| 1 | Dismantling reinforced cement concrete or reinforced brick work including stacking of materials as directed by the Engineer-in-charge within a distance of 60 metre (200 feet)..As per uppwd sor s.no.694.including cost of bending wire.including all material, labour, taxes but excluding GST |
| 2 | Dimantling brick work or stone work in lime or cement mortar and including stacking of materials as directed be the Engineer-in-charge within a distance of 60 meter (200 feet). As per uppwd sor s.no .692.including cost of bending wire.including all material, labour, taxes but excluding GST |
| 3 | Laying of hume pipe 600mm dia for diversion of nala water including cost of bending wire.including all material, labour, taxes but excluding GST |
| 4 | Construction of embankment/Patri with approved material obtained from borrow pits with all lifts (Distance 2 km) and all leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. (Ref. to Mort&H S including cost of bending wire.including all material, labour, taxes but excluding GST |
| 5 | M-150 brick on edge pavement on patries laid dry jointsfilling with local sand including prepration of base to proper slope and its ramming spreading layer of 1cm.of local sand over the sub grade including supply of all materials labour T&P etc.proper complitation of the work.S.I.763 including cost of bending wire.including all material, labour, taxes but excluding GST |
| 6 | Removal of unserviceable soil including excavation,loading and disposal up to 1000 meters lead but excluding replacement by sutiable soil which ahall be paid separately as perclause 305 including cost of bending wire.including all material, labour, taxes but excluding GST |
| 7 | Excavation in foundation in ordinarysoil (Loam, clay or sand) including lift upto 1.50 mand lead upto 30 M and including filling watering and ramming of excavated earth into the trenches and removal and disposal of surplusearth as directed by the Engineer in Charge up to distance 30m. SI No. 251(a) including cost of bending wire.including all material, labour, taxes but excluding GST |
| 8 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface., mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, as perMORD specification 401 including cost of bending wire.including all material, labour, taxes but excluding GST |
| 9 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.(M-10)(P.C.C) including cost of bending wire.including all material, labour, taxes but excluding GST |
| 10 | Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5(M-30) including cost of bending wire.including all material, labour, taxes but excluding GST |
| 11 | M.S. (tor steel or plain) in Plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel & its wastage, bend, hooks, and authorised overlapping shall be measured and including cost of binding wire.As per UPPWD SOR no 504 including cost of bending wire.including all material, labour, taxes but excluding GST |
| 12 | Supply & Fixing of 100 mm dia Drainage Spouts of MS with gratings as per drawing including cost of all materials, labour, T & P etc. required for proper completion of the workas per drawing and Technical specification.including cost of bending wire.including all material, labour, taxes but excluding GST |
| 13 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification. including cost of bending wire.including all material, labour, taxes but excluding GST |
| 14 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 80 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications including cost of bending wire.including all material, labour, taxes but excluding GST |
| 15 | Providing pressure relief pipes 100 mm dia in bottom slab of box cell on a filter media base of 500 mm x 500 mm as per drawing and technical specification Clause 1205.5.7 including cost of bending wire.including all material, labour, taxes but excluding GST |
| 16 | Painting and lattering on both side parapet including cost of bending wire.including all material, labour, taxes but excluding GST |
| 17 | Excavation in foundation in ordinarysoil (Loam, clay or sand) including lift upto 1.50 mand lead upto 30 M and including filling watering and ramming of excavated earth into the trenches and removal and disposal of surplusearth as directed by the Engineer in Charge up to distance 30m. SI No. 251(a) including cost of bending wire.including all material, labour, taxes but excluding GST |
| 18 | Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.including cost of bending wire.including all material, labour, taxes but excluding GST |
| 19 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface., mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, as perMORD specification 401 including cost of bending wire.including all material, labour, taxes but excluding GST |
| 20 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. including cost of bending wire.including all material, labour, taxes but excluding GST |
| 21 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smoothwheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause 405.including cost of bending wire.including all material, labour, taxes but excluding GST |
| 22 | Providing and applying tack coat with bitumen VG-10 grade using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared granular surface treated with primer & cleaned with hydraulic broom as per Technical Specification Clause 503 including cost of bending wire.including all material, labour, taxes but excluding GST |
| 23 | Providing and laying and rolling of open graded premix carpet by Manual Means of 20 mm thickness composed of 13.2 mm to 5.6 mm agregates using V.G.-10 grade bitumen bitumen to required line grade and level to serve as wearing course on previously prepared base by manual MORD specific ations 508 including cost of bending wire.including all material, labour, taxes but excluding GST |
| 24 | Providing and laying seal coat by manual means with 80/100 grade bitumen sealing the voids in bitumens surface laid to the specified levels grade and cross fall using type C as per Technical Specification Clause 510 including cost of bending wire.including all material, labour, taxes but excluding GST |