}

Tender For Supply Of Main Switch Board, Distribution Boards., mumbai-Maharashtra

Mazagon Dock Limited has published Tender For Supply Of Main Switch Board, Distribution Boards.. Submission Date for this Tender is 25-03-2025. Switch Supply Tenders in mumbai Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

47447016
Corrigendum : Tender For Supply Of Main Switch Board, Distribution Boards.
Tender
Indian
Maharashtra
Mumbai
25-03-2025

Tender Details

Supply Of Main Switch Board, Distribution Boards. Supply Of Main Switch Board, Distribution Boards, Shore Supply Connection Box, External Supply Panel, Rectifier Cum Battery Charger For 06 Ngopv Ships Of Coast Guard Project , Main Switchboard (Msb-1) With Control Section, Distribution Section And Complete Power Management System (Pms) Facility As Per Tsp Section Ii, Para 1.1, 2.1, 3.1 , Main Switchboard (Msb-2) With Control Section, Distribution Section And Complete Power Management System (Pms) Facility As Per Tsp Section Ii, Para 1.1, 2.1, 3.1 , Switchboard For Emergency Diesel Alternator (135Kw) Consisting Of Control Section And Feeder Section As Per Tsp Section Ii, Para 1.1, 2.1, 3.1 , Power Distribution Boards (Pdbs) 415Vac, Mccb Type, 3 Ph In 3 Ph Out , 12 Output With Auto Changeover Facility As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 415Vac, Mccb Type, 3 Ph In 3 Ph Out, 4 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 415Vac, Mccb Type, 3 Ph In 3 Ph Out , 10 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 415Vac, Mccb Type, 3 Ph In 3 Ph Out, 8 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 230Vac, Mcb Type, 3 Ph In 3 Ph Out, 8 Output With Manual Changeover Switch. As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 230Vac, Mcb Type, 3 Ph In 1 Ph Out, 12 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 24Vdc, Mcb Type, 8 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 24Vdc, Mcb Type, 8 Output With Interlock Circuit As Per Tsp Section Ii, Para 2.3, 3.3 , Lighting Distribution Boards (Ldbs) 230Vac, Mcb Type, 1 Ph In 1 Ph Out, 8 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Shore Supply Connection Box (Sscb) As Per Tsp Para 2.4, 3.4 , External Supply Panel Of 800A As Per Tsp Para 2.5, 3.5 , Rectifier Cum Battery Chargers With Batteries 60A 1.5Kw 24Vdc As Per Tsp Para 2.6, 3.6 , Rectifier Cum Battery Chargers With Batteries 130A 3Kw 24Vdc As Per Tsp Para 2.6, 3.6 , On Board Spares (Separate List For Msb, Esb, Pdbs, Esp, Scb) , Documentation (Separate List For Msb, Esb, Pdbs, Esp, Scb) , Installation Material (As Per Tsp) (Separate List For Msb, Esb, Pdbs, Esp, Scb) , Services Of Engineers Installation & Stw For Msb, Esb, Apms, Rectifier Cum Battery Charger. , Services Of Engineers For Hats For Msb, Esb, Apms, Rectifier Cum Battery Charger. , Services Of Engineers For Sats For Msb, Esb, Apms, Rectifier Cum Battery Charger. , Training For Msb, Esb, Apms, Rectifier Cum Battery Charger. , Monthly Warranty Extension Charges For 12 Months Beyond July 2027 To Be Obtained From The Vendor , Represervation Of Charges 06 Months For Msb, Esb, Apms, Rectifier Cum Battery Charger. (If Required) , Main Switchboard (Msb-1) With Control Section, Distribution Section And Complete Power Management System (Pms) Facility As Per Tsp Section Ii, Para 1.1, 2.1, 3.1 , Main Switchboard (Msb-2) With Control Section, Distribution Section And Complete Power Management System (Pms) Facility As Per Tsp Section Ii, Para 1.1, 2.1, 3.1 , Switchboard For Emergency Diesel Alternator (135Kw) Consisting Of Control Section And Feeder Section As Per Tsp Section Ii, Para 1.1, 2.1, 3.1 , Power Distribution Boards (Pdbs) 415Vac, Mccb Type, 3 Ph In 3 Ph Out , 12 Output With Auto Changeover Facility As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 415Vac, Mccb Type, 3 Ph In 3 Ph Out, 4 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 415Vac, Mccb Type, 3 Ph In 3 Ph Out , 10 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 415Vac, Mccb Type, 3 Ph In 3 Ph Out, 8 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 230Vac, Mcb Type, 3 Ph In 3 Ph Out, 8 Output With Manual Changeover Switch. As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 230Vac, Mcb Type, 3 Ph In 1 Ph Out, 12 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 24Vdc, Mcb Type, 8 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Lighting Distribution Boards (Ldbs) 230Vac, Mcb Type, 1 Ph In 1 Ph Out, 8 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Shore Supply Connection Box (Sscb) As Per Tsp Para 2.4, 3.4 , External Supply Panel Of 800A As Per Tsp Para 2.5, 3.5 , Rectifier Cum Battery Chargers With Batteries 60A 1.5Kw 24Vdc As Per Tsp Para 2.6, 3.6 , Rectifier Cum Battery Chargers With Batteries 130A 3Kw 24Vdc As Per Tsp Para 2.6, 3.6 , On Board Spares (Separate List For Msb, Esb, Pdbs, Esp, Scb) , Documentation (Separate List For Msb, Esb, Pdbs, Esp, Scb) , Installation Material (As Per Tsp) (Separate List For Msb, Esb, Pdbs, Esp, Scb) , Service Of Engineers Installation & Stw For Msb, Esb, Apms, Rectifier Cum Battery Charger. , Services Of Engineers For Hats For Msb, Esb, Apms, Rectifier Cum Battery Charger. , Services Of Engineers For Sats For Msb, Esb, Apms, Rectifier Cum Battery Charger. , Training For Msb, Esb, Apms, Rectifier Cum Battery Charger. , Monthly Warranty Extension Charges For 12 Months Beyond Dec 2027 To Be Obtained From The Vendor , Represervation Charges 06 Months For Msb, Esb, Apms, Rectifier Cum Battery Charger. (If Required) , Main Switchboard (Msb-1) With Control Section, Distribution Section And Complete Power Management System (Pms) Facility As Per Tsp Section Ii, Para 1.1, 2.1, 3.1 , Main Switchboard (Msb-2) With Control Section, Distribution Section And Complete Power Management System (Pms) Facility As Per Tsp Section Ii, Para 1.1, 2.1, 3.1 , Switchboard For Emergency Diesel Alternator (135Kw) Consisting Of Control Section And Feeder Section As Per Tsp Section Ii, Para 1.1, 2.1, 3.1 , Power Distribution Boards (Pdbs) 415Vac, Mccb Type, 3 Ph In 3 Ph Out , 12 Output With Auto Changeover Facility As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 415Vac, Mccb Type, 3 Ph In 3 Ph Out, 4 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 415Vac, Mccb Type, 3 Ph In 3 Ph Out , 10 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 415Vac, Mccb Type, 3 Ph In 3 Ph Out, 8 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 230Vac, Mcb Type, 3 Ph In 3 Ph Out, 8 Output With Manual Changeover Switch. As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 230Vac, Mcb Type, 3 Ph In 1 Ph Out, 12 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 24Vdc, Mcb Type, 8 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Lighting Distribution Boards (Ldbs) 230Vac, Mcb Type, 1 Ph In 1 Ph Out, 8 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Shore Supply Connection Box (Sscb) As Per Tsp Para 2.4, 3.4 , External Supply Panel Of 800A As Per Tsp Para 2.5, 3.5 , Rectifier Cum Battery Chargers With Batteries 60A 1.5Kw 24Vdc As Per Tsp Para 2.6, 3.6 , Rectifier Cum Battery Chargers With Batteries 130A 3Kw 24Vdc As Per Tsp Para 2.6, 3.6 , On Board Spares (Separate List For Msb, Esb, Pdbs, Esp, Scb) , Documentation (Separate List For Msb, Esb, Pdbs, Esp, Scb) , Installation Material (As Per Tsp) (Separate List For Msb, Esb, Pdbs, Esp, Scb) , Services Of Engineers Installation & Stw For Msb, Esb, Apms, Rectifier Cum Battery Charger. , Services Of Engineers For Hats For Msb, Esb, Apms, Rectifier Cum Battery Charger. , Services Of Engineers For Sats For Msb, Esb, Apms, Rectifier Cum Battery Charger. , Training For Msb, Esb, Apms, Rectifier Cum Battery Charger. , Monthly Warranty Extension Charges For 12 Months Beyond May 2028 To Be Obtained From The Vendor , Represervation Charges 06 Months For Msb, Esb, Apms, Rectifier Cum Battery Charger. (If Required) , Main Switchboard (Msb-1) With Control Section, Distribution Section And Complete Power Management System (Pms) Facility As Per Tsp Section Ii, Para 1.1, 2.1, 3.1 , Main Switchboard (Msb-2) With Control Section, Distribution Section And Complete Power Management System (Pms) Facility As Per Tsp Section Ii, Para 1.1, 2.1, 3.1 , Switchboard For Emergency Diesel Alternator (135Kw) Consisting Of Control Section And Feeder Section As Per Tsp Section Ii, Para 1.1, 2.1, 3.1 , Power Distribution Boards (Pdbs) 415Vac, Mccb Type, 3 Ph In 3 Ph Out , 12 Output With Auto Changeover Facility As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 415Vac, Mccb Type, 3 Ph In 3 Ph Out, 4 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 415Vac, Mccb Type, 3 Ph In 3 Ph Out , 10 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 415Vac, Mccb Type, 3 Ph In 3 Ph Out, 8 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 230Vac, Mcb Type, 3 Ph In 3 Ph Out, 8 Output With Manual Changeover Switch. As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 230Vac, Mcb Type, 3 Ph In 1 Ph Out, 12 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 24Vdc, Mcb Type, 8 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Lighting Distribution Boards (Ldbs) 230Vac, Mcb Type, 1 Ph In 1 Ph Out, 8 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Shore Supply Connection Box (Sscb) As Per Tsp Para 2.4, 3.4 , External Supply Panel Of 800A As Per Tsp Para 2.5, 3.5 , Rectifier Cum Battery Chargers With Batteries 60A 1.5Kw 24Vdc As Per Tsp Para 2.6, 3.6 , Rectifier Cum Battery Chargers With Batteries 130A 3Kw 24Vdc As Per Tsp Para 2.6, 3.6 , On Board Spares (Separate List For Msb, Esb, Pdbs, Esp, Scb) , Documentation (Separate List For Msb, Esb, Pdbs, Esp, Scb) , Installation Material (As Per Tsp) (Separate List For Msb, Esb, Pdbs, Esp, Scb) , Services Of Engineers For Installation & Stw For Msb, Esb, Apms, Rectifier Cum Battery Charger. , Services Of Engineers For Hats For For Msb, Esb, Apms, Rectifier Cum Battery Charger. , Services Of Engineers For Sats For For Msb, Esb, Apms, Rectifier Cum Battery Charger. , Training For Msb, Esb, Apms, Rectifier Cum Battery Charger. , Monthly Warranty Extension Charges For 12 Months Beyond Oct 2028 To Be Obtained From The Vendor , Represervation Charges 06 Months For Msb, Esb, Apms, Rectifier Cum Battery Charger. (If Required) , Main Switchboard (Msb-1) With Control Section, Distribution Section And Complete Power Management System (Pms) Facility As Per Tsp Section Ii, Para 1.1, 2.1, 3.1 , Main Switchboard (Msb-2) With Control Section, Distribution Section And Complete Power Management System (Pms) Facility As Per Tsp Section Ii, Para 1.1, 2.1, 3.1 , Switchboard For Emergency Diesel Alternator (135Kw) Consisting Of Control Section And Feeder Section As Per Tsp Section Ii, Para 1.1, 2.1, 3.1 , Power Distribution Boards (Pdbs) 415Vac, Mccb Type, 3 Ph In 3 Ph Out , 12 Output With Auto Changeover Facility As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 415Vac, Mccb Type, 3 Ph In 3 Ph Out, 4 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 415Vac, Mccb Type, 3 Ph In 3 Ph Out , 10 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 415Vac, Mccb Type, 3 Ph In 3 Ph Out, 8 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 230Vac, Mcb Type, 3 Ph In 3 Ph Out, 8 Output With Manual Changeover Switch. As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 230Vac, Mcb Type, 3 Ph In 1 Ph Out, 12 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 24Vdc, Mcb Type, 8 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Lighting Distribution Boards (Ldbs) 230Vac, Mcb Type, 1 Ph In 1 Ph Out, 8 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Shore Supply Connection Box (Sscb) As Per Tsp Para 2.4, 3.4 , External Supply Panel Of 800A As Per Tsp Para 2.5, 3.5 , Rectifier Cum Battery Chargers With Batteries 60A 1.5Kw 24Vdc As Per Tsp Para 2.6, 3.6 , Rectifier Cum Battery Chargers With Batteries 130A 3Kw 24Vdc As Per Tsp Para 2.6, 3.6 , On Board Spares (Separate List For Msb, Esb, Pdbs, Esp, Scb) , Documentation (Separate List For Msb, Esb, Pdbs, Esp, Scb) , Installation Material (As Per Tsp) (Separate List For Msb, Esb, Pdbs, Esp, Scb) , Services Of Engineers Installation & Stw For Msb, Esb, Apms, Rectifier Cum Battery Charger. , Services Of Engineers Hats For Msb, Esb, Apms, Rectifier Cum Battery Charger. , Services Of Engineers Sats For Msb, Esb, Apms, Rectifier Cum Battery Charger. , Training For Msb, Esb, Apms, Rectifier Cum Battery Charger. , Monthly Warranty Extension Charges For 12 Months Beyond Mar 2029 To Be Obtained From The Vendor , Represervation Charges 06 Months For Msb, Esb, Apms, Rectifier Cum Battery Charger. (If Required) , Main Switchboard (Msb-1) With Control Section, Distribution Section And Complete Power Management System (Pms) Facility As Per Tsp Section Ii, Para 1.1, 2.1, 3.1 , Main Switchboard (Msb-2) With Control Section, Distribution Section And Complete Power Management System (Pms) Facility As Per Tsp Section Ii, Para 1.1, 2.1, 3.1 , Switchboard For Emergency Diesel Alternator (135Kw) Consisting Of Control Section And Feeder Section As Per Tsp Section Ii, Para 1.1, 2.1, 3.1 , Power Distribution Boards (Pdbs) 415Vac, Mccb Type, 3 Ph In 3 Ph Out , 12 Output With Auto Changeover Facility As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 415Vac, Mccb Type, 3 Ph In 3 Ph Out, 4 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 415Vac, Mccb Type, 3 Ph In 3 Ph Out , 10 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 415Vac, Mccb Type, 3 Ph In 3 Ph Out, 8 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 230Vac, Mcb Type, 3 Ph In 3 Ph Out, 8 Output With Manual Changeover Switch. As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 230Vac, Mcb Type, 3 Ph In 1 Ph Out, 12 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 24Vdc, Mcb Type, 8 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Lighting Distribution Boards (Ldbs) 230Vac, Mcb Type, 1 Ph In 1 Ph Out, 8 Output As Per Tsp Section Ii, Para 2.3, 3.3 , Shore Supply Connection Box (Sscb) As Per Tsp Para 2.4, 3.4 , External Supply Panel Of 800A As Per Tsp Para 2.5, 3.5 , Rectifier Cum Battery Chargers With Batteries 60A 1.5Kw 24Vdc As Per Tsp Para 2.6, 3.6 , Rectifier Cum Battery Chargers With Batteries 130A 3Kw 24Vdc As Per Tsp Para 2.6, 3.6 , On Board Spares (Separate List For Msb, Esb, Pdbs, Esp, Scb) , Documentation (Separate List For Msb, Esb, Pdbs, Esp, Scb) , Installation Material (As Per Tsp) (Separate List For Msb, Esb, Pdbs, Esp, Scb) , Services Of Engineers Installation & Stw For Msb, Esb, Apms, Rectifier Cum Battery Charger. , Services Of Engineers Hats For Msb, Esb, Apms, Rectifier Cum Battery Charger. , Services Of Engineers Sats For Msb, Esb, Apms, Rectifier Cum Battery Charger. , Training For Msb, Esb, Apms, Rectifier Cum Battery Charger. , Monthly Warranty Extension Charges For 12 Months Beyond Aug 2029 To Be Obtained From The Vendor , Represervation Charges 06 Months For Msb, Esb, Apms, Rectifier Cum Battery Charger. (If Required) , Power Distribution Boards (Pdbs) 24Vdc, Mcb Type, 8 Output With Interlock Circuit As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 24Vdc, Mcb Type, 8 Output With Interlock Circuit As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 24Vdc, Mcb Type, 8 Output With Interlock Circuit As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 24Vdc, Mcb Type, 8 Output With Interlock Circuit As Per Tsp Section Ii, Para 2.3, 3.3 , Power Distribution Boards (Pdbs) 24Vdc, Mcb Type, 8 Output With Interlock Circuit As Per Tsp Section Ii, Para 2.3, 3.3 , Extra Man-Days For 1St Year , Extra Man-Days For 2Nd Year , Extra Man-Days For 1St Year , Extra Man-Days For 2Nd Year , Extra Man-Days For 1St Year , Extra Man-Days For 2Nd Year , Extra Man-Days For 1St Year , Extra Man-Days For 2Nd Year , Extra Man-Days For 1St Year , Extra Man-Days For 2Nd Year , Extra Man-Days For 1St Year , Extra Man-Days For 2Nd Year => Limited

Corrigendum Details

Sr No CorrigendumDate Corrigendum CorrigendumType NewSubmissionDate
1 05-03-2025 Date extension Date 12-03-2025
2 07-03-2025 CHANGE THE TERMS AND CONDITIONS Technical Bid 12-03-2025
3 12-03-2025 Tender due date extension. Date 19-03-2025
4 19-02-2025 Due Date Extension Date 05-03-2025
5 19-03-2025 Extension due date. Date 25-03-2025

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail