| 1 | PART-A (Material) |
| 2 | Following materials supplied by the contractor :- |
| 3 | F-Clamp For PCC Pole. |
| 4 | Holding Clamp Pole |
| 5 | 11 KV Pin insulator Polymer |
| 6 | 11 KV Disc insulator with fitting |
| 7 | Bolts & Nuts |
| 8 | Alluminium paint |
| 9 | Safe carriage/cartage of following items from Store Centre, Sultanpur to work site including loading, unloading and proper stacking (distance within0-50 Km.) |
| 10 | Safe carriage of PCC Pole 8.5 Mtr. Long |
| 11 | Safe carriage ofSTP 11 Mtr Long SP-55 |
| 12 | Safe carriage of ACSR Weasal Conductor |
| 13 | Safe carriage of 11 KV XLPE Cable 3x120 sq.mm |
| 14 | Safe carriage of AB Cable (1x25+1x16+3x95) sq.mm |
| 15 | Safe carriage of Other Line Materials |
| 16 | Safe carriage ofT/F 25 KVA |
| 17 | Safe carriage ofT/F 63 KVA |
| 18 | Safe carriage of Met. Cub Pilfer Proof 11 KV CTR 15/5 Amp. |
| 19 | Safe carriage of Met. U O/D Type CT/PT Unit 11 KV CTR 15/5 Amp. |
| 20 | Dragging of PCC Pole from site to pit point |
| 21 | Dragging of STP from site to pit point |
| 22 | Fabrication & erection of single pole support on PCC Pole including digging of pit & fixing of all accessories and clampsincluding grouting & earthing of pole and stud pole 5 No. as per RESPO norms. |
| 23 | Fabrication & erection of double pole support on PCC Pole including digging of pit & fixing of all accessories and clampsincluding grouting & earthing of pole as per RESPO norms. |
| 24 | Fabrication & erection of single pole support on STP pole including digging of pit & fixing of all accessories and clampsincluding grouting & earthing of pole as per RESPO norms. |
| 25 | Mounting of 25 KVA T/F on double pole. |
| 26 | Mounting of 63 KVA T/F on double pole. |
| 27 | Laying Stringing & sagging of 11 KV XLPE Cable (3x120) sq.mm. |
| 28 | Laying Stringing & sagging of AB Cable (1x25+1x16+3x95) sq.mm. |
| 29 | Laying Stringing & sagging of new ACSR Weasal Conductor including binding jumpering etc. |
| 30 | Making of Cable Box 1/D 11 KV XLPE 3x120 sq.mm. |
| 31 | Making of Cable Box O/D 11 KV XLPE 3x120 sq.mm. |
| 32 | Providing and installation ofBoring type earthing by GI Pipe and GI Strip as per approved drawing including all requred man and material. |
| 33 | Earthing of Transformer through earthing rod as per approved drawing including all requred manpower. |
| 34 | Hosting of 11 KV Cable along with fixing of G.I. Pipe 6 \" Dia and Clamps |
| 35 | Civil Material for Cable Laying (B and S) |
| 36 | Installation of Met. Cub Pilfer Proof 11 KV CTR 15/5 Amp. |
| 37 | Installation of Met. U O/D Type CT/PT Unit 11 KV CTR 15/5 Amp. |
| 38 | Stay Complete |