Name of Work :- REPAIR, MAINTENANCE & OPERATION WORK OF RWSS LAMBHANA MULWAN-BHATIYAN-KHARA LOHAN-SAREH GANGERI -KHINDASAR-KHINKHIYA PATTA-KHINKHIYA KUNDLIYAN-MIYAKOR UNDER JEN SECTION JHAJHU SUB DIVISION KOLAYAT, DISTT.- BIKANER
Sl. No.
Item Description
1
Part – A.
2
Maintenance of pipelines irrespective of size & materialwhich includes Repairing of Bursts & leakages pollution control, survey & removal of choking, disconnection of illegal connections,Collection & recording minimum 10 nos. residual chlorine samples during daily supply timings, interconnections and all works related to pipeline network in existing distribution /rising main pipe lines of all sizes by digging out suitable size of pit in soft and loose soil/ hard soil including cutting of Black top, WBM & CC top of road of any size at work site. This will also include cutting of pipe ends, fixing of pipe piece with jointing material to make repair leak proof and then refilling of excavated tench / pit / road shall be done properly i.e after a layer of 20 cm with proper watering and ramming in layers. For entirejobcontractorwillusetheir own T & P. Contractor with his own resources shall arrange de-watering,JCB & Tractor compressor if any and restore any amenity at his own cost damaged while performing the work in this item. The work includes daily patrolling and repair the leakages within stipulated time and complete maintenance of pipe line network of rising and distribution pipeline network within the scope of work for per km pipe line per month.Jointing material shall be provided by the department. Minimum labour for a following kms pipelines to be deployed.
3
1 km to 50 km -one fitter-II & one beldar
4
51 km to 100 km - one fitter-II & Two beldar
5
Maintenance of tubewells which includes round the clock monitoring oftubewells of all sizes, completerepairs /rewinding ofsubmersible pump sets including cost ofmaterial components required to repair pumpsets, starters, meters etc. of electric panel of tube wells, Lowering and unlowering of pumpsets complete in all respect, maintenance of log-books & Histroy sheetas directed by Engineer- in-charge for tubewell per month.(ForRural Scheme where three phase electric supply is up to 8 hrs)
6
16.0 HP to 25.0 HP
7
Maintenance ofcentrifugal pump sets and motor/ Monoblock including cost ofrewinding of motor, material components & accessories required to repair pumpsets, starters etc. of electric panels, deinstallation and re installation of pumpsets complete in all respect for per Centrifugal pump set with pannel per month.maintenance ofhistroy sheetas directed by Engineer-in-charge for centrifugal pump set per month.Operated load of Centrifugal Pump sets (HP)
8
6.0 HP to 12.5 HP
9
Running expenditure of pumphouses which includes completeoperation of pumpmotor , maintenance of log-books as directed by Engineer-in-charge, general upkeeping of premises, security arrangements, Regular chemical dosing in CWR, cleaning and desilting of SR/CWR/SUMP once every six months, daily valve operation under the Campus of pump house and all other works as mentioned in scope of work in tender document for per pump house per month. (power supply minimum 16 hrs) (excluding repairing of pumping machinery etc.)
10
Upto 100 HP
11
Running expenditure of pumphouses which includes completeoperation of pumpmotor , maintenance of log-books as directed by Engineer-in-charge, general upkeeping of premises, security arrangements, Regular chemical dosing in CWR, cleaning and desilting of SR/CWR/SUMP once every six months, daily valve operation under the Campus of pump house and all other works as mentioned in scope of work in tender document for per pump house per month. (power supply up to 8 hrs) (excluding repairing of pumping machinery etc.)
12
Upto 50 HP
13
Daily/ periodical operation ofvalves at supply times for specified by department per sluice valve per month.(Valve rod and cap to be arranged by contractor)
14
80-300mm
15
Cleaning of Ground water reservoir ( GLR\"s) of below mentioned capacity including removal of all silt from reservoir, scrapping of wall, disinfection of reservoir after cleaning and disposal of silt up to 1.00 Km lead and painting the date of cleaning on the reservoir.
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.