface upto the required depth by mechanical means using milling machine, without disturbing the under laying layers, to proper line and level, cleaning the surface properly after milling and removing the loose materials, stacking the milled materials for re-use, necessary guarding, barricading & lighting, including hire charges of machinery, cost of fuel and labour and other incidental charges all complete and as per direction of Engineer-in-charge. (i) For depth upto 100mm , Ref - PWD (Rds & Brdgs)-2018, It. No. 18.02 Page No.331 |
| 3 | Tack Coat: Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS:8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour,cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) On Granular Surfaces treated with primer (Using Bitumen Emulsion at the rate of 0.25 to 0.30 kg per sqm.) , Ref - Rate as per PWD(WB) schedule of rates 2018 (Roads & Bridge Work), page-213(table-3.3-1) & 251 (item-5.02) |
| 4 | DENSE BITUMINOUS MACADAM [Using Bitumen VG-40 (30/40)] Providing and laying dense bituminous macadam with Hot Mix Plant using crushed aggregate of specified grading, filler(Cement /hydrated lime / Rock dust) premixed with bituminous binder of approved grade @4.0% (min) for Grading -1 and 4.5% (min) for Grading -2 by weight of total mix as per table 500-10 and mix design done as per table 500-11 and job mix formula as per clause 505.3.3 of MoRT&H (5th Revision), including screening, cleaning of chips, transporting the hot mix to work site, laying the mixed materials at specified laying temperature, as specified in Table 500-2 with a hydrostatic paver finisher with sensor control to the required grade, level and alignment over prepared surface coated with tack coat, rolling with smooth wheeled and vibratory or tandem rollers or with a pneumatic tyre roller of 12 to 15 tonne weight with a tyre pressure of at least 0.56 Mpa, to achieve the desired density as per clause 505.3.5, all including cost and carriage of bitumen, crushed aggregates, filler materials and hire charges of machinery and equipment for construction and quality control complete as per Clause 505 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). B. For Grading 2 (26.5 mm nominal size, 50-75 mm thick.)(i) Using Batch Type HMP of minimum capacity 100-120 TPH. , Ref - Rate as per PWD(WB) schedule of rates 2018(Roads & Bridge Work),page-213(table- 3.3-1) & 253(item 5.05)./ 8th Addenda &Corrigenda , SOR:2018,7th Addenda & Corrigenda SOR 2018 |
| 5 | Mechanised Mastic Asphalt Providing and laying mastic asphalt by mechanical means done in a centralised batching plant with appropriate built- in pollution control units with specified aggregates and lime stone powder (with Calcium Carbonate content not less than 80%) and approved grade of industrial grade bitumen as per approved design mix, transporting the hot mastic ashphalt to the worksite by thermocontainer with the arrangement of maintaing specified temperature during transport,laying with a paver finisher for spreading and floating the plastic mix uniformly on the surface to the specified width and thickness at correct grade and camber through its heated, distortion free steel float and turning sword distributors, applying uniform size of bitumen coated stonechips at a specified rate, on the laid surface through a power driven chip spreader as per the procedure laid down in Annexure - II of IRC : 107 (2013) all complete as per clause 516 along with IRC : 107 for materials and design mix etc. i) (40mm Thick) (2nd Addenda of PWD NH Wings Schedule,Page 70,Pg-68,Pg-69, PWD SOR 9th Addenda, PWD NH Wing Schedule2019-20- Pg 275,280 & 1st Addenda of PWD NH Wing Schedule.2019-20,) , Ref - CONSOLIDATED RATE BASED ON P.W.D. CURRENT S.O.R |
| 6 | Sub Total |
| 7 | GST 18% |
| 8 | CESS 1% |